

Instructions
P/N 102139801
Stacking Instructions For:
GB560 Series GBX560 Series
GB1060 Series GBX1060 Series
Kold-Draft International, LLC 1525 East Lake Road Erie. PA 16511-1088 U.S.A. 814-453-6761 FAX: 814-455-6336 www.kold-draft.com
Doc# 307107901 9/18


SAFE OPERATION AND MAINTENANCE OF KOLD-DRAFT EQUIPMENT. REFER ALL
INSTALLATION AND SERVICE WORK TO QUALIFIED TECHNICIANS.
THE EQUIPMENT WILL NOT BE USED FOR A PERIOD OF TIME. SOME CIRCUITS REMAIN
ENERGIZED WHEN THE ICE MACHINE IS SWITCHED OFF.
NEVER OPERATE EQUIPMENT THAT HAS BEEN DAMAGED OR DOES NOT HAVE ALL THE
PROTECTIVE COVERS IN PLACE.
SPECIFICATIONS.
SPECIAL ATTENTION SHOULD BE GIVEN TO POTENTIAL HAZARD LABELING ON THE EQUIPMENT AND THE SIGNAL WORDS AND SYMBOLS THAT ARE USED THROUGHOUT THIS
MANUAL.
INSTRUCT ALL PERSONNEL IN THE PROPER USE OF THE EQUIPMENT.
CLEAN UP ANY SPILLAGE IMMEDIATELY.
FAILURE TO COMPLY WITH ALL KOLD-DRAFT INSTALLATION GUIDELINES MAY CAUSE PERSONAL INJURY, EQUIPMENT OR PROPERTY DAMAGE AND MAY VOID THE PRODUCT
WARRANTY.

Remove the cabinet panels from the upper and lower ice machines. Mount the frame spacers on the top side panel flanges of the lower ice machine frame. Position so the spacer holes are aligned with the holes in the frame (see illustration below). For standard GB Series ice machines, position the front panel hanger on the top front rail of the lower ice machine (see illustration below).
GB SERIES AND GBX SERIES

SIDE FRAME OF LOWER ICE MACHINE
FRONT PANEL HANGER PLACEMENT
GB SERIES ONLY

TOP FRONT RAIL OF LOWER ICE MACHINE

For GBX Series ice machines, a front panel hanger is not used. Instead a black panel trim is placed over the top of the lower ice machines front panel, when the front panel is mounted (see illustration below).
GBX SERIES PANEL TRIM

GBX SERIES FRONT PANEL
TOP FRONT RAIL OF LOWER ICE MACHINE
Apply the gasket provided to the top of the lower ice machine frame as shown. Place the gasket over the frame spacers to secure them in position (see illustration below).


Position the stacking chute in the lower machine as shown. Locate on the support channels, against the partition wall.

Carefully lift the upper machine and place it on top of the lower machine and align the frames. Fasten the frames together using the screws, washers and lock nuts provided (see illustration below).


Replace the front and back deflectors, provided with the ice machine, with the deflectors provided in the stacking kit. Install the deflectors into the slots in the back wall and front rail. Push down on the deflectors until they engage the stacking chute and snap in place.

Feed the bin probe from the upper machine, through one of the holes in the upper machine condensing unit pan and position in one of the holes in the lower ice machine condensing unit pan and adjust as required (illustration below).

この取扱説明書で参照されているリンク(メーカー、サポート、ダウンロード等)。
ユーザーまたはスタッフが通常1日以内に回答します。あなたの質問が次の人の助けにもなります。
最初の質問を投稿しましょう。他のユーザーや当チームが回答します。