Installation Instructions Absorption liquid chiller/heaters provide safe and reliable service when operated within design specifications. When operating this equipment, use good judgment and safety pre- cautions to avoid damage to equipment and property or in- jury to personnel.
CONTENTS Page SAFETY CONSIDERA TIONS ........ ........ 1 INTRODUCTION ............. ............. 2 General ................. ................. 2 Job Data .................................. 2 RECEIVING THE MACHINE AND BURNER .. 2 Identify Machine and Burner .
RIGGING AND POSITIONING Rigging procedures vary depending on whether the ma- chine is shipped in one or 2 pieces. Lifting machine from points other than those specified may result in serious damage and personal injury. Rig- ging equipment and procedure must be adequate for machine weights and sizes.
Fig. 2 — 16DF Views (T ypical) V — Lifting Holes Fig. 3 — Rigging One-Piece Units, T ypical, T op V iew 4.
T able 1 — Rigging W eights English UNIT 16DF SHIPPING WEIGHT (lb) OPERA TING WEIGHT (lb) Absorber- Evaporator Low-T emperature Generator Assembly High- T emperature Generator- Separator Assembly T .
T able 2 — Overall Dimensions, 16DF013-025 English UNIT 16DF OVERALL DIMENSIONS (ft-in.) 013 015 018 020 023 025 LENGTH 1 1-10 1 1-10 1 1-10 1 1-10 1 1-10 1 1-10 WIDTH 6- 7 6- 7 7- 8 7- 8 8- 3 8- 3 .
MACHINE ASSEMBL Y No assembly is required for one-piece units (16DF013- 020) other than installing the burner . See Mounting the Burner section. Assemble 2-Piece Units (Fig. 8 and 9) 1. W eld piping connections and make sure weld connec- tions are vacuum leak tight.
4. Close auxiliary evacuation valve and shut of f auxiliary evacuation device. 5. Note and record absolute pressure gage reading. 6. Coat all machine field-welded joints with weld sealant. MOUNTING THE BURNER The burner is shipped and installed as 3 separate sub- assemblies (Fig.
Fuel System Installation — See Fig. 12-14 for typi- cal gas train and oil supply system arrangements. Refer to burner manual supplied with the burner for installation in- structions on the particular version of gas train and/or oil supply system used with your application.
NOTES: 1. Oil system schematic shown in high fire position. 2. Supply pressure must not exceed 3 psi (20 kPa) or pump seals may be dam- aged. Fig. 13 — Mechanical Pressure Atomizing, Light Oil (Pump with External Regulating Relief V alve) NOTES: 1. Oil system schematic shown in high fire position.
4. W ater flow direction must be as specified in job flow dia- grams or water flow markings on water boxes, and con- nections must be to the correct entering and leaving wa- ter box nozzles. 5. Install water box vent and drain piping in accordance with individual job data.
Connect Rupture Disc Piping — V ent rupture disc to the outside of the building for safety . Model 16DF ma- chines sometimes are factory equipped with a rupture disc assembly on the generator-vapor transfer area. 1. Add a flexible connection and adequate support to pipe, as required, to eliminate any piping stress on rupture disc.
デバイスCarrier 16DF013-050の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Carrier 16DF013-050をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはCarrier 16DF013-050の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Carrier 16DF013-050の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Carrier 16DF013-050で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Carrier 16DF013-050を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はCarrier 16DF013-050の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Carrier 16DF013-050に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちCarrier 16DF013-050デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。