Installation, Start-Up and Service Instructions CONTENTS Page SAFETY CONSIDERA TIONS .................. 1 INST ALLA TION ............................ 1-16 Step 1 — Provide Unit Support .............. 1 • ROOF CURB • SLAB MOUNT Step 2 — Field Fabricate Ductwork .
ROOF CURB ACCESSOR Y ‘ ‘A ’ ’ UNIT SIZE 50DJ901371 1 8 -2 9 50LJQ008,012 [356] 50DJ901381 2 8 -0 9 [610] UNIT SIZE ‘ ‘F’ ’ POWER ‘ ‘G’ ’ CONTROL CONNECTOR PKG. ACC. 50LJQ008,012 1 9 [25] NPT or 2 9 [51] NPT 3 ⁄ 4 9 [19] NPT 50DJ90131 1 NOTES: 1.
Step 3 — Make Field Connection for Conden- sate Disposal — Units must have an external trap added. See Fig. 3. A 3 ⁄ 4 -in. FPT connection is located on the side of the unit. Use a trap at least 100 mm (4 in.) deep, and protect against freeze-up.
T able 1A — Physical Data (SI) BASE UNIT 50LJQ 008 012 NOMINAL CAP ACITY (kW) 23.2 28.8 OPERA TING WEIGHT (kg) Unit 381 426 With Economizer 401 446 Roof Curb 101 101 COMPRESSOR Hermetic Quantity 22 Oil (ml) (each compressor) 1627 2071 REFRIGERANT TYPE R-22 Operating Charge (kg) Circuit 1 3.
T able 1B — Physical Data (English) BASE UNIT 50QJ 008 012 NOMINAL CAP ACITY (tons) 6.6 8.2 OPERA TING WEIGHT (lb) Unit 840 940 With Economizer 884 984 Roof Curb 223 223 COMPRESSOR Hermetic Quantity.
UNIT 50LJQ STD. UNIT WEIGHT ECONOMIZER WEIGHT CORNER WEIGHT ‘ ‘A ’ ’ CORNER WEIGHT ‘ ‘B’ ’ CORNER WEIGHT ‘ ‘C’ ’ CORNER WEIGHT ‘ ‘D’ ’ ‘ ‘H’ ’ ‘‘J’ ’ ‘ ‘K’ ’ Lb Kg Lb Kg Lb Kg Lb Kg Lb Kg Lb Kg Ft-in.
Step 5 — Make Electrical Connections Unit cabinet must have uninterrupted, unbroken elec- trical ground to minimize the possibility of personal injury if an electrical fault should occur.
Fig. 8 — Electric Heater Power Wiring Connections — 50LJQ, 400-3-50; Single Point Kit 50DJ902041 and 50DJ902101 Fig. 9 — Electric Heater Power Wiring Connections — 50LJQ, 400-3-50; Single Poin.
Fig. 10 — Electric Heater Power Wiring Connections — 50LJQ, 220-3-50; Single Point Kit 50DJ902031 and 50DJ902081 Fig. 1 1 — Electric Heater Wiring Connections — 50LJQ, 220-3-50; Single Point Kit 50DJ902051 and 50DJ9021 1 1 LEGEND FOR FIG.
Fig. 12 — Electric Heater Power Wiring Connections — 50LJQ, 220-3-50; Single Point Kit 50DJ902091 Fig. 13 — Electric Heater Power Wiring Connections — 50LJQ, 220-3-50; Single Point Kit 50DJ902131 LEGEND FOR FIG.
T able 2 — Electrical Data UNIT 50LJQ NOMINAL V -PH-HZ VOL T AGE RANGE COMPR (each) OFM IFM ELECTRIC HEA T POWER SUPPL Y ELECTRIC HEA T POWER WIRING FIG. NO. ELECTRIC HEA T P ART NO. 50DJ901— Min Max RLA LRA FLA Hp FLA Nominal kW* FLA MCA MOCP† 008 220-3-50 198 242 15.
FIELD CONTROL WIRING — Install a Carrier-approved accessory thermostat assembly according to installation in- structions included with the accessory . Locate thermostat as- sembly on a solid wall in the conditioned space to sense av- erage temperature in accordance with thermostat installation instructions.
Step 6 — Adjust Indoor-Fan Speed — Adjust in- door fan speed to meet jobsite conditions. For units with electric resistance heating, required mini- mum L/s (cfm) is 1062 (2250) for 50LJQ008 and 1416 (3000) or 50LJQ012, with the following exceptions.
MOTOR MOUNTING NUTS AND BOLTS Fig. 18 — Belt-Drive Motor Mounting T able 5A — Fan R/s at Motor Pulley Settings (SI) 50LJQ MOTOR PULLEY TURNS OPEN 0 1 ⁄ 2 11 1 ⁄ 2 22 1 ⁄ 2 33 1 ⁄ 2 44 1 ⁄ 2 5 008 14.70 14.26 13.82 13.38 12.94 12.50 12.06 1 1.
T able 6 — Fan Performance (SI), 50LJQ008 (50 Hz) — Horizontal Discharge Units AIRFLOW (L/s) EXTERNAL ST A TIC PRESSURE (Pa) 50 100 150 200 250 300 350 400 450 500 r/s BkW r/s BkW r/s BkW r/s BkW r/s BkW r/s BkW r/s BkW r/s BkW r/s BkW r/s BkW 1 100 7.
T able 10 — Fan Performance (English), 50LJQ008 (50 Hz) — Horizontal Discharge Units AIRFLOW (Cfm) EXTERNAL ST A TIC PRESSURE (in. wg) 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 Rpm Bhp Rpm Bhp Rpm Bhp Rpm Bhp Rpm Bhp Rpm Bhp Rpm Bhp Rpm Bhp Rpm Bhp Rpm Bhp 2200 459 0.
ST ART -UP IMPOR T ANT : Ener gize crankcase heaters 24 hours prior to base unit start-up to remove entrapped refrigerant from the oil. Heaters are energized as long as there is power to the unit. Unit Preparation — Make sure that unit has been in- stalled in accordance with these installation instructions and applicable codes.
NOTES: 1. In heating mode, economizer damper blade will move to the mini- mum position, and unit will operate as described for units without economizer , regardless of outdoor air temperature. 2. The temperatures given in the graph are for demonstration pur- poses only and may vary depending on which thermostat is used.
position of the reversing valves and shuts of f the outdoor fan. The electric heaters (if installed) will be ener gized. On units with economizer , the economizer damper blade will move to the fully closed position.
CONDENSA TE DRAIN — Check and clean each year at start of cooling season. In winter , keep drain dry or protect against freeze-up. FIL TERS — Clean or replace at start of each heating and cooling season, or more often if operating conditions require it.
Fig. 25 — Cooling Charging Charts, 50LJQ008 Fig. 26 — Cooling Charging Charts, 50LJQ012 21.
.
.
Copyright 1992 Carrier Corporation Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
デバイスCarrier 50LJQ008の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Carrier 50LJQ008をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはCarrier 50LJQ008の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Carrier 50LJQ008の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Carrier 50LJQ008で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Carrier 50LJQ008を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はCarrier 50LJQ008の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Carrier 50LJQ008に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちCarrier 50LJQ008デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。