Bryantメーカー355M-40-4の使用説明書/サービス説明書
ページ先へ移動 of 44
NOTE: Read the entire instruction manual before starting the installation. This symbol → indicates a change since the last issue. Index Page DIMENSIONAL DRAWING ........................................................2 SAFETY CONSIDERATIONS ........
Fig. 2—Dimensional Drawing DIMENSIONS (IN.) UNIT SIZE A D E 042040* 24-1/2* 22-7/8* 23* 042060 17-1/2 15-7/8 16 042080 21 19-3/8 19-1/2 060080 21 19-3/8 19-1/2 060100 21 19-3/8 19-1/2 060120 24-1/2 22-7/8 23 * These dimensions reflect the wider casing for the Trophy (96.
SAFETY CONSIDERATIONS Installing and servicing heating equipment can be hazardous due to gas and electrical components. Only trained and qualified person- nel should install, repair, or service heating equipment. Untrained personnel can perform basic maintenance functions such as clean- ing and replacing air filters.
recharges your body with static electricity (for example; DO NOT move or shuffle your feet, DO NOT touch un- grounded objects, etc.). 4. If you touch ungrounded objects (recharge your body with static electricity), firmly touch furnace again before touch- ing control or wires.
and also by a color label on each tube. These tubes are identified as follows: collector box drain tube (blue label), inducer housing drain tube (violet label or molded), relief port tube (green label), and pressure switch tube (pink label).
D. Condensate Trap Tubing (Alternate Upflow Orientation) NOTE: See Fig. 6 or tube routing label on main furnace door to confirm location of these tubes. 1. Collector Box Drain Tube Connect collector box drain tube (blue label) to condensate trap. NOTE: On 17-1/2-in.
NOTE: See Fig. 5 or 6 or tube routing label on main furnace door to check for proper connections. H. Condensate Trap Freeze Protection Refer to Condensate Drain Protection section for recommenda- tions and procedures.
b. Remove and discard UPPER (molded) inducer housing drain tube which was previously connected to conden- sate trap. c. Install cap and clamp on UPPER inducer housing drain connection where molded drain tube was removed.
b. Route extended collector box pressure tube to relief port connection on condensate trap. c. Determine appropriate length, cut, and connect tube. d. Clamp tube to prevent any condensate leakage. C. Condensate Trap Field Drain Attachment Refer to Condensate Drain section for recommendations and procedures.
B. Condensate Trap Tubing NOTE: See Fig. 11 or tube routing label on main furnace door to check for proper connections. 1. Collector Box Drain Tube a. Remove factory-installed plug from LOWER collector box drain tube (blue and white striped label). b.
5. Route this extended tube (pink label) to condensate trap relief port connection. 6. Determine appropriate length, cut, and connect tube. 7. Clamp tube to relief port connection. E. Condensate Trap Freeze Protection Refer to Condensate Drain Protection section for recommenda- tions and procedures.
Provide ample space for servicing and cleaning. Always comply with minimum fire protection clearances shown on unit’s clear- ance to combustibles label. (See Fig. 3.) Locate furnace where available electric power and gas supplies meet specifications on furnace rating plate.
IV. HAZARDOUS LOCATIONS INSTALLATION I. LEVELING LEGS (IF DESIRED) When furnace is used in upflow position with side inlet(s), leveling legs may be desired. (See Fig. 12.) Install field-supplied, corrosion-resistant 5/16-in. machine bolts and nuts. NOTE: The maximum length of bolt should not exceed 1-1/2 in.
TABLE 1—OPENING DIMENSIONS (IN.) FURNACE CASING WIDTH APPLICATION PLENUM OPENING FLOOR OPENING AB C D 17-1/2 Upflow Applications 16 24-1/8 16-5/8 24-3/4 Downflow Applications on Non-Combustible Floo.
III. INSTALLATION IN HORIZONTAL APPLICATIONS These furnaces can be installed horizontally in either horizontal left or right discharge position. In a crawlspace, furnace can either be hung from floor joist or installed on suitable blocks or pad. Furnace can be suspended from each corner by hanger bolts and angle iron supports.
IV. FILTER ARRANGEMENT CAUTION: Never operate unit without a filter or with blower access panel removed. Factory-supplied washable framed filters are shipped in blower compartment. Determine location for filter and relocate filter retaining wire if necessary.
VI. GAS PIPING Gas piping must be installed in accordance with national and local codes. Refer to current edition of NFGC. Canadian installations must be made in accordance with NSCNGPIC and all authorities having jurisdiction. Gas supply line should be a separate line running directly from meter to furnace, if possible.
NOTE: Proper polarity must be maintained for 115-v wiring. If polarity is incorrect, control center fault code indicator light will flash rapidly and furnace will NOT operate. WARNING: The cabinet MUST have an uninterrupted or unbroken ground according to NEC ANSI/NFPA 70-1996 and Canadian Electrical Code CSA C22.
Fig. 24—Wiring Diagram A96276 FRS LS ALS FSE GV RED C M P BLU BRN GRN HI GRN NOTE #3 3 RED WHT WHT PL1 PL7 12 1 0 4 6 12 ORN BRN YEL GRN BLK WHT 3 PL9 HSI 12 1.
NOTE: Use AWG No. 18 color-coded copper thermostat wire for lengths up to 100 ft. For wire lengths over 100 ft, use AWG No. 16 wire. NOTE: For 2-speed applications, refer to Sequence of Operation section. III. ACCESSORIES 1. Electronic Air Cleaner (EAC) The control center EAC terminals are energized with 115v (1.
(5.) Insert EAC stripped leads into control center EAC terminals by depressing terminal’s arm with a screwdriver or finger. (See Fig. 26.) (6.) Reinstall control box to furnace blower shelf using 2 screws removed earlier. 2. Humidifier (HUM) Screw terminals (HUM and C OM ) are provided for 24-v humidifier connection.
CAUTION: Combustion air must not be taken from inside structure because that air is frequently contami- nated by halogens, which include fluorides, chlorides, bromides, and iodides. These elements are found in aerosols, detergents, bleaches, cleaning solvents, salts, air fresheners, adhesives, paint, and other household prod- ucts.
EXAMPLE: An 042080 size furnace located in Indianapolis, elevation 650 ft above sea level, could be installed in an application requiring 3 elbows and 17 ft of vent pipe, along with 5 elbows and 16 ft of combustion-air pipe. Table 6 indicates this application would allow a 1-1/2-in.
TABLE 6—MAXIMUM ALLOWABLE PIPE LENGTH (FT) ALTITUDE UNIT SIZE TERMINATION TYPE PIPE DIAMETER (IN.)* NUMBER OF 90° ELBOWS 1 23456 0 to 2000 042040 2 Pipe or 2-In. Concentric 1-1/2 50 45 40 35 30 25 2 7 0 7 07 07 07 07 0 042060 2 Pipe or 2-In. Concentric 1-1/2 50 45 40 35 30 25 2 7 0 7 07 07 07 07 0 042080 060080 2 Pipe or 2-In.
TABLE 6—MAXIMUM ALLOWABLE PIPE LENGTH (FT) Continued ALTITUDE UNIT SIZE TERMINATION TYPE PIPE DIAMETER (IN.)* NUMBER OF 90° ELBOWS 1234 5 6 6001 to 7000‡ 042040 2 Pipe or 2-In. Concentric 1-1/2 35 30 25 20 15 10 2 7 07 06 86 7 6 6 6 4 042060 2 Pipe or 2-In.
COMBUSTION-AIR INTAKE HOUSING PLUG FITTING The combustion-air intake plug fitting must be installed in unused combustion-air intake housing. This fitting must be attached by using RTV sealant, or by drilling a 1/8-in. hole in fitting, using hole in intake housing as a guide.
Fig. 34—Sidewall Termination of 12 in. or More A87225 MAINTAIN 12 IN. CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL OR GRADE, WHICHEVER IS GREATER. 90 ° VENT 12 IN. SEPARATION BETWEEN BOTTOM OF COMBUSTION AIR AND BOTTOM OF VENT BRACKET COMBUSTION-AIR 12 ″ MINIMUM OVERHANG OR ROOF Fig.
contaminants, and has less visible vent vapors. (See Fig. 31 or 32.) Sidewall termination may require sealing or shielding of building surfaces with a corrosive resistance material due to corrosive combustion products of vent system.
NOTE: Do not allow insulation or other materials to accumulate inside of pipe assembly when installing it through hole. Roof terminations —Locate assembly through roof to ap- propriate height as shown in Fig. 32. Sidewall terminations —Locate assembly through sidewall with rain shield positioned no more than 1-in.
Fig. 39—Sidewall Termination of 12 in. or Less (Dimension "A" is Touching or 2-In. Maximum Separation) A96129 A COMBUSTION AIR COMBUSTION AIR VENT Fig. 37—Concentric Vent and Combustion-Air Roof Termination (Dimension "A" is Touching or 2-In.
SEQUENCE OF OPERATION CAUTION: Furnace control must be grounded for proper operation, or control will lock out. Control is grounded through green wire routed to gas valve and burner box screw. Using schematic diagram (see Fig. 24), follow sequence of operation through different modes.
The blower reduces its speed to low-heat RPM. The blower and EAC remain operating 90, 135, 180, or 225 sec (depending on blower off time selection). The furnace is factory set for a 90-sec blower off delay. 10. Post purge —The inducer continues operating for 15 sec after gas valve is de-energized.
2. Humidifier —The HUM terminal is energized after inducer prepurge period is completed. 3. Ignitor warm up —After prepurge period, HSI is energized for 17 sec. 4. Ignition sequence —After HSI warm-up period is com- pleted, the gas valve is energized, permitting gas flow to the burners where it is ignited.
VIII. COMPONENT TEST All components are functionally operated except gas valve with component test feature. This feature helps diagnose a system problem in case of a component failure. NOTE: Setup switch SW-1 MUST be in OFF position or Fault Code 22 (setup error) will occur.
1. Remove main furnace door and blower access panel. 2. Locate CF setup switches on control center. (See Fig. 25.) 3. Determine desired continuous fan airflow. 4. Use Table 9 or wiring schematic to determine proper setup position of CF switches. (See Fig.
TABLE 10—SETUP SWITCH DESCRIPTION SETUP SWITCH NO. NORMAL POSITION DESCRIPTION OF USE SW-1 (FLT) OFF Turn switch to ON for fault history display. No thermostat signal can be present for fault history display. SW-2 (LOW) OFF Turn switch to ON to lock furnace in low-heat mode only.
IV. PURGE GAS LINES If not previously done, purge the lines after all connections have been made and check for leaks. WARNING: Never purge a gas line into a combustion chamber. Never use matches, candles, flame, or other sources of ignition for the purpose of checking leakage.
TABLE 12—MODEL 355MAV ORIFICE SIZE AND MANIFOLD PRESSURE FOR CORRECT INPUT (TABULATED DATA BASED ON 20,000 BTUH HIGH HEAT/13,000 BTUH LOW HEAT PER BURNER DERATED 2% FOR EACH 1000 FT ABOVE SEA LEVEL) ALTITUDE RANGE (FT) AVG GAS HEAT VALUE AT ALTITUDE (BTU/CU FT) SPECIFIC GRAVITY OF NATURAL GAS 0.
TABLE 12—MODEL 355MAV ORIFICE SIZE AND MANIFOLD PRESSURE FOR CORRECT INPUT Continued (TABULATED DATA BASED ON 20,000 BTUH HIGH HEAT/13,000 BTUH LOW HEAT PER BURNER DERATED 2% FOR EACH 1000 FT ABOVE SEA LEVEL) ALTITUDE RANGE (FT) AVG GAS HEAT VALUE AT ALTITUDE (BTU/CU FT) SPECIFIC GRAVITY OF NATURAL GAS 0.
TABLE 12—MODEL 355MAV ORIFICE SIZE AND MANIFOLD PRESSURE FOR CORRECT INPUT Continued (TABULATED DATA BASED ON 20,000 BTUH HIGH HEAT/13,000 BTUH LOW HEAT PER BURNER DERATED 2% FOR EACH 1000 FT ABOVE SEA LEVEL) ALTITUDE RANGE (FT) AVG GAS HEAT VALUE AT ALTITUDE (BTU/CU FT) SPECIFIC GRAVITY OF NATURAL GAS 0.
At altitudes above 2000 ft, this furnace has been ap- proved for a 2 percent derate for each 1000 ft above sea level. See Table 13 for derate multiplier factor and example. EXAMPLE: 100,000 Btuh input furnace installed at 4300 ft. Furnace Input Rate at Sea Level X Derate Multiplier Factor = Furnace Input Rate at Installation Altitude 100,000 X 0.
B. Set Temperature Rise CAUTION: Temperature rise must be within limits specified on unit rating plate. Recommended operation is at midpoint of rise or above. Failure to follow this caution may result in condensing or overheating the heat ex- changers.
II. CHECK PRESSURE SWITCHES This control proves operation of the draft inducer. Check switch operation as follows: 1. Turn off 115-v power to furnace. 2. Remove control access door and disconnect inducer motor 12-pin wire harness at inducer motor. 3. Turn on 115-v power to furnace.
CHECKLIST—INSTALLATION LOAD CALCULATION ____________ Heating Load (Btuh) ____________ Cooling Load (Btuh) ____________ Furnace Model Selection COMBUSTION AND VENT PIPING Termination Location _______.
デバイスBryant 355M-40-4の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Bryant 355M-40-4をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはBryant 355M-40-4の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Bryant 355M-40-4の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Bryant 355M-40-4で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Bryant 355M-40-4を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はBryant 355M-40-4の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Bryant 355M-40-4に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちBryant 355M-40-4デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。