JA
公式取扱説明書

NetShelter Aisle Containment System

124 ページ·13.8 MB·アクセサリー·PDF·EN
NetShelter Aisle Containment System
目次 140セクション General Information · Important Safety Information · Documentation Information · Cross-reference symbol used in this manual · … 表示非表示
General Informationp.9Important Safety Informationp.9Documentation Informationp.9Cross-reference symbol used in this manualp.9Manual updatesp.10Unpacking and Inspectingp.10Systems Overviewp.11Basic configurationsp.11Component Identificationp.12Ceiling and Duct Componentsp.12Ceiling panel mounting rail system—ACDC2000–ACDC2002p.12Ceiling panel mounting rail—ACDC2003p.13Ceiling panel wall mount—single row—ACDC2004p.14Ceiling panel rail mounting brackets (cooling/racks)—ACDC2005p.15Ceiling panel rail mounting brackets (power)—ACDC2006p.16Ceiling panel lock system without power supply—ACDC2015p.17Ceiling panel lock system with power supply—ACDC2016, ACDC2017p.18Aisle containment lighting kit—ACDC2018, ACDC2019p.18Duct lighting mounting support without lights—ACDC2302p.19Ceiling panel—ACDC2100 – ACDC2107p.19Adjustable mounting kits components—ACDC2200–ACDSC2203p.20Mounting brackets, adjustable mounting support (cooling/racks)—ACDC2204p.21Mounting brackets, adjustable mounting support (power)—ACDC2205p.22Duct mounting rail—ACDC2300p.23Duct mounting rail expansion—ACDC2301 (used with ACDC2300)p.24Duct panel—ACDC2303 – ACDC2310p.24Duct panel frame extension, 1200–1800 mm (48–72 in.)—ACDC2311p.25Door system componentsp.26Aisle containment door—ACDC2400p.26Door header—ACDC2401, ACDC2402, ACDC2403p.27Door post, 900–1200 mm (36–48 in.) aisle width—ACDC2404p.28Door post, 1200–1500 mm (48–60 in.) aisle width—ACDC2405p.29Door post, 1500–1800 mm (60–72 in.) aisle width—ACDC2406p.30Door handle lock—ACDC2408p.31Curtain door mounting rail—ACDC2410, ACDC2411p.32Curtain door strip—ACAC11008, ACAC11009p.33Height/Depth Adapters and Blanking Panelsp.34Height adapter kits componentsp.34Depth adaptersp.34Blanking panelp.34Planning the Installationp.35General guidelines for installationp.35Installation Procedure Overviewp.36Dual-row ceiling containmentp.36Dual-row ductedp.37Critical Dimensionsp.38Using the critical dimensions tablep.38Hot aisle containment dimensionsp.39Cold aisle containment dimensionsp.40List of Recommended Toolsp.41Fastener Informationp.42How to work with the channel nutsp.42Before You Beginp.43Safetyp.43Main Componentsp.44Enclosures and Power Equipmentp.44Layout and Positioningp.44Height Adapter and Depth Extenderp.46Ceiling and Duct System Support Bracketsp.47Support Bracket Types Overviewp.47Support Bracket Installationp.48Typical bracket placement—side view (duct system shown)p.48Typical bracket placement—top view (duct system shown)p.48SX enclosures and InRow RC, frontp.48InRow RC/RD/RA rear and Airflow racksp.49PDU, PDPM, VX enclosurep.50SX enclosures and InRow RC, frontp.52Airflow racks and InRow RC/RA rearp.53VX Enclosure, PDU duct system, PDU, and PDPMp.54Horizontal panel support bracket and corners for duct systemp.54For ACDA901 enclosuresp.55Duct Systemp.56Installation Overviewp.56Component identificationp.56Typical order of installationp.56How to cut materialp.57Adjusting the Size Of the Duct Panels and Railsp.59Horizontal and vertical duct panel size adjustmentp.59Horizontal panel (ACDC2305, ACDC2306) and air block panel (ACDC2303, ACDC2304) adjustment calculationsp.61Adjusting the size of the duct mounting railsp.62Horizontal Duct Panel Installationp.63Duct System Installationp.64Rail supportsp.64Duct panels and cross-bracingp.66Adjust the height of the duct assemblyp.68End-of-aisle air block panel—ACDC2303 and ACDC2304p.69Side air block panelsp.70Ceiling Panel Systemp.73Order of Installation Overviewp.73How to Cut Materialp.74Metal extrusionsp.74Clear panelsp.74Installationp.75Install mounting bracketsp.75Install the ceiling panel mounting railsp.75Connecting mounting rails togetherp.77For a single row aisle —ACDC2004p.79Install the air blocks—adjustable mounting brackets onlyp.80Install the ceiling panelsp.81Door Assemblyp.83Installationp.83Safetyp.83Before you beginp.83Installation overviewp.83Door postsp.84Lower door post bracketsp.86Door headerp.87Lower guide railsp.88End caps—SXp.89End caps—VXp.89Install the VX end caps to lower guide rail and enclosure. Hinge postsp.90Thresholdp.91Securing door header to railingp.93Doorsp.101Door handle and lock assemblyp.102Adjust door closing dampersp.102Outer door header cover and blanking panelp.103Post-installation checklistp.104Door Curtainp.105Installation—Ceiling Systemp.105Installation—Duct Systemp.108Horizontal duct panelp.108Ceiling Panel Dropout Control Systemp.110System Diagramp.110Power Supply Component Identificationp.111Installationp.112Power supply installation procedurep.112Electromechanical locksp.113Temperature switchesp.114Electrical boxes and cable routingp.115Alarm beacon installationp.116Smoke detector installationp.117Ceiling Panel Dropout System Setup and Operationp.120Maintenance steps for dropout ceiling systemp.120Troubleshooting diagramp.120Five-Year Factory Warrantyp.121Terms of warrantyp.121Non-transferable warrantyp.121Exclusionsp.121Warranty claimsp.122
Page 1 of the NetShelter Aisle Containment System user manual — ACDC2000—ACDC2006, ACDC2015—ACDC2019, ACDC2100—ACDC2107, ACDC2200—ACDC2205, ACDC2300—ACDC2311, ACDC2400—ACDC2411, ACDC2500—ACDC2518, ACDC2550—ACDC2553, ACDC2575—ACDC2578
1ページ · クリックして拡大
1ページ

NetShelter™

Aisle Containment System

Installation Manual

ACDC2000—ACDC2006, ACDC2015—ACDC2019, ACDC2100—ACDC2107, ACDC2200—ACDC2205, ACDC2300—ACDC2311, ACDC2400—ACDC2411, ACDC2500—ACDC2518, ACDC2550—ACDC2553, ACDC2575—ACDC2578

990-5222D-001

Publication Date: May 2020

NetShelter Aisle Containment System — ACDC2000—ACDC2006, ACDC2015—ACDC2019, ACDC2100—ACDC2107, ACDC2200—ACDC2205, ACDC2300—ACDC2311, ACDC2400—ACDC2411, ACDC2500—ACDC2518, ACDC2550—ACDC2553, ACDC2575—ACDC2578 diagram (page 1)
図 1
Page 2 of the NetShelter Aisle Containment System user manual — APC by Schneider Electric Legal Disclaimer
2ページ · クリックして拡大
2ページ

APC by Schneider Electric Legal Disclaimer

The information presented in this manual is not warranted by the APC by Schneider Electric to be authoritative, error free, or complete. This publication is not meant to be a substitute for a detailed operational and site specific development plan. Therefore, APC by Schneider Electric assumes no liability for damages, violations of codes, improper installation, system failures, or any other problems that could arise based on the use of this Publication.

The information contained in this Publication is provided as is and has been prepared solely for the purpose of evaluating data center design and construction. This Publication has been compiled in good faith by APC by Schneider Electric. However, no representation is made or warranty given, either express or implied, as to the completeness or accuracy of the information this Publication contains.

IN NO EVENT SHALL APC BY SCHNEIDER ELECTRIC, OR ANY PARENT, AFFILIATE OR SUBSIDIARY COMPANY OF APC BY SCHNEIDER ELECTRIC OR THEIR RESPECTIVE OFFICERS, DIRECTORS, OR EMPLOYEES BE LIABLE FOR ANY DIRECT, INDIRECT, CONSEQUENTIAL, PUNITIVE, SPECIAL, OR INCIDENTAL DAMAGES (INCLUDING, WITHOUT LIMITATION, DAMAGES FOR LOSS OF BUSINESS, CONTRACT, REVENUE, DATA, INFORMATION, OR BUSINESS INTERRUPTION) RESULTING FROM, ARISING OUT, OR IN CONNECTION WITH THE USE OF, OR INABILITY TO USE THIS PUBLICATION OR THE CONTENT, EVEN IF APC BY SCHNEIDER ELECTRIC HAS BEEN EXPRESSLY ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. APC BY SCHNEIDER ELECTRIC RESERVES THE RIGHT TO MAKE CHANGES OR UPDATES WITH RESPECT TO OR IN THE CONTENT OF THE PUBLICATION OR THE FORMAT THEREOF AT ANY TIME WITHOUT NOTICE.

Copyright, intellectual, and all other proprietary rights in the content (including but not limited to software, audio, video, text, and photographs) rests with APC by Schneider Electric or its licensors. All rights in the content not expressly granted herein are reserved. No rights of any kind are licensed or assigned or shall otherwise pass to persons accessing this information.

This Publication shall not be for resale in whole or in part.

Page 3 of the NetShelter Aisle Containment System user manual — Table of contents
3ページ · クリックして拡大
3ページ

Table of contents

General Informationp.9Important Safety Informationp.9Documentation Informationp.9Cross-reference symbol used in this manualp.9Manual updatesp.10Unpacking and Inspectingp.10Systems Overviewp.11Basic configurationsp.11Component Identificationp.12Ceiling and Duct Componentsp.12Ceiling panel mounting rail system—ACDC2000–ACDC2002p.12Ceiling panel mounting rail—ACDC2003p.13Ceiling panel wall mount—single row—ACDC2004p.14Ceiling panel rail mounting brackets (cooling/racks)—ACDC2005p.15Ceiling panel rail mounting brackets (power)—ACDC2006p.16Ceiling panel lock system without power supply—ACDC2015p.17Ceiling panel lock system with power supply—ACDC2016, ACDC2017p.18Aisle containment lighting kit—ACDC2018, ACDC2019p.18Duct lighting mounting support without lights—ACDC2302p.19Ceiling panel—ACDC2100 – ACDC2107p.19Adjustable mounting kits components—ACDC2200–ACDSC2203p.20Mounting brackets, adjustable mounting support (cooling/racks)—ACDC2204p.21Mounting brackets, adjustable mounting support (power)—ACDC2205p.22Duct mounting rail—ACDC2300p.23Duct mounting rail expansion—ACDC2301 (used with ACDC2300)p.24Duct panel—ACDC2303 – ACDC2310p.24Duct panel frame extension, 1200–1800 mm (48–72 in.)—ACDC2311p.25Door system componentsp.26Aisle containment door—ACDC2400p.26Door header—ACDC2401, ACDC2402, ACDC2403p.27Door post, 900–1200 mm (36–48 in.) aisle width—ACDC2404p.28Door post, 1200–1500 mm (48–60 in.) aisle width—ACDC2405p.29Door post, 1500–1800 mm (60–72 in.) aisle width—ACDC2406p.30Door handle lock—ACDC2408p.31Curtain door mounting rail—ACDC2410, ACDC2411p.32Curtain door strip—ACAC11008, ACAC11009p.33Height/Depth Adapters and Blanking Panelsp.34Height adapter kits componentsp.34Depth adaptersp.34Blanking panelp.34Planning the Installationp.35General guidelines for installationp.35Installation Procedure Overviewp.36Dual-row ceiling containmentp.36Dual-row ductedp.37Critical Dimensionsp.38Using the critical dimensions tablep.38Hot aisle containment dimensionsp.39Cold aisle containment dimensionsp.40List of Recommended Toolsp.41Fastener Informationp.42How to work with the channel nutsp.42Before You Beginp.43Safetyp.43Main Componentsp.44Enclosures and Power Equipmentp.44Layout and Positioningp.44Height Adapter and Depth Extenderp.46Ceiling and Duct System Support Bracketsp.47Support Bracket Types Overviewp.47Support Bracket Installationp.48Typical bracket placement—side view (duct system shown)p.48Typical bracket placement—top view (duct system shown)p.48SX enclosures and InRow RC, frontp.48InRow RC/RD/RA rear and Airflow racksp.49PDU, PDPM, VX enclosurep.50SX enclosures and InRow RC, frontp.52Airflow racks and InRow RC/RA rearp.53VX Enclosure, PDU duct system, PDU, and PDPMp.54Horizontal panel support bracket and corners for duct systemp.54For ACDA901 enclosuresp.55Duct Systemp.56Installation Overviewp.56Component identificationp.56Typical order of installationp.56How to cut materialp.57Adjusting the Size Of the Duct Panels and Railsp.59Horizontal and vertical duct panel size adjustmentp.59Horizontal panel (ACDC2305, ACDC2306) and air block panel (ACDC2303, ACDC2304) adjustment calculationsp.61Adjusting the size of the duct mounting railsp.62Horizontal Duct Panel Installationp.63Duct System Installationp.64Rail supportsp.64Duct panels and cross-bracingp.66Adjust the height of the duct assemblyp.68End-of-aisle air block panel—ACDC2303 and ACDC2304p.69Side air block panelsp.70Ceiling Panel Systemp.73Order of Installation Overviewp.73How to Cut Materialp.74Metal extrusionsp.74Clear panelsp.74Installationp.75Install mounting bracketsp.75Install the ceiling panel mounting railsp.75Connecting mounting rails togetherp.77For a single row aisle —ACDC2004p.79Install the air blocks—adjustable mounting brackets onlyp.80Install the ceiling panelsp.81Door Assemblyp.83Installationp.83Safetyp.83Before you beginp.83Installation overviewp.83Door postsp.84Lower door post bracketsp.86Door headerp.87Lower guide railsp.88End caps—SXp.89End caps—VXp.89Install the VX end caps to lower guide rail and enclosure. Hinge postsp.90Thresholdp.91Securing door header to railingp.93Doorsp.101Door handle and lock assemblyp.102Adjust door closing dampersp.102Outer door header cover and blanking panelp.103Post-installation checklistp.104Door Curtainp.105Installation—Ceiling Systemp.105Installation—Duct Systemp.108Horizontal duct panelp.108Ceiling Panel Dropout Control Systemp.110System Diagramp.110Power Supply Component Identificationp.111Installationp.112Power supply installation procedurep.112Electromechanical locksp.113Temperature switchesp.114Electrical boxes and cable routingp.115Alarm beacon installationp.116Smoke detector installationp.117Ceiling Panel Dropout System Setup and Operationp.120Maintenance steps for dropout ceiling systemp.120Troubleshooting diagramp.120Five-Year Factory Warrantyp.121Terms of warrantyp.121Non-transferable warrantyp.121Exclusionsp.121Warranty claimsp.122
Page 4 of the NetShelter Aisle Containment System user manual — Table of contents
4ページ · クリックして拡大
4ページ

Table of contents

General Informationp.9Important Safety Informationp.9Documentation Informationp.9Cross-reference symbol used in this manualp.9Manual updatesp.10Unpacking and Inspectingp.10Systems Overviewp.11Basic configurationsp.11Component Identificationp.12Ceiling and Duct Componentsp.12Ceiling panel mounting rail system—ACDC2000–ACDC2002p.12Ceiling panel mounting rail—ACDC2003p.13Ceiling panel wall mount—single row—ACDC2004p.14Ceiling panel rail mounting brackets (cooling/racks)—ACDC2005p.15Ceiling panel rail mounting brackets (power)—ACDC2006p.16Ceiling panel lock system without power supply—ACDC2015p.17Ceiling panel lock system with power supply—ACDC2016, ACDC2017p.18Aisle containment lighting kit—ACDC2018, ACDC2019p.18Duct lighting mounting support without lights—ACDC2302p.19Ceiling panel—ACDC2100 – ACDC2107p.19Adjustable mounting kits components—ACDC2200–ACDSC2203p.20Mounting brackets, adjustable mounting support (cooling/racks)—ACDC2204p.21Mounting brackets, adjustable mounting support (power)—ACDC2205p.22Duct mounting rail—ACDC2300p.23Duct mounting rail expansion—ACDC2301 (used with ACDC2300)p.24Duct panel—ACDC2303 – ACDC2310p.24Duct panel frame extension, 1200–1800 mm (48–72 in.)—ACDC2311p.25Door system componentsp.26Aisle containment door—ACDC2400p.26Door header—ACDC2401, ACDC2402, ACDC2403p.27Door post, 900–1200 mm (36–48 in.) aisle width—ACDC2404p.28Door post, 1200–1500 mm (48–60 in.) aisle width—ACDC2405p.29Door post, 1500–1800 mm (60–72 in.) aisle width—ACDC2406p.30Door handle lock—ACDC2408p.31Curtain door mounting rail—ACDC2410, ACDC2411p.32Curtain door strip—ACAC11008, ACAC11009p.33Height/Depth Adapters and Blanking Panelsp.34Height adapter kits componentsp.34Depth adaptersp.34Blanking panelp.34Planning the Installationp.35General guidelines for installationp.35Installation Procedure Overviewp.36Dual-row ceiling containmentp.36Dual-row ductedp.37Critical Dimensionsp.38Using the critical dimensions tablep.38Hot aisle containment dimensionsp.39Cold aisle containment dimensionsp.40List of Recommended Toolsp.41Fastener Informationp.42How to work with the channel nutsp.42Before You Beginp.43Safetyp.43Main Componentsp.44Enclosures and Power Equipmentp.44Layout and Positioningp.44Height Adapter and Depth Extenderp.46Ceiling and Duct System Support Bracketsp.47Support Bracket Types Overviewp.47Support Bracket Installationp.48Typical bracket placement—side view (duct system shown)p.48Typical bracket placement—top view (duct system shown)p.48SX enclosures and InRow RC, frontp.48InRow RC/RD/RA rear and Airflow racksp.49PDU, PDPM, VX enclosurep.50SX enclosures and InRow RC, frontp.52Airflow racks and InRow RC/RA rearp.53VX Enclosure, PDU duct system, PDU, and PDPMp.54Horizontal panel support bracket and corners for duct systemp.54For ACDA901 enclosuresp.55Duct Systemp.56Installation Overviewp.56Component identificationp.56Typical order of installationp.56How to cut materialp.57Adjusting the Size Of the Duct Panels and Railsp.59Horizontal and vertical duct panel size adjustmentp.59Horizontal panel (ACDC2305, ACDC2306) and air block panel (ACDC2303, ACDC2304) adjustment calculationsp.61Adjusting the size of the duct mounting railsp.62Horizontal Duct Panel Installationp.63Duct System Installationp.64Rail supportsp.64Duct panels and cross-bracingp.66Adjust the height of the duct assemblyp.68End-of-aisle air block panel—ACDC2303 and ACDC2304p.69Side air block panelsp.70Ceiling Panel Systemp.73Order of Installation Overviewp.73How to Cut Materialp.74Metal extrusionsp.74Clear panelsp.74Installationp.75Install mounting bracketsp.75Install the ceiling panel mounting railsp.75Connecting mounting rails togetherp.77For a single row aisle —ACDC2004p.79Install the air blocks—adjustable mounting brackets onlyp.80Install the ceiling panelsp.81Door Assemblyp.83Installationp.83Safetyp.83Before you beginp.83Installation overviewp.83Door postsp.84Lower door post bracketsp.86Door headerp.87Lower guide railsp.88End caps—SXp.89End caps—VXp.89Install the VX end caps to lower guide rail and enclosure. Hinge postsp.90Thresholdp.91Securing door header to railingp.93Doorsp.101Door handle and lock assemblyp.102Adjust door closing dampersp.102Outer door header cover and blanking panelp.103Post-installation checklistp.104Door Curtainp.105Installation—Ceiling Systemp.105Installation—Duct Systemp.108Horizontal duct panelp.108Ceiling Panel Dropout Control Systemp.110System Diagramp.110Power Supply Component Identificationp.111Installationp.112Power supply installation procedurep.112Electromechanical locksp.113Temperature switchesp.114Electrical boxes and cable routingp.115Alarm beacon installationp.116Smoke detector installationp.117Ceiling Panel Dropout System Setup and Operationp.120Maintenance steps for dropout ceiling systemp.120Troubleshooting diagramp.120Five-Year Factory Warrantyp.121Terms of warrantyp.121Non-transferable warrantyp.121Exclusionsp.121Warranty claimsp.122
Page 5 of the NetShelter Aisle Containment System user manual — Table of contents
5ページ · クリックして拡大
5ページ

Table of contents

General Informationp.9Important Safety Informationp.9Documentation Informationp.9Cross-reference symbol used in this manualp.9Manual updatesp.10Unpacking and Inspectingp.10Systems Overviewp.11Basic configurationsp.11Component Identificationp.12Ceiling and Duct Componentsp.12Ceiling panel mounting rail system—ACDC2000–ACDC2002p.12Ceiling panel mounting rail—ACDC2003p.13Ceiling panel wall mount—single row—ACDC2004p.14Ceiling panel rail mounting brackets (cooling/racks)—ACDC2005p.15Ceiling panel rail mounting brackets (power)—ACDC2006p.16Ceiling panel lock system without power supply—ACDC2015p.17Ceiling panel lock system with power supply—ACDC2016, ACDC2017p.18Aisle containment lighting kit—ACDC2018, ACDC2019p.18Duct lighting mounting support without lights—ACDC2302p.19Ceiling panel—ACDC2100 – ACDC2107p.19Adjustable mounting kits components—ACDC2200–ACDSC2203p.20Mounting brackets, adjustable mounting support (cooling/racks)—ACDC2204p.21Mounting brackets, adjustable mounting support (power)—ACDC2205p.22Duct mounting rail—ACDC2300p.23Duct mounting rail expansion—ACDC2301 (used with ACDC2300)p.24Duct panel—ACDC2303 – ACDC2310p.24Duct panel frame extension, 1200–1800 mm (48–72 in.)—ACDC2311p.25Door system componentsp.26Aisle containment door—ACDC2400p.26Door header—ACDC2401, ACDC2402, ACDC2403p.27Door post, 900–1200 mm (36–48 in.) aisle width—ACDC2404p.28Door post, 1200–1500 mm (48–60 in.) aisle width—ACDC2405p.29Door post, 1500–1800 mm (60–72 in.) aisle width—ACDC2406p.30Door handle lock—ACDC2408p.31Curtain door mounting rail—ACDC2410, ACDC2411p.32Curtain door strip—ACAC11008, ACAC11009p.33Height/Depth Adapters and Blanking Panelsp.34Height adapter kits componentsp.34Depth adaptersp.34Blanking panelp.34Planning the Installationp.35General guidelines for installationp.35Installation Procedure Overviewp.36Dual-row ceiling containmentp.36Dual-row ductedp.37Critical Dimensionsp.38Using the critical dimensions tablep.38Hot aisle containment dimensionsp.39Cold aisle containment dimensionsp.40List of Recommended Toolsp.41Fastener Informationp.42How to work with the channel nutsp.42Before You Beginp.43Safetyp.43Main Componentsp.44Enclosures and Power Equipmentp.44Layout and Positioningp.44Height Adapter and Depth Extenderp.46Ceiling and Duct System Support Bracketsp.47Support Bracket Types Overviewp.47Support Bracket Installationp.48Typical bracket placement—side view (duct system shown)p.48Typical bracket placement—top view (duct system shown)p.48SX enclosures and InRow RC, frontp.48InRow RC/RD/RA rear and Airflow racksp.49PDU, PDPM, VX enclosurep.50SX enclosures and InRow RC, frontp.52Airflow racks and InRow RC/RA rearp.53VX Enclosure, PDU duct system, PDU, and PDPMp.54Horizontal panel support bracket and corners for duct systemp.54For ACDA901 enclosuresp.55Duct Systemp.56Installation Overviewp.56Component identificationp.56Typical order of installationp.56How to cut materialp.57Adjusting the Size Of the Duct Panels and Railsp.59Horizontal and vertical duct panel size adjustmentp.59Horizontal panel (ACDC2305, ACDC2306) and air block panel (ACDC2303, ACDC2304) adjustment calculationsp.61Adjusting the size of the duct mounting railsp.62Horizontal Duct Panel Installationp.63Duct System Installationp.64Rail supportsp.64Duct panels and cross-bracingp.66Adjust the height of the duct assemblyp.68End-of-aisle air block panel—ACDC2303 and ACDC2304p.69Side air block panelsp.70Ceiling Panel Systemp.73Order of Installation Overviewp.73How to Cut Materialp.74Metal extrusionsp.74Clear panelsp.74Installationp.75Install mounting bracketsp.75Install the ceiling panel mounting railsp.75Connecting mounting rails togetherp.77For a single row aisle —ACDC2004p.79Install the air blocks—adjustable mounting brackets onlyp.80Install the ceiling panelsp.81Door Assemblyp.83Installationp.83Safetyp.83Before you beginp.83Installation overviewp.83Door postsp.84Lower door post bracketsp.86Door headerp.87Lower guide railsp.88End caps—SXp.89End caps—VXp.89Install the VX end caps to lower guide rail and enclosure. Hinge postsp.90Thresholdp.91Securing door header to railingp.93Doorsp.101Door handle and lock assemblyp.102Adjust door closing dampersp.102Outer door header cover and blanking panelp.103Post-installation checklistp.104Door Curtainp.105Installation—Ceiling Systemp.105Installation—Duct Systemp.108Horizontal duct panelp.108Ceiling Panel Dropout Control Systemp.110System Diagramp.110Power Supply Component Identificationp.111Installationp.112Power supply installation procedurep.112Electromechanical locksp.113Temperature switchesp.114Electrical boxes and cable routingp.115Alarm beacon installationp.116Smoke detector installationp.117Ceiling Panel Dropout System Setup and Operationp.120Maintenance steps for dropout ceiling systemp.120Troubleshooting diagramp.120Five-Year Factory Warrantyp.121Terms of warrantyp.121Non-transferable warrantyp.121Exclusionsp.121Warranty claimsp.122
Page 6 of the NetShelter Aisle Containment System user manual — Table of contents
6ページ · クリックして拡大
6ページ

Table of contents

General Informationp.9Important Safety Informationp.9Documentation Informationp.9Cross-reference symbol used in this manualp.9Manual updatesp.10Unpacking and Inspectingp.10Systems Overviewp.11Basic configurationsp.11Component Identificationp.12Ceiling and Duct Componentsp.12Ceiling panel mounting rail system—ACDC2000–ACDC2002p.12Ceiling panel mounting rail—ACDC2003p.13Ceiling panel wall mount—single row—ACDC2004p.14Ceiling panel rail mounting brackets (cooling/racks)—ACDC2005p.15Ceiling panel rail mounting brackets (power)—ACDC2006p.16Ceiling panel lock system without power supply—ACDC2015p.17Ceiling panel lock system with power supply—ACDC2016, ACDC2017p.18Aisle containment lighting kit—ACDC2018, ACDC2019p.18Duct lighting mounting support without lights—ACDC2302p.19Ceiling panel—ACDC2100 – ACDC2107p.19Adjustable mounting kits components—ACDC2200–ACDSC2203p.20Mounting brackets, adjustable mounting support (cooling/racks)—ACDC2204p.21Mounting brackets, adjustable mounting support (power)—ACDC2205p.22Duct mounting rail—ACDC2300p.23Duct mounting rail expansion—ACDC2301 (used with ACDC2300)p.24Duct panel—ACDC2303 – ACDC2310p.24Duct panel frame extension, 1200–1800 mm (48–72 in.)—ACDC2311p.25Door system componentsp.26Aisle containment door—ACDC2400p.26Door header—ACDC2401, ACDC2402, ACDC2403p.27Door post, 900–1200 mm (36–48 in.) aisle width—ACDC2404p.28Door post, 1200–1500 mm (48–60 in.) aisle width—ACDC2405p.29Door post, 1500–1800 mm (60–72 in.) aisle width—ACDC2406p.30Door handle lock—ACDC2408p.31Curtain door mounting rail—ACDC2410, ACDC2411p.32Curtain door strip—ACAC11008, ACAC11009p.33Height/Depth Adapters and Blanking Panelsp.34Height adapter kits componentsp.34Depth adaptersp.34Blanking panelp.34Planning the Installationp.35General guidelines for installationp.35Installation Procedure Overviewp.36Dual-row ceiling containmentp.36Dual-row ductedp.37Critical Dimensionsp.38Using the critical dimensions tablep.38Hot aisle containment dimensionsp.39Cold aisle containment dimensionsp.40List of Recommended Toolsp.41Fastener Informationp.42How to work with the channel nutsp.42Before You Beginp.43Safetyp.43Main Componentsp.44Enclosures and Power Equipmentp.44Layout and Positioningp.44Height Adapter and Depth Extenderp.46Ceiling and Duct System Support Bracketsp.47Support Bracket Types Overviewp.47Support Bracket Installationp.48Typical bracket placement—side view (duct system shown)p.48Typical bracket placement—top view (duct system shown)p.48SX enclosures and InRow RC, frontp.48InRow RC/RD/RA rear and Airflow racksp.49PDU, PDPM, VX enclosurep.50SX enclosures and InRow RC, frontp.52Airflow racks and InRow RC/RA rearp.53VX Enclosure, PDU duct system, PDU, and PDPMp.54Horizontal panel support bracket and corners for duct systemp.54For ACDA901 enclosuresp.55Duct Systemp.56Installation Overviewp.56Component identificationp.56Typical order of installationp.56How to cut materialp.57Adjusting the Size Of the Duct Panels and Railsp.59Horizontal and vertical duct panel size adjustmentp.59Horizontal panel (ACDC2305, ACDC2306) and air block panel (ACDC2303, ACDC2304) adjustment calculationsp.61Adjusting the size of the duct mounting railsp.62Horizontal Duct Panel Installationp.63Duct System Installationp.64Rail supportsp.64Duct panels and cross-bracingp.66Adjust the height of the duct assemblyp.68End-of-aisle air block panel—ACDC2303 and ACDC2304p.69Side air block panelsp.70Ceiling Panel Systemp.73Order of Installation Overviewp.73How to Cut Materialp.74Metal extrusionsp.74Clear panelsp.74Installationp.75Install mounting bracketsp.75Install the ceiling panel mounting railsp.75Connecting mounting rails togetherp.77For a single row aisle —ACDC2004p.79Install the air blocks—adjustable mounting brackets onlyp.80Install the ceiling panelsp.81Door Assemblyp.83Installationp.83Safetyp.83Before you beginp.83Installation overviewp.83Door postsp.84Lower door post bracketsp.86Door headerp.87Lower guide railsp.88End caps—SXp.89End caps—VXp.89Install the VX end caps to lower guide rail and enclosure. Hinge postsp.90Thresholdp.91Securing door header to railingp.93Doorsp.101Door handle and lock assemblyp.102Adjust door closing dampersp.102Outer door header cover and blanking panelp.103Post-installation checklistp.104Door Curtainp.105Installation—Ceiling Systemp.105Installation—Duct Systemp.108Horizontal duct panelp.108Ceiling Panel Dropout Control Systemp.110System Diagramp.110Power Supply Component Identificationp.111Installationp.112Power supply installation procedurep.112Electromechanical locksp.113Temperature switchesp.114Electrical boxes and cable routingp.115Alarm beacon installationp.116Smoke detector installationp.117Ceiling Panel Dropout System Setup and Operationp.120Maintenance steps for dropout ceiling systemp.120Troubleshooting diagramp.120Five-Year Factory Warrantyp.121Terms of warrantyp.121Non-transferable warrantyp.121Exclusionsp.121Warranty claimsp.122
Page 7 of the NetShelter Aisle Containment System user manual — Table of contents
7ページ · クリックして拡大
7ページ

Table of contents

General Informationp.9Important Safety Informationp.9Documentation Informationp.9Cross-reference symbol used in this manualp.9Manual updatesp.10Unpacking and Inspectingp.10Systems Overviewp.11Basic configurationsp.11Component Identificationp.12Ceiling and Duct Componentsp.12Ceiling panel mounting rail system—ACDC2000–ACDC2002p.12Ceiling panel mounting rail—ACDC2003p.13Ceiling panel wall mount—single row—ACDC2004p.14Ceiling panel rail mounting brackets (cooling/racks)—ACDC2005p.15Ceiling panel rail mounting brackets (power)—ACDC2006p.16Ceiling panel lock system without power supply—ACDC2015p.17Ceiling panel lock system with power supply—ACDC2016, ACDC2017p.18Aisle containment lighting kit—ACDC2018, ACDC2019p.18Duct lighting mounting support without lights—ACDC2302p.19Ceiling panel—ACDC2100 – ACDC2107p.19Adjustable mounting kits components—ACDC2200–ACDSC2203p.20Mounting brackets, adjustable mounting support (cooling/racks)—ACDC2204p.21Mounting brackets, adjustable mounting support (power)—ACDC2205p.22Duct mounting rail—ACDC2300p.23Duct mounting rail expansion—ACDC2301 (used with ACDC2300)p.24Duct panel—ACDC2303 – ACDC2310p.24Duct panel frame extension, 1200–1800 mm (48–72 in.)—ACDC2311p.25Door system componentsp.26Aisle containment door—ACDC2400p.26Door header—ACDC2401, ACDC2402, ACDC2403p.27Door post, 900–1200 mm (36–48 in.) aisle width—ACDC2404p.28Door post, 1200–1500 mm (48–60 in.) aisle width—ACDC2405p.29Door post, 1500–1800 mm (60–72 in.) aisle width—ACDC2406p.30Door handle lock—ACDC2408p.31Curtain door mounting rail—ACDC2410, ACDC2411p.32Curtain door strip—ACAC11008, ACAC11009p.33Height/Depth Adapters and Blanking Panelsp.34Height adapter kits componentsp.34Depth adaptersp.34Blanking panelp.34Planning the Installationp.35General guidelines for installationp.35Installation Procedure Overviewp.36Dual-row ceiling containmentp.36Dual-row ductedp.37Critical Dimensionsp.38Using the critical dimensions tablep.38Hot aisle containment dimensionsp.39Cold aisle containment dimensionsp.40List of Recommended Toolsp.41Fastener Informationp.42How to work with the channel nutsp.42Before You Beginp.43Safetyp.43Main Componentsp.44Enclosures and Power Equipmentp.44Layout and Positioningp.44Height Adapter and Depth Extenderp.46Ceiling and Duct System Support Bracketsp.47Support Bracket Types Overviewp.47Support Bracket Installationp.48Typical bracket placement—side view (duct system shown)p.48Typical bracket placement—top view (duct system shown)p.48SX enclosures and InRow RC, frontp.48InRow RC/RD/RA rear and Airflow racksp.49PDU, PDPM, VX enclosurep.50SX enclosures and InRow RC, frontp.52Airflow racks and InRow RC/RA rearp.53VX Enclosure, PDU duct system, PDU, and PDPMp.54Horizontal panel support bracket and corners for duct systemp.54For ACDA901 enclosuresp.55Duct Systemp.56Installation Overviewp.56Component identificationp.56Typical order of installationp.56How to cut materialp.57Adjusting the Size Of the Duct Panels and Railsp.59Horizontal and vertical duct panel size adjustmentp.59Horizontal panel (ACDC2305, ACDC2306) and air block panel (ACDC2303, ACDC2304) adjustment calculationsp.61Adjusting the size of the duct mounting railsp.62Horizontal Duct Panel Installationp.63Duct System Installationp.64Rail supportsp.64Duct panels and cross-bracingp.66Adjust the height of the duct assemblyp.68End-of-aisle air block panel—ACDC2303 and ACDC2304p.69Side air block panelsp.70Ceiling Panel Systemp.73Order of Installation Overviewp.73How to Cut Materialp.74Metal extrusionsp.74Clear panelsp.74Installationp.75Install mounting bracketsp.75Install the ceiling panel mounting railsp.75Connecting mounting rails togetherp.77For a single row aisle —ACDC2004p.79Install the air blocks—adjustable mounting brackets onlyp.80Install the ceiling panelsp.81Door Assemblyp.83Installationp.83Safetyp.83Before you beginp.83Installation overviewp.83Door postsp.84Lower door post bracketsp.86Door headerp.87Lower guide railsp.88End caps—SXp.89End caps—VXp.89Install the VX end caps to lower guide rail and enclosure. Hinge postsp.90Thresholdp.91Securing door header to railingp.93Doorsp.101Door handle and lock assemblyp.102Adjust door closing dampersp.102Outer door header cover and blanking panelp.103Post-installation checklistp.104Door Curtainp.105Installation—Ceiling Systemp.105Installation—Duct Systemp.108Horizontal duct panelp.108Ceiling Panel Dropout Control Systemp.110System Diagramp.110Power Supply Component Identificationp.111Installationp.112Power supply installation procedurep.112Electromechanical locksp.113Temperature switchesp.114Electrical boxes and cable routingp.115Alarm beacon installationp.116Smoke detector installationp.117Ceiling Panel Dropout System Setup and Operationp.120Maintenance steps for dropout ceiling systemp.120Troubleshooting diagramp.120Five-Year Factory Warrantyp.121Terms of warrantyp.121Non-transferable warrantyp.121Exclusionsp.121Warranty claimsp.122
Page 8 of the NetShelter Aisle Containment System user manual
8ページ · クリックして拡大
8ページ
Page 8 of the NetShelter Aisle Containment System user manual
Page 9 of the NetShelter Aisle Containment System user manual — Cross-reference symbol used in this manual
9ページ · クリックして拡大
9ページ

General Information

Important Safety Information

Read the instructions carefully to become familiar with the equipment before trying to install, operate, service, or maintain it. The following special messages may appear throughout this manual or on the equipment to warn of potential hazards or to call attention to information that clarifies or simplifies a procedure.

DANGER

WARNING

CAUTION

NOTICE

Documentation Information

All documentation is also available online at www.apc.com or www.se.com.

Cross-reference symbol used in this manual

See another section of this document or another document for more information on this subject.

Page 10 of the NetShelter Aisle Containment System user manual — Unpacking and Inspecting
10ページ · クリックして拡大
10ページ

Manual updates

Check for updates to this manual on the applicable product page of www.apc.com, or the Schneider Electric website. Go to www.se.com/support, select the Product Documentation and Software Downloads link under the Support tab and enter the manual part number or SKU for your equipment in the search field. See the back cover of this manual for the part number.

Unpacking and Inspecting

After opening a box, check the components in the box against the list of items in “Component Identification,”

beginning on page 4. If any components are missing contact APC by Schneider Electric at http://www.apc.com/support.

Pictures of assemblies are also shown on the packaging for reference.

The shipping materials are recyclable. Save them for later use or dispose of them appropriately.

Page 11 of the NetShelter Aisle Containment System user manual — 230 MM
11ページ · クリックして拡大
11ページ

Systems Overview

Basic configurations

NetShelter Aisle Containment System — Basic configurations diagram (page 11)
図 2 · Basic configurations

230 MM

220 MM

210 MM

200 MM

190 MM

9.0 IN

8.5 IN

8.0 IN

7.5 IN

230 MM

220 MM

210 MM

200 MM

190 MM

9.0 IN

8.5 IN

8.0 IN

7.5 IN

230 MM

220 MM

210 MM

200 MM

190 MM

9.0 IN

8.5 IN

8.0 IN

7.5 IN

230 MM

220 MM

210 MM

200 MM

190 MM

9.0 IN

8.5 IN

8.0 IN

7.5 IN

230 MM

220 MM

210 MM

200 MM

190 MM

9.0 IN

8.5 IN

8.0 IN

7.5 IN

230 MM

220 MM

210 MM

200 MM

190 MM

9.0 IN

8.5 IN

8.0 IN

7.5 IN

230 MM

220 MM

210 MM

200 MM

190 MM

9.0 IN

8.5 IN

8.0 IN

7.5 IN

230 MM

220 MM

210 MM

200 MM

190 MM

9.0 IN

8.5 IN

8.0 IN

7.5 IN

230 MM

220 MM

210 MM

200 MM

190 MM

9.0 IN

8.5 IN

8.0 IN

7.5 IN

230 MM

220 MM

210 MM

200 MM

190 MM

9.0 IN

8.5 IN

8.0 IN

7.5 IN

230 MM

220 MM

210 MM

200 MM

190 MM

9.0 IN

8.5 IN

8.0 IN

7.5 IN

230 MM

220 MM

210 MM

200 MM

190 MM

9.0 IN

8.5 IN

8.0 IN

7.5 IN

230 MM

9.0 IN

230 MM

220 MM

210 MM

200 MM

190 MM

9.0 IN

8.5 IN

8.0 IN

7.5 IN

220 MM

210 MM

200 MM

190 MM

8.5 IN

8.0 IN

7.5 IN

DUAL-AISLE CEILING

SINGLE-AISLE CEILING

VERTICALLY DUCTED

CONTAINMENT

CONTAINMENT

CONTAINMENT

The NetShelter™ Aisle Containment System provides a barrier between the hot exhaust and cold intake air streams in the IT environment. The separation of the hot and cold air streams in the environment increases the efficiency and effectiveness of the cooling system that supports the critical IT equipment. The separation will also allow for an elevated supply-air temperature to be provided by the cooling system since the mixing of hot and cold air is eliminated.

The NetShelter Aisle Containment System can be built using new or existing APC by Schneider Electric equipment. This containment system is compatible with row, room, or external cooling solutions and available for cold or hot aisle containment.

This manual is a guide for the basic installation procedures for creating a NetShelter Aisle Containment System. Refer to the documentation provided with each piece of equipment for specific installation and joining instructions.

Page 12 of the NetShelter Aisle Containment System user manual — Ceiling panel mounting rail system—ACDC2000–ACDC2002
12ページ · クリックして拡大
12ページ

Component Identification

Ceiling and Duct Components

Ceiling panel mounting rail system—ACDC2000–ACDC2002

NetShelter Aisle Containment System — Ceiling panel mounting rail system—ACDC2000–ACDC2002 diagram (page 12)
図 3 · Ceiling panel mounting rail system—ACDC2000–ACDC2002

M12 × M10 adapter stud (ACDC2000) M12 × M10 adapter stud (ACDC2001, ACDC2002)

M6 × 12 wing screw (ACDC2000) M6 × 12 wing screw (ACDC2001, ACDC2002)

M10 nut with washer (ACDC2000) M10 nut with washer (ACDC2001, ACDC2002)

M6 channel nut (ACDC2000) M6 channel nut (ACDC2001, ACDC2002)

M10 × 16 M6 socket screw (ACDC2000) M10 × 16 M6 socket screw (ACDC2001, ACDC2002)

M6 × 10 flathead T30 screw (ACDC2000) M6 × 10 flathead T30 screw (ACDC2001, ACDC2002)

M4 × 8 TORX® pan head screw 4

Slide-in connection frame, 180 mm (7.1 in.) 4

Left hand, standard mounting bracket (SX/InRow RC front) (ACDC2000) Left hand, standard mounting bracket (SX/InRow RC front) (ACDC2001, ACDC2002)

Right hand standard bracket (SX/InRow RC front) (ACDC2000) Right hand standard bracket (SX/InRow RC front) (ACDC2001, ACDC2002)

Gasket, 1800 mm (72 in.) (ACDC2000) 2

Ceiling support, 1800 mm (72 in.) (ACDC2000) 2

Gasket, 600 mm (24 in.) (ACDC2001) 2

Ceiling support, 600 mm (24 in.) (ACDC2001) 2

Gasket, 300 mm (12 in.) (ACDC2002) 2

Ceiling support, 300 mm (12 in.) (ACDC2002) 2

Key (ACDC2000), Key (ACDC2001, ACDC2002)

Item Description Quantity · Joining bracket 2

Page 13 of the NetShelter Aisle Containment System user manual — Ceiling panel mounting rail—ACDC2003
13ページ · クリックして拡大
13ページ

Ceiling panel mounting rail—ACDC2003

NetShelter Aisle Containment System — Ceiling panel mounting rail—ACDC2003 diagram (page 13)
図 4 · Ceiling panel mounting rail—ACDC2003

M12 × M10 adapter stud 2

M6 × 12 wing screw 2

M10 nut with washer 2

M6 channel nut 12

M10 × 16 M6 socket screw 2

M6 × 10 flathead T30 screw 2

M4 × 8 TORX pan head thread-forming screw 10

M6 × 10 pan head T30 screw 8

Left hand, standard mounting bracket (SX enclosure/InRow RC front) 1

Right hand, standard mounting bracket (SX enclosure/InRow RC front) 1

Gasket, 396 mm (15.6 in.) 1

Slide-in connection frame, 180 mm (7.1 in.) 4

Top cover plate 2

Aluminum extrusion,100 mm (3.9 in.) 2

Item Description Quantity · Bottom plate 2 · Lower plate 2

Page 14 of the NetShelter Aisle Containment System user manual — Ceiling panel wall mount—single row—ACDC2004
14ページ · クリックして拡大
14ページ

Ceiling panel wall mount—single row—ACDC2004

NetShelter Aisle Containment System — Ceiling panel wall mount—single row—ACDC2004 diagram (page 14)
図 5 · Ceiling panel wall mount—single row—ACDC2004

Outer small spring channel 1

Inner spring channel 1

Item Description Quantity

Page 15 of the NetShelter Aisle Containment System user manual — Ceiling panel rail mounting brackets (cooling/racks)—ACDC2005
15ページ · クリックして拡大
15ページ

Ceiling panel rail mounting brackets (cooling/racks)—ACDC2005

NetShelter Aisle Containment System — Ceiling panel rail mounting brackets (cooling/racks)—ACDC2005 diagram (page 15)
図 6 · Ceiling panel rail mounting brackets (cooling/racks)…

Airflow rack bracket, right hand 1

Airflow rack bracket, left hand 1

InRow RC/RD bracket, right hand rear 1

InRow RA bracket, left hand rear 1

Item Description Quantity

Page 16 of the NetShelter Aisle Containment System user manual — Ceiling panel rail mounting brackets (power)—ACDC2006
16ページ · クリックして拡大
16ページ

Ceiling panel rail mounting brackets (power)—ACDC2006

NetShelter Aisle Containment System — Ceiling panel rail mounting brackets (power)—ACDC2006 diagram (page 16)
図 7 · Ceiling panel rail mounting brackets (power)—ACDC200…

M4 × 12 TORX T20 countersink screw 8

M6 × 20 TORX T30 flathead machine screw 4

Left PDU/UPS bracket 1

Right PDU/UPS bracket 1

Left PDPM/PDU bracket 1

Right PDPM/PDU bracket 1

Left VX front mounting bracket 1

Right VX front mounting bracket 1

Rear VX rear mounting bracket 2

Item Description Quantity

Page 17 of the NetShelter Aisle Containment System user manual — Ceiling panel lock system without power supply—ACDC2015
17ページ · クリックして拡大
17ページ

Ceiling panel lock system without power supply—ACDC2015

NetShelter Aisle Containment System — Ceiling panel lock system without power supply—ACDC2015 diagram (page 17)
図 8 · Ceiling panel lock system without power supply—ACDC2…

M5 × 8 mm flathead T15 screw 8

M4 × 8 pan head T20 screw 24

M5 × 10 mm flathead T15 screw 4

M4 serrated hex flange nut 8

135°F (57°C) temperature switch 24 VDC 3 A 4

Electromechanical lock spacer 4

Electromechanical lock assembly, 24 V 50 MA* 4

Box-to-box wire assembly 4

  • ACDC2000 contains two1800 mm supports. Use two electromechanical locks per 1800 mm section.
  • ACDC2001 contains two 600 mm supports. Use one electromechanical lock per 600 mm section.
  • ACDC2002 contains two 300 mm supports. Use one electromechanical lock per 300 mm section.
  • ACDC2003 contains two 100 mm supports. Do not use any electromechanical locks.

Item Description Quantity · Wiring box 4

Page 18 of the NetShelter Aisle Containment System user manual — Aisle containment lighting kit—ACDC2018, ACDC2019
18ページ · クリックして拡大
18ページ

Ceiling panel lock system with power supply—ACDC2016, ACDC2017

NetShelter Aisle Containment System — Ceiling panel lock system with power supply—ACDC2016, ACDC2017 diagram (page 18)
図 9 · Ceiling panel lock system with power supply—ACDC2016…

Dropout power supply control box, 110 V (ACDC2016) 1 Dropout power supply control box, 220 V (ACDC2017) 1

Bracket for power supply box 2

M6 × 16 pan head Phillips screw 4

M6 × 12 pan head T30 screw 4

M4 × 8 mm button head T15 screw 6

M6 plastic cup washer 4

M6 channel nut 4

M6 caged nut 4

Wire harness—power supply to wiring box, 3.6 m (12 ft.) 1

Across aisle wiring assembly, 4 m (13.1 ft.) 2

Wiring box cover 1

Power cord—CEE22 jump 2M 10A ROHS (ACDC2017) 2

Power cord—1.8 m (6 ft.) C13/15 DELL ROHS compliant (ACDC2016) 2

Smoke detector cable 1

Aisle containment lighting kit—ACDC2018, ACDC2019

ACDC2018 - Lighting kit with power supply ACDC2019 - Lighting kit without power supply

See documentation included with the components for parts lists.

Show 7 more labels / short text on this page
na4051a · Item Description Quantity · Alarm beacon 2 · Terminal jumper 1 · 4-pin jumper 1 · Wire tie 55 · Cable holder 55
Page 19 of the NetShelter Aisle Containment System user manual — Ceiling panel—ACDC2100 – ACDC2107
19ページ · クリックして拡大
19ページ

Duct lighting mounting support without lights—ACDC2302

NetShelter Aisle Containment System — Duct lighting mounting support without lights—ACDC2302 diagram (page 19)
図 10 · Duct lighting mounting support without lights—ACDC23…

M6 × 10 flathead T30 screw 6

M4 × 12 pan head T20 thread-forming screw 10

M6 × 3 mm air block rail spacer 6

M6 channel nut 6

Aluminum wire cover extrusion, 300 mm (12 in.) 5

Light mounting rail,1072 mm (42 in.) 2

Ceiling panel—ACDC2100 – ACDC2107

Ribbed ceiling panel, 900 mm (36 in.) (ACDC2100) Solid ceiling panel, 900 mm (36 in.) (ACDC2101) Ribbed ceiling panel, 1200 mm (48 in.) (ACDC2102) Solid ceiling panel, 1200 mm (48 in.) (ACDC2103) Ribbed ceiling panel, 1500 mm (60 in.) (ACDC2104) Solid ceiling panel, 1500 mm (60 in.) (ACDC2105) Ribbed ceiling panel, 1800 mm (72 in.) (ACDC2106) Solid ceiling panel, 1800 mm (72 in.) (ACDC2107)

Spare ceiling frame corner connector (All kits) 2

Item Description Quantity · Item Description Quantity

Page 20 of the NetShelter Aisle Containment System user manual — Adjustable mounting kits components—ACDC2200–ACDSC2203
20ページ · クリックして拡大
20ページ

Adjustable mounting kits components—ACDC2200–ACDSC2203

NetShelter Aisle Containment System — Adjustable mounting kits components—ACDC2200–ACDSC2203 diagram (page 20)
図 11 · Adjustable mounting kits components—ACDC2200–ACDSC22…

M10 × 16 M6 socket screw 6

M6 × 10 flathead T30 screw 8

M6 channel nut 8

M4 × 32 flathead T20 thread-forming screw 8

M10 nut with washer 2

M12 × M10 adapter stud 2

Rack mounting kit, 6 – 9.5 in. (152 – 241 mm) (ACDC2200, ACDC2201) Rack mounting kit, 9.5 – 16.5 in. (241 – 419 mm) (ACDC2202, ACDC2203)

Standard mounting kit bracket 4

Air block panel support 2

Lexan® panel, 1200 × 246 mm (48 × 9.7 in.) (ACDC2200) Solid panel V0, 1200 × 252 mm (48 × 10 in.) (ACDC2201) Lexan panel,1200 × 424 mm (48 × 16.6 in.) (ACDC2202) Solid panel V0, 1200 × 430 mm (48 × 16.9 in.) (ACDC2203)

2

Item Description Quantity

Page 21 of the NetShelter Aisle Containment System user manual — Mounting brackets, adjustable mounting support (cooling/racks)—ACDC2204
21ページ · クリックして拡大
21ページ

Mounting brackets, adjustable mounting support (cooling/racks)—ACDC2204

NetShelter Aisle Containment System — Mounting brackets, adjustable mounting support (cooling/racks)—ACDC2204 diagram (page 21)
図 12 · Mounting brackets, adjustable mounting support (cool…

M12 to M10 adapter stud 2

M6 × 12 pan head T30 screw 1

M4 flanged serrated hex nut 1

M10 nut with washer 2

RA rear bracket, rack mount kit, 300 mm 1

RC rear bracket, rack mount kit, 300 mm 1

Airflow rack bracket, left 1

Airflow rack bracket, right 1

Item Description Quantity

Page 22 of the NetShelter Aisle Containment System user manual — Mounting brackets, adjustable mounting support (power)—ACDC2205
22ページ · クリックして拡大
22ページ

Mounting brackets, adjustable mounting support (power)—ACDC2205

NetShelter Aisle Containment System — Mounting brackets, adjustable mounting support (power)—ACDC2205 diagram (page 22)
図 13 · Mounting brackets, adjustable mounting support (powe…

M12 to M10 adapter stud 2

M6 × 12 flathead T30 screw 2

M4 × 12 TORX countersink screw 4

M10 nut with washer 2

M4 flanged serrated hex nut 4

M6-1 × 20 TORX flathead machine screw 2

MPDU bracket, rack mount kit 2

SPDU bracket, rack mount kit, left 1

SPDU bracket, rack mount kit, right 1

Offset bracket, left 1

Offset bracket, right 1

VX bracket rack mount, left front 1

VX bracket rack mount, right front 1

VX bracket rack mount, rear 2

Item Description Quantity

Page 23 of the NetShelter Aisle Containment System user manual — Duct mounting rail—ACDC2300
23ページ · クリックして拡大
23ページ

Duct mounting rail—ACDC2300

NetShelter Aisle Containment System — Duct mounting rail—ACDC2300 diagram (page 23)
図 14 · Duct mounting rail—ACDC2300

M6 × 10 flathead T30 screw 64

M10 × 16 M6 socket screw 4

M6 × 12 pan head T30 screw 12

M6 channel nut 76

M6 × 3 mm bracket for air block rail 24

Duct system angle connector 6

Duct corner bracket 4

End aisle corner bracket, left 2

End aisle corner bracket, right 2

Gasket, 2.5 m (98.4 in.) 1

Horizontal panel mounting bracket 4

Air block mounting rail, 1072 mm (42.2 in.) 8

Cross-aisle support duct rail with 180 mm (7.1 in.) connectors, 610 mm (24 in.) 6

Cross-aisle support duct rail with 180 mm (7.1 in.) connector, 305 mm (12 in.) 6

Top of duct cross-aisle rail with angle connectors, 1012 mm (39.8 in.) 4

Base support duct rail with180 mm (7.1 in.) connectors, 1072 mm (42 in.) 10

Item Description Quantity · Wire cover 8

Page 24 of the NetShelter Aisle Containment System user manual — Duct panel—ACDC2303 – ACDC2310
24ページ · クリックして拡大
24ページ

Duct mounting rail expansion—ACDC2301 (used with ACDC2300)

NetShelter Aisle Containment System — Duct mounting rail expansion—ACDC2301 (used with ACDC2300) diagram (page 24)
図 15 · Duct mounting rail expansion—ACDC2301 (used with ACD…

M6 × 10 flathead T30 screw 16

M6 channel nut 16

M6 × 3 mm bracket for air block rail 6

Air block mounting rail, 1072 mm (42.2 in.) 2

Top of duct rail with 180 mm (7.1 in.) connector, 610 mm (24 in.) 1

Top of duct rail with 180 mm (7.1 in) connector, 305 mm (12 in.) 1

Top of duct cross-aisle rail with angle connector, 1012 mm (39.8 in.) 1

Base duct rail with 180 mm (7.1 in.) connector, 1072 mm (42.2 in.) 2

Duct panel—ACDC2303 – ACDC2310

Ribbed duct panel, 1072 mm width × up to 787 mm height (42 × 31 in.) (ACDC2303) Solid duct panel, 1072 mm width × up to 787 mm height (42 × 31 in.) (ACDC2304) Ribbed duct panel, 1072 mm width × up to 1041 mm height (42 × 41 in.) (ACDC2305) Solid duct panel, 1072 mm width × up to 1041 mm height (42 × 41 in.) (ACDC2306) Ribbed duct panel, 1072 mm width × up to 1270 mm height (42 × 50 in.) (ACDC2307) Solid duct panel, 1072 mm width × up to 1270 mm height (42 × 50 in.) (ACDC2308) Ribbed duct panel, 1072 mm width × up to 1524 mm height (42 × 60 in.) (ACDC2309) Solid duct panel, 1072 mm width × up to 1524 mm height (42 × 60 in.) (ACDC2310)

Duct frame gasket (Attached to panel)

Show 4 more labels / short text on this page
Item Description Quantity · Wire cover 2 · Item Description Quantity · 1 each
Page 25 of the NetShelter Aisle Containment System user manual — Duct panel frame extension, 1200–1800 mm (48–72 in.)—ACDC2311
25ページ · クリックして拡大
25ページ

Duct panel frame extension, 1200–1800 mm (48–72 in.)—ACDC2311

NetShelter Aisle Containment System — Duct panel frame extension, 1200–1800 mm (48–72 in.)—ACDC2311 diagram (page 25)
図 16 · Duct panel frame extension, 1200–1800 mm (48–72 in.)…

Duct rail with 180 mm (7.1 in.) connectors, 152.5 mm (6 in.) 8

Duct rail with 180 mm (7.1 in.) connectors, 628.5 mm (24.7 in.) 4

Item Description Quantity

Page 26 of the NetShelter Aisle Containment System user manual — Aisle containment door—ACDC2400
26ページ · クリックして拡大
26ページ

Door system components

Aisle containment door—ACDC2400

NetShelter Aisle Containment System — Aisle containment door—ACDC2400 diagram (page 26)
図 17 · Aisle containment door—ACDC2400
NetShelter Aisle Containment System — Aisle containment door—ACDC2400 diagram (page 26)
図 18 · Aisle containment door—ACDC2400

M5 × 12 Phillips screw 6

M6 × 12 pan head T30 screw 4

M6 serrated flange hex nut 12

Standard lower guide rail mounting bracket 2

Guide rail spacer tape 4

4-way cable tie adhesive mount 10

Lower guide rail, right 1

Lower guide rail, left 1

Hinge post, left 1

Hinge post, right 1

Lower guide rail mounting bracket for VX, left 1

Lower guide rail mounting bracket for VX, right 1

Lower guide rail mounting brackets, 600 mm Cooling 2

M8 × 12 screw, T30 black 2

Show 6 more labels / short text on this page
na4195a · Item Description Quantity · Cable tie 10 · Threshold 1 · Door, left 1 · Door, right 1
Page 27 of the NetShelter Aisle Containment System user manual — ACDC2402
27ページ · クリックして拡大
27ページ

Door header—ACDC2401, ACDC2402, ACDC2403

ACDC2401

NetShelter Aisle Containment System — Door header—ACDC2401, ACDC2402, ACDC2403 diagram (page 27)
図 19 · Door header—ACDC2401, ACDC2402, ACDC2403

ACDC2402

NetShelter Aisle Containment System — ACDC2402 diagram (page 27)
図 20

Inner header cover 1

Outer header cover 1

M4 × 6 mm TORX screw (ACDC2402, ACDC2403) M4 × 6 mm TORX screw (ACDC2401)

M8 × 12 T30 screw 8

M6 × 12 pan head T30 screw 6

M6 channel nut 6

Header adapter bracket 2

Header adapter bracket for 42 U (ACDC2401) 2

Show 6 more labels / short text on this page
na4197a · Item Description Quantity · Door header 1 · Blanking panel 1 · Universal bushing 1 · Foam seal 2
Page 28 of the NetShelter Aisle Containment System user manual — Door post, 900–1200 mm (36–48 in.) aisle width—ACDC2404
28ページ · クリックして拡大
28ページ

Door post, 900–1200 mm (36–48 in.) aisle width—ACDC2404

NetShelter Aisle Containment System — Door post, 900–1200 mm (36–48 in.) aisle width—ACDC2404 diagram (page 28)
図 21 · Door post, 900–1200 mm (36–48 in.) aisle width—ACDC2…

Left door post 1

Right door post 1

M5 × 12 screw, Phillips 12

M6 serrated flange hex nut 28

M8 × 12 T30 screw 6

M6 × 12 screw, Phillips 44

Left door post extension, 3 U 2

Right door post extension, 3 U 2

Bracket, VX front bottom frame. Use with VX racks with and . 2

Bracket, VX rear bottom frame, 55 mm. Use with VX with and . 2

Joining bracket, SX enclosure 4

Joining bracket, 42 U VX enclosure 4

Joining bracket, VX front bottom frame. Use with VX racks with and . 2

Joining bracket, VX rear/SX bottom frame, 55 mm Use with VX racks from rear of the rack with and . Use with SX racks from front or rear of the rack.

6 mm spacer, VX 2

M8 × 16 hex screw 4

Item Description Quantity

Page 29 of the NetShelter Aisle Containment System user manual — Door post, 1200–1500 mm (48–60 in.) aisle width—ACDC2405
29ページ · クリックして拡大
29ページ

Door post, 1200–1500 mm (48–60 in.) aisle width—ACDC2405

NetShelter Aisle Containment System — Door post, 1200–1500 mm (48–60 in.) aisle width—ACDC2405 diagram (page 29)
図 22 · Door post, 1200–1500 mm (48–60 in.) aisle width—ACDC…

Left door post 1

Right door post 1

M5 × 12 screw, Phillips 12

M6 serrated flange hex nut 28

M8 × 12 T30 screw 6

M6 × 12 screw, Phillips 44

Left door post extension, 3 U 2

Right door post extension, 3 U 2

Bracket, VX front bottom frame 2

Bracket, VX rear bottom frame, 55 mm 2

Joining bracket, SX enclosure 4

Joining bracket, 42 U VX enclosure 4

Joining bracket, VX and SX bottom frame (preset to SX) 2

6 mm spacer, VX 2

M8 × 16 hex screw 4

na4200a · Item Description Quantity

Page 30 of the NetShelter Aisle Containment System user manual — Door post, 1500–1800 mm (60–72 in.) aisle width—ACDC2406
30ページ · クリックして拡大
30ページ

Door post, 1500–1800 mm (60–72 in.) aisle width—ACDC2406

NetShelter Aisle Containment System — Door post, 1500–1800 mm (60–72 in.) aisle width—ACDC2406 diagram (page 30)
図 23 · Door post, 1500–1800 mm (60–72 in.) aisle width—ACDC…

Left door post 1

Right door post 1

M5 × 12 screw, Phillips 12

M6 serrated flange hex nut 28

M8 × 12 screw 6

M6 × 12 screw, Phillips 44

Left door post extension, 3 U 2

Right door post extension, 3 U 2

Bracket, VX front bottom frame 2

Bracket, VX rear bottom frame, 55 mm 2

Joining bracket, SX enclosure 4

Joining bracket, 42 U VX enclosure 4

6 mm spacer, VX 2

Joining kit, VX and SX bottom frame (preset to SX) 2

M8 × 16 hex Screw 4

na4201a · Item Description Quantity

Page 31 of the NetShelter Aisle Containment System user manual — Door handle lock—ACDC2408
31ページ · クリックして拡大
31ページ

Door handle lock—ACDC2408

NetShelter Aisle Containment System — Door handle lock—ACDC2408 diagram (page 31)
図 24 · Door handle lock—ACDC2408

Right-hand door handle with mechanical lock 1

M4 × 12.5 screw 4

Show 5 more labels / short text on this page
na4193a · Item Description Quantity · Hole plug 8 · M4 washer 4 · Key 3
Page 32 of the NetShelter Aisle Containment System user manual — Curtain door mounting rail—ACDC2410, ACDC2411
32ページ · クリックして拡大
32ページ

Curtain door mounting rail—ACDC2410, ACDC2411

NetShelter Aisle Containment System — Curtain door mounting rail—ACDC2410, ACDC2411 diagram (page 32)
図 25 · Curtain door mounting rail—ACDC2410, ACDC2411

M6 × 12 pan-head T30 screws 4

M6 × 10 screw, flathead T30 9

M6 channel nut 9

M6 hex flange nut 2

M4 × 8 pan-head T20 screws 20

Curtain door fixture 2

Curtain hanger clips (ACDC2410) Curtain hanger clips (ACDC2411)

Cable tie adhesive mount 10

Curtain door cover, left 1

Curtain door cover, right 1

Duct system rail, 305 mm (12 in.) with connector 1

Duct system rail, 1072 mm (42 in.) (ACDC2410) 1

Duct system rail, 1524 mm (5 ft.) (ACDC2411) 1

Curtain door rail, 914 mm (3 ft.) (ACDC2410) 1

Curtain door rail, 305 mm (1 ft.) 1

Curtain door rail, 1524 mm (5 ft.) (ACDC2411) 1

Curtain door cover (ACDC2410) 1

Curtain door cover, long (ACDC2411) 1

Item Description Quantity · Wire tie 10

Page 33 of the NetShelter Aisle Containment System user manual — Curtain door strip—ACAC11008, ACAC11009
33ページ · クリックして拡大
33ページ

Curtain door strip—ACAC11008, ACAC11009

Curtain strip - 42 U, (190 mm × 2228 mm) (7.5 × 88 in.) (ACAC11008) Curtain strip - 48 U, (190 mm × 2495 mm) (7.5 × 98 in.) (ACAC11009)

Item Description Quantity

Page 34 of the NetShelter Aisle Containment System user manual — Blanking panel
34ページ · クリックして拡大
34ページ

Height/Depth Adapters and Blanking Panels

See documentation included with these components for more information.

Height adapter kits components

Roof height adapter—ACDC2500 – ACDC2518

Depth adapters

Depth adapter 1070–1200 mm (42–48 in.)

  • SX 42 U, 300 mm wide (12 in.)—ACDC2550
  • SX 42 U–SX 48 U, 600–750 mm width (24–30 in.)—ACDC2551

Depth adapter, 900–1200 mm (36–48 in.), VX 42 U

  • 600 mm wide (24 in.)—ACDC2552
  • 750 mm wide (30 in.)—ACDC2553

Blanking panel

Blanking panel, 42–48 U SX / 42 U VX

  • 300 mm wide (12 in.)—ACDC2575
  • 600 mm wide (24 in.)—ACDC2576
  • 700 mm wide (28 in.)—ACDC2577
  • 750 mm wide (30 in.)—ACDC2578
Page 35 of the NetShelter Aisle Containment System user manual — General guidelines for installation
35ページ · クリックして拡大
35ページ

Planning the Installation

The NetShelter Aisle Containment System can be installed around units that are already installed in a building, or can be assembled from new units.

If you are installing the NetShelter Aisle Containment System around pieces of equipment that are already installed, consider using the PDU, UPS, or InRow unit as a starting point. If you have to move a PDU, a UPS, or an InRow unit, you must first disconnect the power to the unit.

See the System Installation Manual, available on the APC by Schneider Electric website, for proper system shut down procedures.

General guidelines for installation

A NetShelter Aisle Containment System can be assembled from many different types of equipment, but these

guidelines must be followed to ensure that it is assembled correctly:

  • Join enclosures on 600 mm centers.
  • If installing on a raised floor, plan the installation of the cooling unit to allow one of the floor tiles to be completely unobstructed to allow under-floor access to pipes and valves.

See the documentation provided with each APC by Schneider Electric unit for additional instructions on installation. All documentation is also available on the APC by Schneider Electric website, www.apc.com.

Page 36 of the NetShelter Aisle Containment System user manual — Dual-row ceiling containment
36ページ · クリックして拡大
36ページ

Installation Procedure Overview

Dual-row ceiling containment

NetShelter Aisle Containment System — Dual-row ceiling containment diagram (page 36)
図 26 · Dual-row ceiling containment
NetShelter Aisle Containment System — Dual-row ceiling containment diagram (page 36)
図 27 · Dual-row ceiling containment

Layout the position of the main components using the ISX Designer printout as a dimensional reference. Each

enclosure must line up exactly with the enclosure directly across the aisle.

Assemble the first row of units. Position and join the main components working either from one end to the other,

or starting from an InRow cooling unit, PDU, or UPS and work your way out to both ends.

Assemble the second row of units. Position and join the main components working either from one end to the

other, or starting from an InRow cooling unit, PDU, or UPS and work your way out to both ends.

Finalize alignment of the racks and rack equipment. Make sure all of the panels line up on the top. Level the

racks and equipment by deploying the leveling feet.

Install height adapters, depth adapters, and blanking panels as necessary.

Install the rail mounting brackets.

Install the ceiling panel mounting rails.

Install the ceiling panel frames.

Install the sliding door/curtain door on the ends of the aisle.

Page 37 of the NetShelter Aisle Containment System user manual — Dual-row ducted
37ページ · クリックして拡大
37ページ

Dual-row ducted

NetShelter Aisle Containment System — Dual-row ducted diagram (page 37)
図 28 · Dual-row ducted
NetShelter Aisle Containment System — Dual-row ducted diagram (page 37)
図 29 · Dual-row ducted

Layout the position of the main components using the ISX Designer printout as a dimensional reference. Each

enclosure must line up exactly with the enclosure directly across the aisle.

Assemble the first row of units. Position and join the main components working either from one end to the other,

or starting from an InRow cooling unit, PDU, or UPS and work your way out to both ends.

Assemble the second row of units. Position and join the main components working either from one end to the

other, or starting from an InRow cooling unit, PDU, or UPS and work your way out to both ends.

Finalize alignment of the racks and rack equipment. Make sure all of the panels line up on the top. Level the

racks and equipment by deploying the leveling feet.

Install height adapters, depth adapters, and blanking panels as necessary.

Install the duct panel mounting brackets.

Install the duct panel mounting rails.

Install the duct panels, power troughs, and data partitions.

Install the sliding door/curtain door on the ends of the aisle.

na4122a

Page 38 of the NetShelter Aisle Containment System user manual — HOT AISLE
38ページ · クリックして拡大
38ページ

Critical Dimensions

Using the critical dimensions table

1. First, you need to determine the rack combination to use as a guide for all other aisle measurements. The deepest rack combination will be the guide for measurements in the aisle. Start on the left side of the image with ‘A’ and move to the right until you come to a unit combination that matches a unit combination in your row. For example, if your deepest unit combination is a 1200 mm unit and a 1070-mm unit, you will use measure ‘B’ as your guide and row ‘B’ for your measurements in the table.

HOT AISLE

A B C D E F

MEASURE FROM FRAME TO FRAME

2. Select your “Nominal Aisle Width” and “Guide Measurement” to find your measurement to use for each unit combination in the row. For example, for a 4-foot aisle where our guide measurement is derived from unit combination ‘B’, and our unit combination that we need a measurement for is ‘D’ (a 1200 mm unit and a 900 mm unit), your measurement would be 1466 mm (57.75 in.).
NetShelter Aisle Containment System — HOT AISLE diagram (page 38)
図 30
Show 5 more labels / short text on this page
1070 1200 · 900 900 · Unit Combination · Nominal Aisle Width · Guide Measurement
Page 39 of the NetShelter Aisle Containment System user manual — E -- -- -- -- 1905 (75.00) --
39ページ · クリックして拡大
39ページ

Hot aisle containment dimensions

A B C D E F

MEASURE FROM FRAME TO FRAME

DIMENSIONS SHOWN IN MILLIMETERS

A B C D E F

A 991 (39.00) 991 (39.00) 991 (39.00) 1291 (50.83) 1291 (50.83) 1591 (50.83)

B -- 991 (39.00) 991 (39.00) 1161 (45.71) 1161 (45.71) 1461 (45.71)

3 ft. (900 mm)

C -- -- 991 (39.00) 1161 (45.71) 1161 (45.71) 1331 (52.40)

Hot Aisle - Middle or End of Aisle, Frame to Frame, With Depth Extenders

D --

E -- -- -- -- -- --

F -- -- -- -- --

A 1296 (51.02) 1296 (51.02) 1296 (51.02) 1596 (62.83) 1596 (62.83) 1896 (74.65)

B -- 1296 (51.02) 1296 (51.02) 1466 (57.75) 1466 (57.75) 1766 (69.53)

4 ft. (1200 mm)

C -- -- 1296 (51.02) 1466 (57.75) 1466 (57.75) 1636 (64.41)

D -- -- -- 1296 (51.02) 1296 (51.02) 1596 (62.84)

E -- 1296 (51.02) 1466 (57.75)

F -- 1296 (51.02)

A 1600 (63.00) 1600 (63.00) 1600 (63.00) 1900 (74.80) -- --

B -- 1600 (63.00) 1600 (63.00) 1770 (69.69) 1770 (69.69) --

5 ft. (1500 mm)

C -- -- 1600 (63.00) 1770 (69.69) 1770 (69.69) --

D -- -- -- 1600 (63.00) 1600 (63.00) 1900 (74.80)

E -- 1600 (63.00) 1770 (69.69)

F -- 1600 (63.00)

A 1905 (75.00) 1905 (75.00) 1905 (75.00) -- -- --

B -- 1905 (75.00) 1905 (75.00) -- -- --

6 ft. (1800 mm)

C -- -- 1905 (75.00) -- -- --

D -- -- -- 1905 (75.00) 1905 (75.00) --

E -- 1905 (75.00) --

F -- -- -- -- -- 1905 (75.00)

* All dimensions shown in millimeters (inches).

Show 5 more labels / short text on this page
1070 1200 · 900 900 · Unit Combination* · Nominal Aisle Width · Guide Measurement
Page 40 of the NetShelter Aisle Containment System user manual — A B C D E F
40ページ · クリックして拡大
40ページ

Cold aisle containment dimensions

NetShelter Aisle Containment System — Cold aisle containment dimensions diagram (page 40)
図 31 · Cold aisle containment dimensions

A B C D E F

DIMENSIONS SHOWN IN MILLIMETERS

Unit Combination* A B C D E F

A 991 (39) 1121 (44.13) 1251 (49.25) -- 1121 (44.13) -- B -- 991 (39.00) 1121 (44.13) -- 1121 (44.13) -- C -- -- 991 (39.00) -- -- -- D -- E -- F --

3 ft (900 mm)

Cold Aisle - Middle of Aisle, Frame to Frame, With Depth Extenders

A 1296 (51.02) 1426 (56.14) 1556 (61.26) 1296 (51.02) 1426 (56.14) 1296 (51.02) B -- 1296 (51.02) 1426 (56.14) 1296 (51.02) 1426 (56.14) 1296 (51.02) C -- -- 1296 (51.02) 1166 (45.91) 1296 (51.02) 1296 (51.02) D -- -- -- 1296 (51.02) 1426 (56.14) 1296 (51.02) E -- 1296 (51.02) 1296 (51.02) F -- 1296 (51.02)

4 ft (1200 mm)

A 1600 (63.00) 1730 (68.11) 1860 (73.23) 1600 (63.00) 1730 (68.11) 1600 (63.00) B -- 1600 (63.00) 1730 (68.11) 1600 (63.00) 1730 (68.11) 1600 (63.00) C -- -- 1600 (63.00) 1470 (57.88) 1600 (63.00) 1600 (63.00) D -- -- -- 1600 (63.00) 1730 (68.11) 1600 (63.00) E -- 1600 (63.00) 1600 (63.00) F -- 1600 (63.00)

5 ft (1500 mm)

A 1905 (75.00) 2035 (80.12) 2165 (85.24) 1905 (75.00) -- 1905 (75.00) B -- 1905 (75.00) 2035 (80.18) 1905 (75.00) -- 1905 (75.00) C -- -- 1905 (75.00) 1775 (69.88) 1905 (75.00) 1905 (75.00) D -- -- -- 1905 (75.00) -- 1905 (75.00) E -- 1905 (75.00) 1905 (75.00) F -- 1905 (75.00)

6 ft (1800 mm)

Aisle, Frame to Frame,

3 ft (900 mm) 991 (39.00) 991 (39.00) 991 (39.00) -- -- --

Cold Aisle - End of

4 ft (1200 mm) 1296 (51.02) 1296 (51.02) 1296 (51.02) 1296 (51.02) 1296 (51.02) 1296 (51.02)

5 ft (1500 mm) 1600 (63.00) 1600 (63.00) 1600 (63.00) 1600 (63.00) 1600 (63.00) 1600 (63.00)

6 ft (1800 mm) 1905 (75.00) 1905 (75.00) 1905 (75.00) 1905 (75.00) 1905 (75.00) 1905 (75.00)

* All dimensions shown in millimeters (inches).

Show 5 more labels / short text on this page
1070 1200 · 900 900 · Nominal Aisle Width · Guide Measurement · No Depth Extenders
Page 41 of the NetShelter Aisle Containment System user manual — TORX
41ページ · クリックして拡大
41ページ

List of Recommended Tools

Wrench 6 mm, 7 mm, 8 mm, 13 mm, 14 mm

Screwdriver T-30, T-20, T-15

Hex wrench 3 mm, 6 mm

TORX

Hex socket 6.3 mm, 7 mm, 10 mm, 15 mm Level

Drill with standard, Phillips,

Tape measure Chalk line

NetShelter Aisle Containment System — TORX diagram (page 41)
図 32

T-square 120 cm (48 in.) minimum

Rotary tool (e.g. Dremel®)

Self-retracting knife Miter saw Metal files

Show 5 more labels / short text on this page
Screwdriver · Standard screwdriver · P2 Phillips · and TORX bits · T-square Scissors
Page 42 of the NetShelter Aisle Containment System user manual — How to work with the channel nuts
42ページ · クリックして拡大
42ページ

Fastener Information

How to work with the channel nuts

NetShelter Aisle Containment System — How to work with the channel nuts diagram (page 42)
図 33 · How to work with the channel nuts
Page 43 of the NetShelter Aisle Containment System user manual — HEAVY EQUIPMENT HAZARD
43ページ · クリックして拡大
43ページ

Before You Begin

Safety

WARNING

SHARP EDGE HAZARD

  • Be sure to read and follow the instructions that come with your power tools.
  • Wear protective clothing and eye wear.

Failure to follow these instructions can result in death, serious injury, or

equipment damage.

CAUTION

FALLING HAZARD

  • The working height for assembly can exceed 2.3 meters (7.5 feet). The use of stepladders or staging may be required to perform the assembly in a safe manner. Do not step on the top of any rack enclosure while assembling the enclosure.
  • Ceiling panels are not designed to support weight. Do not lean or walk on the ceiling panels. DO NOT use ceiling panels to support power or data cables.

Failure to follow these instructions can result in serious injury or equipment damage.

CAUTION

HEAVY EQUIPMENT HAZARD

More than one person is required to install this enclosure. Some parts may be heavy or excessive in size. For items weighing more than 25 lbs (12 kg), use more than one person.

Failure to follow these instructions can result in serious injury or equipment damage.

Page 44 of the NetShelter Aisle Containment System user manual — A
44ページ · クリックして拡大
44ページ

Main Components

Enclosures and Power Equipment

Refer to the instructions that come with your enclosures and power equipment for information on how to install them.

Layout and Positioning

Referencing the ISX Designer report, determine the position of the main components, the total length of the planned Aisle Containment System and the aisle width. Using a chalk line or similar, lay out the perimeter making sure all corners are square.

A

B

* Dimensions A and B will vary depending on the type and number of racks installed and the chosen width of the aisle.

90°

Page 45 of the NetShelter Aisle Containment System user manual — HIGHEST POINT
45ページ · クリックして拡大
45ページ

Adjust enclosures taking into consideration floor slope. The tops of the enclosures should be aligned.

HIGHEST POINT

FLOOR SLOPE

na4027a

Page 46 of the NetShelter Aisle Containment System user manual — Height Adapter and Depth Extender
46ページ · クリックして拡大
46ページ

Height Adapter and Depth Extender

See the manuals provided with each of these kits for instructions on how to install them.

Page 47 of the NetShelter Aisle Containment System user manual — Ceiling and Duct System Support Brackets
47ページ · クリックして拡大
47ページ

Ceiling and Duct System Support Brackets

Support Bracket Types Overview

SKU Quantity Image Description

NetShelter Aisle Containment System — Ceiling and Duct System Support Brackets diagram (page 47)
図 34 · Ceiling and Duct System Support Brackets

× 3, × 3 × 2, × 2 × 2, × 2 × 1, × 1

PDU, left PDPM and SYCFX, right PDPM, left PDPM, right VX front, left VX front, right VX rear

× 1 × 1 × 1 × 1 × 1 × 1 × 2

PDU, left PDU, right PDPM PDU - duct system, left PDU - duct system, right VX, rear VX front, right VX front, left

× 1 × 1 × 2 × 1 × 1 × 2 × 1 × 1

Horizontal panel - duct system Duct system, left Duct system, right

Page 48 of the NetShelter Aisle Containment System user manual — DOOR
48ページ · クリックして拡大
48ページ

Support Bracket Installation

Install the ceiling or duct support brackets on the side of the enclosure closest to the planned contained aisle. Refer to the following instructions showing how to install each bracket type.

Typical bracket placement—side view (duct system shown)

PLANNED

DUCT SYSTEM

NetShelter Aisle Containment System — Typical bracket placement—side view (duct system shown) diagram (page 48)
図 35 · Typical bracket placement—side view (duct system sho…

END AISLE

DOOR

Typical bracket placement—top view (duct system shown)

NetShelter Aisle Containment System — END AISLE diagram (page 48)
図 36

DOOR

SX enclosures and InRow RC, front

ACDC2000, ACDC2001, ACDC2002, ACDC2003

TOP VIEW LEFT-HAND BRACKET

TOP VIEW RIGHT-HAND BRACKET

NetShelter Aisle Containment System — DOOR diagram (page 48)
図 37
Page 49 of the NetShelter Aisle Containment System user manual — M10 × 16
49ページ · クリックして拡大
49ページ

InRow RC/RD/RA rear and Airflow racks

ACDC2005

TOP VIEW LEFT-HAND

TOP VIEW RIGHT-HAND

BRACKET

BRACKET

NetShelter Aisle Containment System — InRow RC/RD/RA rear and Airflow racks diagram (page 49)
図 38 · InRow RC/RD/RA rear and Airflow racks

M10 × 16

RIGHT-HAND BRACKET

RC/RD/RA ENCLOSURE

NetShelter Aisle Containment System — M10 × 16 diagram (page 49)
図 39
Page 50 of the NetShelter Aisle Containment System user manual — LEFT SIDE
50ページ · クリックして拡大
50ページ

PDU, PDPM, VX enclosure

NetShelter Aisle Containment System — PDU, PDPM, VX enclosure diagram (page 50)
図 40 · PDU, PDPM, VX enclosure

LEFT SIDE

BRACKET

FROM ACDC2000–ACDC2003 M4 × 12

ACDC2006—VX enclosure, front

Page 51 of the NetShelter Aisle Containment System user manual — BRACKET
51ページ · クリックして拡大
51ページ
NetShelter Aisle Containment System — PDU, PDPM, VX enclosure diagram (page 51)
図 41 · PDU, PDPM, VX enclosure

REAR DOOR

LEFT SIDE

BRACKET

NetShelter Aisle Containment System — REAR DOOR diagram (page 51)
図 42

FROM ACDC2000-

M4 × 12

ACDC2003

PDU/PDPM

NetShelter Aisle Containment System — FROM ACDC2000- diagram (page 51)
図 43

BRACKET

BRACKET

VX enclosure, rear

Page 52 of the NetShelter Aisle Containment System user manual — SLOTTED SCREW
52ページ · クリックして拡大
52ページ

SX enclosures and InRow RC, front

ACDC2200 ACDC2201 ACDC2202 ACDC2203 - Adjustable support bracket

TOP VIEW LEFT BRACKET

SHORT SLOT LOCATED

REMOVE TOP BRACKET WHEN USED AT THE END

NetShelter Aisle Containment System — SHORT SLOT LOCATED diagram (page 52)
図 44

ON TOP

OF AN AISLE

REMOVE VERTICAL SUPPORT BRACKET. SAVE FOR FUTURE USE

WHEN INSTALLING A

SAVED FOR USE

DROP OUT CEILING

WITH ACDC2205

SYSTEM.

OR ACDC2300

1. Loosen the bottom retaining screw.
2. Insert a slotted screw driver bit into a tool slot at the top of the bracket and turn counter-clockwise to extend the bracket to its maximum height, shown by the height indicator. NOTE: Do not re-tighten the bottom retaining screw at this time. Height adjustments will need to be made later in the installation.
NetShelter Aisle Containment System — OR ACDC2300 diagram (page 52)
図 45

SLOTTED SCREW

HEIGHT INDICATOR

DRIVER BIT

SHOWN AT

ADJUST TO MAXIMUM

MAXIMUM ADJUSTABLE

HEIGHT

HEIGHT

TOP BRACKET

HEIGHT INDICATOR VIEWING PORT

TOOL SLOT

RETAINING

SCREW

TOP VIEW

3. Loosen the top retaining screw and rotate the top bracket so that the retaining screw is facing inside the aisle. Do not re-tighten retaining screw at this time NOTE: When positioning this adjustable bracket at the corner of ducted system, remove the top bracket. See ACDC2205 and ACDC2300 for further modifications.
Page 53 of the NetShelter Aisle Containment System user manual — M10 × 16
53ページ · クリックして拡大
53ページ

Airflow racks and InRow RC/RA rear

ACDC2204

TOP VIEW LEFT-HAND

TOP VIEW RIGHT-HAND

BRACKET

BRACKET

NetShelter Aisle Containment System — Airflow racks and InRow RC/RA rear diagram (page 53)
図 46 · Airflow racks and InRow RC/RA rear

M10 × 16

RC/RA ENCLOSURE (REAR)

NetShelter Aisle Containment System — M10 × 16 diagram (page 53)
図 47
Page 54 of the NetShelter Aisle Containment System user manual — BRACKET REPLACES
54ページ · クリックして拡大
54ページ

VX Enclosure, PDU duct system, PDU, and PDPM

ACDC2205

NetShelter Aisle Containment System — VX Enclosure, PDU duct system, PDU, and PDPM diagram (page 54)
図 48 · VX Enclosure, PDU duct system, PDU, and PDPM

BRACKET PDU/PDPM ENCLOSURE PDU ENCLOSURE

VX BRACKET

NetShelter Aisle Containment System — BRACKET PDU/PDPM ENCLOSURE PDU ENCLOSURE diagram (page 54)
図 49
NetShelter Aisle Containment System — BRACKET PDU/PDPM ENCLOSURE PDU ENCLOSURE diagram (page 54)
図 50

BRACKET REPLACES

EXISTING BRACKET THAT

COMES WITH

ACDC2300

BRACKET FROM

ACDC2200 -

ACDC2203

VX ENCLOSURE,

FRONT

M4 × 12 M6 × 20

Horizontal panel support bracket and corners for duct system

ACDC2300

BRACKET REPLACES

M6 × 12

EXISTING BRACKET THAT COMES

WITH ACDC2300

HORIZONTAL SUPPORT BRACKET DUCT SYSTEM CORNER

Page 55 of the NetShelter Aisle Containment System user manual — USE 6MM WRENCH
55ページ · クリックして拡大
55ページ

For ACDA901 enclosures

ACDC2000–ACDC2003, ACDC2204, and ACDC2205

Use the M12 to M10 adapter and M10 nut (supplied in kits) to attach fixed or adjustable mounting brackets. For ACDC2204 and ACDC2205, install the bracket on the rack first then attach it to the adjustable support with two

screws.

NetShelter Aisle Containment System — For ACDA901 enclosures diagram (page 55)
図 51 · For ACDA901 enclosures

USE 6MM WRENCH

ADAPTER

Page 56 of the NetShelter Aisle Containment System user manual — Typical order of installation
56ページ · クリックして拡大
56ページ

Duct System

Installation Overview

Component identification

The example below is shown with adjustable support brackets.

NetShelter Aisle Containment System — Component identification diagram (page 56)
図 52 · Component identification

Typical order of installation

NetShelter Aisle Containment System — Typical order of installation diagram (page 56)
図 53 · Typical order of installation
Page 57 of the NetShelter Aisle Containment System user manual — IMPORTANT:
57ページ · クリックして拡大
57ページ

How to cut material

NetShelter Aisle Containment System — How to cut material diagram (page 57)
図 54 · How to cut material
  • Be sure to read and follow the instructions that come with your power tools.
  • Wear protective clothing and eye wear.

Failure to follow these instructions can result in death, serious injury, or

1. If necessary, disassemble components such as duct panels.
2. Measure and mark the material
3. With a metal cutting blade, cut the material making a straight perpendicular cut. IMPORTANT FOR DUCT PANELS: The rail channels must be removed before cutting the duct panel rails.
4. Clean or de-burr the edges. IMPORTANT: When installing a cut extrusion, position the cut end so that it cannot be seen.
1. Measure and mark the material.
2. Cut the material using a straight edge and the appropriate cutting tool.

IMPORTANT:

  • Do not remove the protective covering before cutting panels.
  • DO NOT remove or cut off Schneider Electric label
  • Use a straight edge to help guide the cut.
NetShelter Aisle Containment System — IMPORTANT: diagram (page 57)
図 55

Metal extrusions · Clear panels

Page 58 of the NetShelter Aisle Containment System user manual — CLEAR PANEL
58ページ · クリックして拡大
58ページ

Duct panel corner detail

12 mm (0.47 in.)

RAIL CHANNEL

8 mm (0.32 in.)

CLEAR PANEL

ANGLE CONNECTOR

Page 59 of the NetShelter Aisle Containment System user manual — Horizontal and vertical duct panel size adjustment
59ページ · クリックして拡大
59ページ

Adjusting the Size Of the Duct Panels and Rails

Depending on your ducting requirements the size of the panels may need to be adjusted. Refer to the information below for resizing information.

NetShelter Aisle Containment System — Adjusting the Size Of the Duct Panels and Rails diagram (page 59)
図 56 · Adjusting the Size Of the Duct Panels and Rails

Horizontal and vertical duct panel size adjustment

Disassemble the duct panels.

NetShelter Aisle Containment System — Horizontal and vertical duct panel size adjustment diagram (page 59)
図 57 · Horizontal and vertical duct panel size adjustment

Horizontal panel resizing information

NetShelter Aisle Containment System — Horizontal and vertical duct panel size adjustment diagram (page 59)
図 58 · Horizontal and vertical duct panel size adjustment
Page 60 of the NetShelter Aisle Containment System user manual — Adjusting the Size Of the Duct Panels and Rails
60ページ · クリックして拡大
60ページ
NetShelter Aisle Containment System — Adjusting the Size Of the Duct Panels and Rails diagram (page 60)
図 59 · Adjusting the Size Of the Duct Panels and Rails

Standard aisle widths measurement calculations for horizontal panels

NetShelter Aisle Containment System — Adjusting the Size Of the Duct Panels and Rails diagram (page 60)
図 60 · Adjusting the Size Of the Duct Panels and Rails

900 mm / 3 ft 1072 mm / 42 in. N/A No change required 1 1200 mm / 4 ft 1377 mm / 54 in. 688.5 mm / 27.1 in. cut 593 mm rail to 533 mm

1500 mm / 5 ft 1682 mm / 66 in. 841 mm / 33.1 in. cut 593 mm rail to 533 mm

1800 mm /6 ft 1987 mm / 78 in. 993.5 mm / 39.1 in. cut 593 mm rail to 533 mm

Page 61 of the NetShelter Aisle Containment System user manual — BEFORE AFTER
61ページ · クリックして拡大
61ページ

Horizontal panel (ACDC2305, ACDC2306) and air block panel (ACDC2303, ACDC2304)

adjustment calculations

If the nominal aisle width is 900 mm (3 ft) bypass this step and proceed to the Horizontal Duct Panel Installation section.

1. Verify nominal aisle width.
2. Obtain the duct width (horizontal span) from the table above .
3. Disassemble the panel frame corner connector (there is no need to disassemble the three section length extrusion) .
4. Cut 60 mm (2.4 in.) off of the 593 mm (23.3 in.) section of extrusion from the depth of both left and right panels.
5. Cut the 1012 mm (39.8 in.) section of extrusion from the width of both left and right panels to the extrusion width specified in the table for the nominal aisle width. IMPORTANT: When resizing 1200–1800 mm (4–6 ft.) nominal aisle panels, the clear panel must be cut to size to allow reassembly of the frame around the panel.

The width dimension of the panel is to be modified as follows: NOTE: The depth of the panel requires no size modification.

Calculation to determine cut dimension of clear panel: Cut value = 1012 mm (39.8 in.) – 60 mm (2.4 in.) – extrusion width in table

Example for a 1500 mm (5 ft.) nominal aisle: Cut Value = 1012 mm (39.8 in.) – 60 mm (2.4 in.) – 841 mm (33.1 in.) Cut Value = 111 mm (4.37 in.) removed from each of the two horizontal clear panel material

Reassemble the duct panel positioning the depth rails (made of three sections) to the inside width rails.

BEFORE AFTER

DEPTH

WIDTH (ACROSS AISLE)

Page 62 of the NetShelter Aisle Containment System user manual — CONNECTORS ON OUTSIDE AND
62ページ · クリックして拡大
62ページ

Adjusting the size of the duct mounting rails

Length calculationOverall rail length = length of row – 60 mm

CONNECTORS ON OUTSIDE AND

BOTTOM CHANNELS

NetShelter Aisle Containment System — CONNECTORS ON OUTSIDE AND diagram (page 62)
図 61
Page 63 of the NetShelter Aisle Containment System user manual — MOUNTING
63ページ · クリックして拡大
63ページ

Horizontal Duct Panel Installation

1. Identify the panels to be used for the horizontal panels (from ACDC2305 or ACDC2306). If necessary, adjust panel size to span the opening based on the aisle width.
2. Install mounting brackets on each side of the aisle. See “Support Bracket Installation” on page 40.

GASKET

3. Install gasket material as shown on both the bracket and the enclosure. Cut two 771 mm sections of support rail from ACDC2300 or ACDC2301.

MOUNTING

BRACKET

4. Install the support rails (a).
5. Install a gasket strip between the panels.
6. Attach the two horizontal panels together and then attach them to the upper support rails.
NetShelter Aisle Containment System — MOUNTING diagram (page 63)
図 62
Page 64 of the NetShelter Aisle Containment System user manual — 900 MM / 3 FT
64ページ · クリックして拡大
64ページ

Duct System Installation

Refer to “Support Bracket Installation” on page 40 for instructions on how to install the support brackets.

Rail supports

1. Install the cross aisle supports— ACDC2300, ACDC2301. NOTE: If horizontal panels have been installed start at the opposite end of the row.
NetShelter Aisle Containment System — Rail supports diagram (page 64)
図 63 · Rail supports
NetShelter Aisle Containment System — Rail supports diagram (page 64)
図 64 · Rail supports

900 MM / 3 FT

1200 MM / 4 FT

1500 MM / 5 FT

1800 MM / 6 FT

Page 65 of the NetShelter Aisle Containment System user manual — Duct System Installation
65ページ · クリックして拡大
65ページ
2. Attach the side support rails to the mounting brackets.
NetShelter Aisle Containment System — Duct System Installation diagram (page 65)
図 65 · Duct System Installation
3. Continue to install the side support rails connecting them together as shown. Shorter side rail support pieces from additional kits may need to be installed to complete this step.
Length calculationOverall rail length = length of row – 60 mm
NetShelter Aisle Containment System — Duct System Installation diagram (page 65)
図 66 · Duct System Installation
Page 66 of the NetShelter Aisle Containment System user manual — LOWER EXTENSIONS
66ページ · クリックして拡大
66ページ

Duct panels and cross-bracing

1. Insert the angle brackets, removed from the duct panels, into the end and side support rails. A set of two angle brackets are used per panel. NOTE: Position each set of angle brackets so the lower extensions face each other.

SUPPORT RAIL

2. Following the order of installation shown in the illustration, start at one the end of the aisle and install the duct panels working towards the opposite end of the aisle.

LOWER EXTENSIONS

FACE EACH OTHER

a. Place the duct panels onto each set of angle brackets.

b. Between each panel install the black foam gasket

(provided with each panel).

3. Connect each panel together using the supplied joining brackets.
NetShelter Aisle Containment System — LOWER EXTENSIONS diagram (page 66)
図 67
Page 67 of the NetShelter Aisle Containment System user manual — Duct panels and cross-bracing
67ページ · クリックして拡大
67ページ
4. As each pair of duct panels are installed, attach a cross-aisle support. Do this for each pair down the entire length of the row.
NetShelter Aisle Containment System — Duct panels and cross-bracing diagram (page 67)
図 68 · Duct panels and cross-bracing
5. In certain configurations, you may not have access to the outer corner of the duct to install the outer joining brackets. Instead, install the provided corner brackets on the inner corner of the duct.
Page 68 of the NetShelter Aisle Containment System user manual — Adjust the height of the duct assembly
68ページ · クリックして拡大
68ページ
NetShelter Aisle Containment System — Adjust the height of the duct assembly diagram (page 68)
図 69 · Adjust the height of the duct assembly
1. Loosen the retaining screws on the adjustable mounting brackets.
2. Using a 14 mm wrench adjust the height of the duct assembly positioning it at its desired height. Make sure the entire duct assembly is level and plumb.
Page 69 of the NetShelter Aisle Containment System user manual — End-of-aisle air block panel—ACDC2303 and ACDC2304
69ページ · クリックして拡大
69ページ

End-of-aisle air block panel—ACDC2303 and ACDC2304

Standard aisle widths measurement calculations for air block panels:

NetShelter Aisle Containment System — End-of-aisle air block panel—ACDC2303 and ACDC2304 diagram (page 69)
図 70 · End-of-aisle air block panel—ACDC2303 and ACDC2304

900 mm / 3 ft 1072 mm/ 42 in. N/A 504 mm - gap 1 1200 mm / 4 ft 1377 mm / 54 in. 688.5 mm 504 mm - gap 2 1500 mm / 5 ft 1682 mm / 66 in. 841 mm 504 mm - gap 2 1800 mm / 6 ft 1987 mm / 78 in. 993.5 mm 504 mm - gap 2

1. Measure the distance between the bottom of the vertical duct panels and the top of the horizontal panel.
3. Insert duct corner brackets (a) into the air block panel and the duct panel mounting rail.
4. Attach the air block panels to the horizontal duct panels with joining brackets and channel nuts (b).
Page 70 of the NetShelter Aisle Containment System user manual — Side air block panels
70ページ · クリックして拡大
70ページ

Side air block panels

1. Install the upper air block mounting rails and wire covers (if necessary) onto the lower support rails.
NetShelter Aisle Containment System — Side air block panels diagram (page 70)
図 71 · Side air block panels
Page 71 of the NetShelter Aisle Containment System user manual — LOWER SUPPORT BRACKET
71ページ · クリックして拡大
71ページ
2. Measure the distance between the upper and lower air block mounting rails. Cut the air block to fit the opening.
NetShelter Aisle Containment System — Side air block panels diagram (page 71)
図 72 · Side air block panels
NetShelter Aisle Containment System — Side air block panels diagram (page 71)
図 73 · Side air block panels

FOR V-0 MATERIAL FOR RIBBED

LEXAN

3. Install the lower support brackets (if applicable). NOTE: This bracket is used to help support the lower end of an air block where enclosures of two different heights meet. Reference ACDC2200–ACDC2203
NetShelter Aisle Containment System — FOR V-0 MATERIAL FOR RIBBED diagram (page 71)
図 74

LOWER SUPPORT BRACKET

Page 72 of the NetShelter Aisle Containment System user manual — Side air block panels
72ページ · クリックして拡大
72ページ
4. Install the air blocks. NOTE: Create a hole in the gasket to allow the lower mounting screw to pass through.
NetShelter Aisle Containment System — Side air block panels diagram (page 72)
図 75 · Side air block panels
5. Continue to install the side air blocks down the entire length of the row. NOTE: The gasket is offset to allow overlapping of the adjacent panel.
Page 73 of the NetShelter Aisle Containment System user manual — Order of Installation Overview
73ページ · クリックして拡大
73ページ

Ceiling Panel System

WARNING

SHARP EDGE HAZARD

  • Be sure to read and follow the instructions that come with your power tools.
  • Wear protective clothing and eye wear.

Failure to follow these instructions can result in death, serious injury, or

equipment damage.

NOTICE

EQUIPMENT DAMAGE HAZARD

If a rack door is open when the dropout ceiling system activates, ceiling panels may be blocked by the rack door and not drop completely.

Failure to follow these instructions can result in equipment damage.

Order of Installation Overview

1. Install the mounting brackets. (Fixed or adjustable support brackets can be used with this system)
2. Install the ceiling panel mounting rails.
3. Connect the mounting rails together.
4. Insert the ceiling panels.
5. Install air blocks (adjustable mounting system only).
Page 74 of the NetShelter Aisle Containment System user manual — IMPORTANT:
74ページ · クリックして拡大
74ページ

How to Cut Material

WARNING

SHARP EDGE HAZARD

  • Be sure to read and follow the instructions that come with your power tools.
  • Wear protective clothing and eye wear.

Failure to follow these instructions can result in death, serious injury, or

equipment damage.

Metal extrusions

1. If necessary, disassemble components.
2. Measure and mark the material.
3. With a metal cutting blade, cut the material making a straight perpendicular cut.
4. Clean or de-burr the edges.

Clear panels

1. Measure and mark the material.
2. Cut the material using a straight edge and the appropriate cutting tool.

IMPORTANT:

  • Do not remove the protective covering before cutting panels.
  • Do not remove or cut off Schneider Electric or UL labels.
  • Use a straight edge to help guide the cut.
Page 75 of the NetShelter Aisle Containment System user manual — Install the ceiling panel mounting rails
75ページ · クリックして拡大
75ページ

Installation

Install mounting brackets

Refer to “Support Bracket Installation” on page 40 for instructions on how to install the support brackets.

For non-adjustable mounting brackets only—install the gasket material inside the mounting brackets and along to the top of the enclosures.

NetShelter Aisle Containment System — Install mounting brackets diagram (page 75)
図 76 · Install mounting brackets

Install the ceiling panel mounting rails

When installing the mounting rails:

  • Make sure the hinge flaps are in the locked position.
NetShelter Aisle Containment System — Install the ceiling panel mounting rails diagram (page 75)
図 77 · Install the ceiling panel mounting rails
  • Attach the rail sections together on the ground first, then lift into place. NOTE: To prevent damage or warping, do not exceed a length of 3600 mm for any pre-assembled section.
  • When reaching the end of the aisle, there may be a gap. This gap will be covered using the end aisle cover. See the section called End Aisle Cover— ACDC2003 later in this document.

na4022a

Page 76 of the NetShelter Aisle Containment System user manual — Installation
76ページ · クリックして拡大
76ページ
NetShelter Aisle Containment System — Installation diagram (page 76)
図 78 · Installation

Fixed support bracket support installation

NetShelter Aisle Containment System — Installation diagram (page 76)
図 79 · Installation

na4023a

Page 77 of the NetShelter Aisle Containment System user manual — Connecting mounting rails together
77ページ · クリックして拡大
77ページ

Adjustable mounting support installation

NetShelter Aisle Containment System — Connecting mounting rails together diagram (page 77)
図 80 · Connecting mounting rails together

Main rail sections

Page 78 of the NetShelter Aisle Containment System user manual — LOWER
78ページ · クリックして拡大
78ページ
NetShelter Aisle Containment System — Connecting mounting rails together diagram (page 78)
図 81 · Connecting mounting rails together

End aisle cover—ACDC2003.

TOP COVER PLATE

NetShelter Aisle Containment System — TOP COVER PLATE diagram (page 78)
図 82

LOWER

PLATE

BOTTOM PLATE

1. Attach the top cover by sliding into position covering the gap between the mounting rails.
2. Install the bottom plate.
3. Install the lower plate. IMPORTANT: Before continuing the installation, check to ensure that the mounting rails are level both across the aisle and along the length of the row.

End sections—ACDC2003

Page 79 of the NetShelter Aisle Containment System user manual — For a single row aisle —ACDC2004
79ページ · クリックして拡大
79ページ

For a single row aisle —ACDC2004

Install the ceiling panel wall mounting rails, end-to-end, onto the wall opposite the ceiling panel mounting rail. Use the appropriate fasteners for the materials they are being installed on.

NetShelter Aisle Containment System — For a single row aisle —ACDC2004 diagram (page 79)
図 83 · For a single row aisle —ACDC2004
NetShelter Aisle Containment System — For a single row aisle —ACDC2004 diagram (page 79)
図 84 · For a single row aisle —ACDC2004

At the end of the row, overlap the mounting rails. If necessary reduce the length of one of the spring retainers.

NetShelter Aisle Containment System — For a single row aisle —ACDC2004 diagram (page 79)
図 85 · For a single row aisle —ACDC2004
Page 80 of the NetShelter Aisle Containment System user manual — LOWER SUPPORT
80ページ · クリックして拡大
80ページ

Install the air blocks—adjustable mounting brackets only

1. Install the lower support brackets (if applicable). NOTE: This bracket is used to help support the lower end of the air block where enclosures of two different heights meet. Reference ACDC2200– ACDC2203.
NetShelter Aisle Containment System — Install the air blocks—adjustable mounting brackets only diagram (page 80)
図 86 · Install the air blocks—adjustable mounting brackets…
2. Measure the distance between the underside of the mounting rail and the top of the enclosure.
3. Cut the air block to fit the opening. IMPORTANT: Take into consideration the differences in channel size for the type of material used for the air blocks.
4. Install the air blocks. Create a hole in the gasket to allow the lower mounting screw to pass through.

AIR BLOCK

NetShelter Aisle Containment System — AIR BLOCK diagram (page 80)
図 87
5. Continue to install the side air blocks down the entire length of the row. NOTE: The gasket is offset to allow overlapping of the adjacent panel.

LOWER SUPPORT

RAIL HOLE

Page 81 of the NetShelter Aisle Containment System user manual — Install the ceiling panels
81ページ · クリックして拡大
81ページ

Install the ceiling panels

NetShelter Aisle Containment System — Install the ceiling panels diagram (page 81)
図 88 · Install the ceiling panels

Install the ceiling panels:

1. Remove the protective plastic.
2. Slide one edge into one of the mounting rails.
3. Push the panel in and compress the springs allowing room to insert the opposite end of the panel in the mounting rail on the opposite row.
4. Release the panel. The spring retainers will automatically center the panels within the aisle.
5. The size of the last panel may need to be modified to fit.
NetShelter Aisle Containment System — Install the ceiling panels diagram (page 81)
図 89 · Install the ceiling panels
Page 82 of the NetShelter Aisle Containment System user manual — CLEAR PANEL
82ページ · クリックして拡大
82ページ
NetShelter Aisle Containment System — Install the ceiling panels diagram (page 82)
図 90 · Install the ceiling panels

LABELS

CEILING PANEL CORNER DETAIL

NetShelter Aisle Containment System — LABELS diagram (page 82)
図 91

CLEAR PANEL

GASKET

ANGLE CONNECTOR

RAIL CHANNEL

Page 83 of the NetShelter Aisle Containment System user manual — Installation overview
83ページ · クリックして拡大
83ページ

Door Assembly

Installation

Safety

NetShelter Aisle Containment System — Safety diagram (page 83)
図 92 · Safety

Use at least two people when handling and installing this equipment.

Failure to follow these instructions can result in death, serious injury, or

Before you begin

If necessary remove the doors of the enclosures located at the end of a row.

Refer to the User Manual that comes with the enclosures for more information.

Installation overview

NetShelter Aisle Containment System — Installation overview diagram (page 83)
図 93 · Installation overview

Hinge posts and guide rails

Handle and lock assembly

Show 7 more labels / short text on this page
Door post brackets · Door posts · Door header · Threshold · Door header covers · Doors · Apply warning labels
Page 84 of the NetShelter Aisle Containment System user manual — COVER
84ページ · クリックして拡大
84ページ

Door posts

Determine the required door post height. Install post extensions where necessary.

– 42 U SX, no extensions

– 42 U VX/45 U SX, one extension

– 48 U SX, two extensions

To install door posts:

1. On the door posts, loosen but do not remove, the 7 mm nut. Remove the cover plate.
NetShelter Aisle Containment System — Door posts diagram (page 84)
図 94 · Door posts

COVER

PLATE

2. Install the necessary number of height extensions. NOTE: Install the same number of extensions on each side of the aisle.
NetShelter Aisle Containment System — COVER diagram (page 84)
図 95
3. Reinstall all cover plates.
4. Install the joining brackets to the door posts. NOTE: For SX enclosures, remove any the existing joining bracket from the enclosure.

7 mm NUT · na4207a

Page 85 of the NetShelter Aisle Containment System user manual — ACDC2405, ACDC2406
85ページ · クリックして拡大
85ページ
5. Attach the door posts to the enclosures using the joining brackets. NOTE: The holes in the top of the door posts should be positioned facing away from the aisle.
NetShelter Aisle Containment System — Door posts diagram (page 85)
図 96 · Door posts

ACDC2405, ACDC2406

NetShelter Aisle Containment System — ACDC2405, ACDC2406 diagram (page 85)
図 97
Page 86 of the NetShelter Aisle Containment System user manual — ACDC2405 ACDC2406
86ページ · クリックして拡大
86ページ

Lower door post brackets

The adjustable lower door post brackets located in kits ACDC2405 and ACDC2406 are preset at the factory to fit the front and rear of an SX enclosure. When attaching to a VX enclosure, an adjustment must be made.

NetShelter Aisle Containment System — Lower door post brackets diagram (page 86)
図 98 · Lower door post brackets
NetShelter Aisle Containment System — Lower door post brackets diagram (page 86)
図 99 · Lower door post brackets

ACDC2404

NetShelter Aisle Containment System — ACDC2404 diagram (page 86)
図 100

ACDC2405 ACDC2406

Page 87 of the NetShelter Aisle Containment System user manual — LOCATION MARKERS
87ページ · クリックして拡大
87ページ

Door header

1. Install one M8 × 12 T30 screw into one of the door posts. NOTE: Do not tighten at this time.
2. Hang one side of the door header on the screw installed in step one. Using this screw as a support, attach the other end of the header to the door post on the opposite side of the aisle using an M8 × 12 T30 screw. NOTE: Do not tighten at this time.
NetShelter Aisle Containment System — Door header diagram (page 87)
図 101 · Door header
3. Using the location markers located near the mounting holes as a guide, center the door header in the door opening.
NetShelter Aisle Containment System — Door header diagram (page 87)
図 102 · Door header

LOCATION MARKERS

4. Slide the upper guide rails outward to access the remaining mounting holes. Install the M8 × 12 T30 screws, eight total.
NetShelter Aisle Containment System — LOCATION MARKERS diagram (page 87)
図 103
5. Tighten all M8 × 12 T30 screws.

na4030a

Page 88 of the NetShelter Aisle Containment System user manual — RIGHT SIDE
88ページ · クリックして拡大
88ページ

Lower guide rails

Using M6 × 12 screws (ACDC2400), attach the lower guide rails to the bottom of the door posts. Install the lower guide rail end caps to the ends of the lower guide rails and under the enclosure of each side of the row.

NetShelter Aisle Containment System — Lower guide rails diagram (page 88)
図 104 · Lower guide rails

Attach the left and right lower guide rails to

the door posts.

RIGHT SIDE

NetShelter Aisle Containment System — RIGHT SIDE diagram (page 88)
図 105

na4032a

Page 89 of the NetShelter Aisle Containment System user manual — INSTALL LOWER GUIDE MOUNTING
89ページ · クリックして拡大
89ページ

End caps—SX

NetShelter Aisle Containment System — End caps—SX diagram (page 89)
図 106 · End caps—SX
1. Loosen the nut on both end caps.
2. Rotate the rack clip to the proper position and slip it under the side rail of the rack.
3. Attach the end cap to the lower guide rail with three M5 × 12 screws.
4. Ensure the lower guide rail is level.
5. Adjust the rack clip up or down to level and tighten the nut.

End caps—VX

When installing the door assembly to a VX enclosure:

1. Remove the rack clip from the end cap and replace with the lower guide rail mounting bracket for VX enclosures.
NetShelter Aisle Containment System — End caps—VX diagram (page 89)
図 107 · End caps—VX
2. Attach the end cap and lower guide mounting rail assembly to the lower guide rail and the VX enclosure. Use the appropriate left or right side bracket, depending on aisle width. See example below.

INSTALL LOWER GUIDE MOUNTING

BRACKET

Page 90 of the NetShelter Aisle Containment System user manual — Hinge posts
90ページ · クリックして拡大
90ページ

Install the VX end caps to lower guide rail and enclosure.

LEFT HAND BRACKET, 4AND 5-FOOT AISLES

NetShelter Aisle Containment System — LEFT HAND BRACKET, 4AND 5-FOOT AISLES diagram (page 90)
図 108

Hinge posts

1. Attach the left and right hinge posts to the upper and lower guide rail assemblies. For each hinge post, install four M6 flange nuts for the top and two at the bottom. NOTE: Do not tighten at this time. IMPORTANT: Be sure to position the hinge pins so that they face towards the outside of the door frame.
NetShelter Aisle Containment System — Hinge posts diagram (page 90)
図 109 · Hinge posts
2. Tighten all of the fasteners.

na4031a

Page 91 of the NetShelter Aisle Containment System user manual — Threshold
91ページ · クリックして拡大
91ページ
NetShelter Aisle Containment System — Threshold diagram (page 91)
図 110 · Threshold

Threshold

1. Remove the door stops on each lower guide rail.
2. Measure the distance between the door post guides. Using a hacksaw or similar, cut the threshold to length and remove rough edges with a metal file.
NetShelter Aisle Containment System — Threshold diagram (page 91)
図 111 · Threshold
3. Using a mild cleaning agent, remove any dirt or residue that may prevent the threshold from sticking to the floor.
4. Use the door stops as a temporary placement guide. Place the threshold on the floor between the lower guide rails and mark its position.
5. Remove the double-stick foam tape on the bottom of the threshold and attach to the floor.
Page 92 of the NetShelter Aisle Containment System user manual — Threshold
92ページ · クリックして拡大
92ページ
NetShelter Aisle Containment System — Threshold diagram (page 92)
図 112 · Threshold
Page 93 of the NetShelter Aisle Containment System user manual — Securing door header to railing
93ページ · クリックして拡大
93ページ

Securing door header to railing

Ducting system with vertical panels at end of row

1. Attach the inner header cover.
NetShelter Aisle Containment System — Securing door header to railing diagram (page 93)
図 113 · Securing door header to railing
Page 94 of the NetShelter Aisle Containment System user manual — INSIDE AISLE VIEW SIDE VIEW
94ページ · クリックして拡大
94ページ
NetShelter Aisle Containment System — Securing door header to railing diagram (page 94)
図 114 · Securing door header to railing
2. Secure the header to the railing with the appropriate brackets using the six M6 x 12 TORX screws and M6 channel nuts. NOTE: Some components not shown for easier viewing.

INSIDE AISLE VIEW SIDE VIEW

Page 95 of the NetShelter Aisle Containment System user manual — Securing door header to railing
95ページ · クリックして拡大
95ページ
3. Cut the foam seal to fit and cover the openings.
NetShelter Aisle Containment System — Securing door header to railing diagram (page 95)
図 115 · Securing door header to railing

Ducting system with horizontal panels at end of row

Page 96 of the NetShelter Aisle Containment System user manual — M6 X 12
96ページ · クリックして拡大
96ページ
2. Secure the header to the railing with the appropriate brackets using the six M6 x 12 TORX screws and M6 channel nuts. NOTE: Some components not shown for easier viewing.
NetShelter Aisle Containment System — Securing door header to railing diagram (page 96)
図 116 · Securing door header to railing

M6 X 12

TORX

SIDE VIEW

Page 97 of the NetShelter Aisle Containment System user manual — Securing door header to railing
97ページ · クリックして拡大
97ページ
3. Cut the foam seal to fit and cover the openings.
NetShelter Aisle Containment System — Securing door header to railing diagram (page 97)
図 117 · Securing door header to railing

Ceiling system

Page 98 of the NetShelter Aisle Containment System user manual — Securing door header to railing
98ページ · クリックして拡大
98ページ
2. Using ACDC2301, place railing across the top of the ceiling support. Aisle width will determine which rails are used.

See “Adjusting the size of the duct mounting rails” on page 54 for information on cutting the rails.

NetShelter Aisle Containment System — Securing door header to railing diagram (page 98)
図 118 · Securing door header to railing
Page 99 of the NetShelter Aisle Containment System user manual — INSIDE AISLE VIEW SIDE VIEW
99ページ · クリックして拡大
99ページ
3. Secure the header to the railing with the appropriate brackets using the six M6 x 12 TORX screws and M6 channel nuts. NOTE: Some components not shown for easier viewing.
NetShelter Aisle Containment System — Securing door header to railing diagram (page 99)
図 119 · Securing door header to railing

INSIDE AISLE VIEW SIDE VIEW

Page 100 of the NetShelter Aisle Containment System user manual — FOAM SEAL
100ページ · クリックして拡大
100ページ
4. Cut the foam seal to fit and cover the openings.
NetShelter Aisle Containment System — Securing door header to railing diagram (page 100)
図 120 · Securing door header to railing

FOAM SEAL

Page 101 of the NetShelter Aisle Containment System user manual — DOOR HINGE AND PIN
101ページ · クリックして拡大
101ページ

Doors

1. Hang the doors on the hinge pins. NOTE: Doors must be positioned 90° to the door frame when installing.
NetShelter Aisle Containment System — Doors diagram (page 101)
図 121 · Doors

Be sure to use two people when performing this operation.

Failure to follow these instructions can result in death, serious injury, or

2. Make the control connection on each door. NOTE: NetBotz and AFC connections can connect to either port.

INSTALL DOOR 90° TO

NetShelter Aisle Containment System — INSTALL DOOR 90° TO diagram (page 101)
図 122

DOOR HINGE AND PIN

CONTROL CONNECTION

3. Close the doors by gently lifting the doors onto the door threshold. Push the top of the door in towards the header, securing them to the upper latch.

na4035a

Page 102 of the NetShelter Aisle Containment System user manual — IMPORTANT:
102ページ · クリックして拡大
102ページ

Door handle and lock assembly

1. Remove the cover plate located on the outside of the right-hand door.
2. Install the door handle and lock assembly using four M4 × 12 self-tapping screws.
3. Cover the screw holes on the inside of the door with hole plugs.
NetShelter Aisle Containment System — Door handle and lock assembly diagram (page 102)
図 123 · Door handle and lock assembly

Adjust door closing dampers

Ensure that the doors close completely and the door handles latch securely.

Using the damper adjustment screw, adjust the dampers on both the left and right sides until the doors close smoothly and completely. Turning the adjustment screw to the right provides more resistance, to the left provides less.

IMPORTANT:

  • Before making this adjustment, check for obstructions that may prevent the door from closing properly.
  • For proper operation, make sure the magnets on the dampeners are in contact with the magnets on their respective doors .
NetShelter Aisle Containment System — IMPORTANT: diagram (page 102)
図 124
Page 103 of the NetShelter Aisle Containment System user manual — M4 × 6 MM SCREWS
103ページ · クリックして拡大
103ページ

Outer door header cover and blanking panel

1. Install outer header cover and attach with M4 × 6 mm screws.

M4 × 6 MM SCREWS

NetShelter Aisle Containment System — M4 × 6 MM SCREWS diagram (page 103)
図 125
2. If no Active Flow Controller will be used, install a blanking panel in the door header using four screws.
NetShelter Aisle Containment System — M4 × 6 MM SCREWS diagram (page 103)
図 126

If using an Active Flow Controller, refer to the instructions that come with that device for installation instructions.

3. Check the alignment. If necessary, remove the leveling adjustment cover plate and adjust the doors so that the vertical gap between them is the same from top to bottom.
NetShelter Aisle Containment System — M4 × 6 MM SCREWS diagram (page 103)
図 127

na4033a

Page 104 of the NetShelter Aisle Containment System user manual — Post-installation checklist
104ページ · クリックして拡大
104ページ
NetShelter Aisle Containment System — Post-installation checklist diagram (page 104)
図 128 · Post-installation checklist
4. Remove the metal covers from magnets on lower guide rails.
5. Remove the plastic protection material from both sides of the door panels.
6. Attach the appropriate warning label to the outside of the door in the space provided.

Post-installation checklist

NetShelter Aisle Containment System — Post-installation checklist diagram (page 104)
図 129 · Post-installation checklist
  • DO NOT pull doors closed manually.
  • When swinging the doors open on their hinges, do no open more then 90°.

Failure to follow these instructions can result in equipment damage.

  • Auto close feature on each door works properly
  • Hold open feature on each door works properly
  • Doors ride smoothly on floor track and there is no debris in the threshold
  • Latch and lock functions properly
  • Inside emergency release is functional
Page 105 of the NetShelter Aisle Containment System user manual — Door Curtain
105ページ · クリックして拡大
105ページ

Door Curtain

Installation—Ceiling System

1. Adjust the cross-aisle support length based on the aisle width.
NetShelter Aisle Containment System — Door Curtain diagram (page 105)
図 130 · Door Curtain
2. Attach the cross-aisle support to the support rails.
NetShelter Aisle Containment System — Door Curtain diagram (page 105)
図 131 · Door Curtain
NetShelter Aisle Containment System — Door Curtain diagram (page 105)
図 132 · Door Curtain

Dual row aisle · Single row aisle

Page 106 of the NetShelter Aisle Containment System user manual — Door Curtain
106ページ · クリックして拡大
106ページ
3. Attach the door curtain rails to the cross-aisle support.
NetShelter Aisle Containment System — Door Curtain diagram (page 106)
図 133 · Door Curtain
4. Attach the door hanger clips to the door curtains.
NetShelter Aisle Containment System — Door Curtain diagram (page 106)
図 134 · Door Curtain
5. Install the door curtain assemblies. NOTE: Make sure curtains overlap in the same direction.
NetShelter Aisle Containment System — Door Curtain diagram (page 106)
図 135 · Door Curtain

na4042a

Page 107 of the NetShelter Aisle Containment System user manual — Door Curtain
107ページ · クリックして拡大
107ページ
6. Attach the curtain door rail cover.
NetShelter Aisle Containment System — Door Curtain diagram (page 107)
図 136 · Door Curtain
Page 108 of the NetShelter Aisle Containment System user manual — Installation—Duct System
108ページ · クリックして拡大
108ページ
NetShelter Aisle Containment System — Installation—Duct System diagram (page 108)
図 137 · Installation—Duct System
1. Attach the door curtain rail to the cross aisle ceiling frame.
3. Install the door curtain assemblies.
NetShelter Aisle Containment System — Installation—Duct System diagram (page 108)
図 138 · Installation—Duct System
Page 109 of the NetShelter Aisle Containment System user manual — Installation—Duct System
109ページ · クリックして拡大
109ページ
NetShelter Aisle Containment System — Installation—Duct System diagram (page 109)
図 139 · Installation—Duct System
Page 110 of the NetShelter Aisle Containment System user manual — System Diagram
110ページ · クリックして拡大
110ページ

Ceiling Panel Dropout Control System

System Diagram

NetShelter Aisle Containment System — System Diagram diagram (page 110)
図 140 · System Diagram

Item Description Item Description

Dropout power supply control box Temperature switch

Power cord Wiring box

Alarm beacon Box-to-box wire harness

Field supplied CAT-5 cable Box-to-box wire harness, across aisle

4-pin jumper (if no smoke detector is in use) Smoke detector cable (if smoke detector is in use)

Wire assembly—power supply to wiring box Wiring box cover

Electromechanical lock—up to 30 per control box

Terminal jumper

Page 111 of the NetShelter Aisle Containment System user manual — Power Supply Component Identification
111ページ · クリックして拡大
111ページ

Power Supply Component Identification

NetShelter Aisle Containment System — Power Supply Component Identification diagram (page 111)
図 141 · Power Supply Component Identification

Item Description Item Description

AC line, primary/secondary Electromechanical lock temp. switch connection

Power status indicator light Dropout alarm 2

Smoke detector connection Dropout alarm 1

na4070a

Page 112 of the NetShelter Aisle Containment System user manual — POWER SUPPLY
112ページ · クリックして拡大
112ページ

Installation

Power supply installation procedure

1. Attach the mounting brackets to the sides of the power supply.

POWER SUPPLY

NetShelter Aisle Containment System — POWER SUPPLY diagram (page 112)
図 142
2. Install the power supply onto the mounting rails of the enclosure using four caged nuts, cup washers, and M6 × 16 screws.
Page 113 of the NetShelter Aisle Containment System user manual — Electromechanical locks
113ページ · クリックして拡大
113ページ

Electromechanical locks

Attach the electromechanical lock onto the ceiling panel support rails.

1. Remove the two large hole plugs from the top of the ceiling panel supports.
2. Disconnect the electromechanical lock from the printed circuit board assembly.
3. Guide the wire connector from electromechanical lock through the hole in the top of the ceiling panel support.
4. Install the top half of the electromechanical lock to the top of the ceiling panel support rail with two M5 × 8 screws each. Place the printed circuit board assembly on top of the ceiling panel support rail and reconnect to the electromechanical lock.
5. Install the lower half of the electromechanical lock and spacer to the ceiling panel support rail hinged flap using one M6 × 10 screw each.
NetShelter Aisle Containment System — Electromechanical locks diagram (page 113)
図 143 · Electromechanical locks

na4084a

Page 114 of the NetShelter Aisle Containment System user manual — Temperature switches
114ページ · クリックして拡大
114ページ

Temperature switches

Using two M4 nuts each, install the temperature switches to the ceiling panel support rail hinged flap.

NetShelter Aisle Containment System — Temperature switches diagram (page 114)
図 144 · Temperature switches
Page 115 of the NetShelter Aisle Containment System user manual — Electrical boxes and cable routing
115ページ · クリックして拡大
115ページ

Electrical boxes and cable routing

1. Make the connection to the electromechanical locks and temperature switches. IMPORTANT: Position wires so they do not interfere with the closing of the hinge flap.
2. Install the wire boxes to the top of the ceiling panel mounting rails using four M4 × 8 screws each.
NetShelter Aisle Containment System — Electrical boxes and cable routing diagram (page 115)
図 145 · Electrical boxes and cable routing
3. Connect the wiring boxes together with box-to-box wire assemblies and the cross-aisle wiring assembly.
NetShelter Aisle Containment System — Electrical boxes and cable routing diagram (page 115)
図 146 · Electrical boxes and cable routing
Page 116 of the NetShelter Aisle Containment System user manual — 5 CABLE
116ページ · クリックして拡大
116ページ
NetShelter Aisle Containment System — Alarm beacon installation diagram (page 116)
図 147 · Alarm beacon installation

Alarm beacon installation

1. Using two M6 × 12 and channel nuts each, install two alarm beacons per power supply control box positioning them at opposite corners of the aisle. NOTE: For clarity electrical boxes and wires not shown.
2. Connect the alarm beacons to the power supply control box using field supplied CAT-5 cable.

FIELD SUPPLIED CAT-

NetShelter Aisle Containment System — FIELD SUPPLIED CAT- diagram (page 116)
図 148

5 CABLE

Page 117 of the NetShelter Aisle Containment System user manual — 4-PIN JUMPER
117ページ · クリックして拡大
117ページ

Smoke detector installation

Connect the 4-pin jumper to the Smoke Sensor connector if an external smoke detector is not being used.

NetShelter Aisle Containment System — Smoke detector installation diagram (page 117)
図 149 · Smoke detector installation

4-PIN JUMPER

Page 118 of the NetShelter Aisle Containment System user manual — SMOKE DETECTOR/AUXILLARY
118ページ · クリックして拡大
118ページ

If an external smoke detector is being used:

1. Strip the field-supplied wire to be used to connect to the building smoke detector. Leave a minimum of 15 mm of exposed wire.
2. Insert the wire into the open end of the smoke detector cable. Make sure the button on the connection end is in the open position. NOTE: Field-supplied wire needs to be shielded 20 AWG or network cable that is grounded at the customer end connection point. Maximum routing distance for the wire is 76 m (250 ft.). For best performance, avoid interference from high-voltage cables and devices such as a UPS or PDU.
NetShelter Aisle Containment System — Smoke detector installation diagram (page 118)
図 150 · Smoke detector installation
3. Use pliers to close the button and terminate the wires.
NetShelter Aisle Containment System — Smoke detector installation diagram (page 118)
図 151 · Smoke detector installation
4. Connect the smoke detector cable to the Smoke Sensor connector.
NetShelter Aisle Containment System — Smoke detector installation diagram (page 118)
図 152 · Smoke detector installation

TO NORMALLY CLOSED

CONTACT OF SMOKE

DETECTOR (24 VDC, 200 mA)

SMOKE DETECTOR/AUXILLARY

SENSOR CABLE

Page 119 of the NetShelter Aisle Containment System user manual — Smoke detector installation
119ページ · クリックして拡大
119ページ

Neatly bundle all cabling using tie wraps and cable holders.

NetShelter Aisle Containment System — Smoke detector installation diagram (page 119)
図 153 · Smoke detector installation
Page 120 of the NetShelter Aisle Containment System user manual — Troubleshooting diagram
120ページ · クリックして拡大
120ページ

Ceiling Panel Dropout System Setup and Operation

Maintenance steps for dropout ceiling system

1. Lock hinge flaps using mechanical locks.
2. Turn OFF or remove power to the electromechanical locks.
3. Perform necessary maintenance.
4. Turn ON or provide power to the electromechanical locks.
5. Push each hinge flap upwards so that the lower half of the electromechanical lock engages with the upper half. A clicking sound will be heard when fully engaged.
6. Unlock the mechanical lock on hinge flaps.

Troubleshooting diagram

Turn On Power Supply

Control Box is inoperable Replace Control

Control Box is inoperable

Pull Out Short Circuit from Smoke

Detection On Control Box

Alarm and/or Control Box

EM Lock Drop Out?

Control Box is inoperable

Show 39 more labels / short text on this page
Check Power · Supply · No · Control Box · LED On? · No Yes · Power Supply · Type? · Box · Yes · EM Lock · No Yes · Wire harness · Yes Replace Control · Check EM Lock · Work? · Spacer · Box · Yes · No · No · Add or adjust · Check Wire harness · Spacer · Connector · Alarm Work? · Wire harness Connection? · are inoperable · No Yes · Replace Alarm and/or · Control Box · No · Yes · Wire harness Connector · Wait 10S · No · Yes · Finish · Replace Control Box
Page 121 of the NetShelter Aisle Containment System user manual — Exclusions
121ページ · クリックして拡大
121ページ

Five-Year Factory Warranty

The limited warranty provided by APC by Schneider Electric in this Statement of Limited Factory Warranty applies only to products you purchase for your commercial or industrial use in the ordinary course of your business.

Terms of warranty

APC by Schneider Electric warrants its products to be free from defects in materials and workmanship for a

period of five years from the date of purchase. The obligation of APC by Schneider Electric under this warranty is limited to repairing or replacing, at its sole discretion, any such defective products. This warranty does not apply to equipment that has been damaged by accident, negligence, or misapplication or has been altered or modified in any way. Repair or replacement of a defective product or part thereof does not extend the original warranty period. Any parts furnished under this warranty may be new or factory- remanufactured.

Non-transferable warranty

This warranty extends only to the original purchaser who must have properly registered the product. The product may be registered at the APC by Schneider Electric website, www.apc.com.

Exclusions

APC by Schneider Electric shall not be liable under the warranty if its testing and examination disclose that the

alleged defect in the product does not exist or was caused by end user’s or any third person’s misuse, negligence, improper installation or testing. Further, APC by Schneider Electric shall not be liable under the warranty for unauthorized attempts to repair or modify wrong or inadequate electrical voltage or connection, inappropriate on-site operation conditions, corrosive atmosphere, repair, installation, start-up by non-APC by Schneider Electric designated personnel, a change in location or operating use, exposure to the elements, Acts of God, fire, theft, or installation contrary to APC by Schneider Electric recommendations or specifications or in any event if the APC by Schneider Electric serial number has been altered, defaced, or removed, or any other cause beyond the range of the intended use.

THERE ARE NO WARRANTIES, EXPRESS OR IMPLIED, BY OPERATION OF LAW OR OTHERWISE, OF PRODUCTS SOLD, SERVICED OR FURNISHED UNDER THIS AGREEMENT OR IN CONNECTION HEREWITH. APC BY SCHNEIDER ELECTRIC DISCLAIMS ALL IMPLIED WARRANTIES OF MERCHANTABILITY, SATISFACTION AND FITNESS FOR A PARTICULAR PURPOSE. APC BY SCHNEIDER ELECTRIC EXPRESS WARRANTIES WILL NOT BE ENLARGED, DIMINISHED, OR AFFECTED BY AND NO OBLIGATION OR LIABILITY WILL ARISE OUT OF, APC BY SCHNEIDER ELECTRIC RENDERING OF TECHNICAL OR OTHER ADVICE OR SERVICE IN CONNECTION WITH THE PRODUCTS. THE FOREGOING WARRANTIES AND REMEDIES ARE EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES AND REMEDIES. THE WARRANTIES SET FORTH ABOVE CONSTITUTE APC BY SCHNEIDER ELECTRIC’S SOLE LIABILITY AND PURCHASER'S EXCLUSIVE REMEDY FOR ANY BREACH OF SUCH WARRANTIES. APC BY SCHNEIDER ELECTRIC WARRANTIES EXTEND ONLY TO PURCHASER AND ARE NOT EXTENDED TO ANY THIRD PARTIES.

IN NO EVENT SHALL APC BY SCHNEIDER ELECTRIC, ITS OFFICERS, DIRECTORS, AFFILIATES OR EMPLOYEES BE LIABLE FOR ANY FORM OF INDIRECT, SPECIAL, CONSEQUENTIAL OR PUNITIVE DAMAGES, ARISING OUT OF THE USE, SERVICE OR INSTALLATION, OF THE PRODUCTS, WHETHER SUCH DAMAGES ARISE IN CONTRACT OR TORT, IRRESPECTIVE OF FAULT, NEGLIGENCE OR STRICT LIABILITY OR WHETHER APC BY SCHNEIDER ELECTRIC HAS BEEN ADVISED IN ADVANCE OF THE POSSIBLY OF SUCH DAMAGES. SPECIFICALLY, APC BY SCHNEIDER ELECTRIC IS NOT LIABLE FOR ANY COSTS, SUCH AS LOST PROFITS OR REVENUE, LOSS OF EQUIPMENT, LOSS OF USE OF EQUIPMENT, LOSS OF SOFTWARE, LOSS OF DATA, COSTS OF SUBSTITUENTS, CLAIMS BY THIRD PARTIES, OR OTHERWISE.

Page 122 of the NetShelter Aisle Containment System user manual — Warranty claims
122ページ · クリックして拡大
122ページ

NO SALESMAN, EMPLOYEE OR AGENT OF APC BY SCHNEIDER ELECTRIC IS AUTHORIZED TO ADD TO OR VARY THE TERMS OF THIS WARRANTY. WARRANTY TERMS MAY BE MODIFIED, IF AT ALL, ONLY IN WRITING SIGNED BY AN APC BY SCHNEIDER ELECTRIC OFFICER AND LEGAL DEPARTMENT.

Warranty claims

Customers with warranty claims issues may access the APC by Schneider Electric customer support network through the Support page of the APC by Schneider Electric website, www.apc.com/support. Select your country from the country selection pull-down menu at the top of the Web page. Select the Support tab to obtain contact information for customer support in your region.

Page 123 of the NetShelter Aisle Containment System user manual — Warranty claims
123ページ · クリックして拡大
123ページ
Page 123 of the NetShelter Aisle Containment System user manual — Warranty claims
Page 124 of the NetShelter Aisle Containment System user manual — 5/2020 990-5222D-001
124ページ · クリックして拡大
124ページ

Worldwide Customer Support

Customer support for this product is available at www.apc.com.

As standards, specifications, and designs change from time to time, please ask for confirmation of the information given in this publication. © 2020 APC by Schneider Electric. All Rights Reserved. APC, the APC logo, NetShelter, and InRow are trademarks owned by Schneider Electric S.E. or its subsidiaries. All other trademarks may be property of their respective owners.

5/2020 990-5222D-001

NetShelter Aisle Containment Systemについて質問する

ユーザーまたはスタッフが通常1日以内に回答します。あなたの質問が次の人の助けにもなります。

Add your email to get notified when it’s answered — no spam, ever.

0 questions
NetShelter Aisle Containment Systemに関する質問はまだありません

最初の質問を投稿しましょう。他のユーザーや当チームが回答します。

原本

NetShelter Aisle Containment System 取扱説明書(PDF)

124 ページ·13.8 MB·アクセサリー·PDF
上のページをクリックするとここに表示されます
ページ 1 / …
100%
ページを読み込み中…