New Buck Corporationメーカー80ZCの使用説明書/サービス説明書
ページ先へ移動 of 18
The following manual is for the 80ZC cabinet ONLY. If you require information on the Model 80 unit that fits inside this cabinet, please download the Model 80 manual from the “Stove Manuals” section of our website.
MODEL 80 ZC CABINET INSTALLATION FEATURES: INSTALLATION: MAINTENANCE: PREPARATION: OPERATION: SAFETY: NEW BUCK CORPORATION 1992 NARNOCK HERSEY.
IMPORTANT I The Top Panel (#1 ) And Side-Panels (#2) Must Be Installed _On Cabinet Before Setting The Cabinet For Framing. tf. FRONT o S IDE PANEL ~ INSLlAT ION LAYERS ~ I I 0 TOP PANEL - ~ INSllATION.
CAUTION - Refer to chimney manufacturers instructions for assembly and disassembly of chimney parts. Be sure to follow chimney instructions for proper clearances to combusti- bles and proper air spacing required. -',- Chlmnoy Cap -1- ~pp<OvO<l ch .
CAUTION: Do not mix Ch imney P arts as a fire. may re su 1 t. Use one model of listed chimney parts completely for·an instal~ation. CAUTION: Read through all of these instructions carefully.
INSTALLATION PRECAUTIONS The following precautions are mandatory for a safe installation: A. Compliance with local building codes and regulations is mandatory. B. Be careful not to damage unit in handling and unpacking component parts and accessories.
A. Straight up through ceiling: (See Figures 1 and 2). This is a simple installation normally used when installing a Hodel ZC-80 inside an existing room, and in iome cases, in new construction. Refer to Figure 3 if an offset to clear an obstruction is needed.
FRAMING CONSTRUCTION Except as noted, the Hodel ZC-80 can be installed almost anywhere you desire. There are, however, a few clearance and framing restrictions that must be followed. See figures 1 and 2 to make sure that these clearance restrictions are met.
Framing must be accomplished after the Model ZC-80 is set in place. The chimney can be installed after framing, but installa- tion is considerably more difficult and, in some cases, impossi- ble. Therefore, it is recommended that the chimney be installed prior to framing when a choice exists.
2. Set Hodel ZC-80 unit in place and attach safety shield to unit as shown in Figure i-A and i-B. You must place a noncom- bustible material 3/4" thick millboard or equivalent K Factor =.084/BTU/F 2 H0F inches minimum. 3. Frame the ZC Cabinet usng 2"x 4" studs or local building code framing.
NOTE: Finished wall must be 2" in front of face of Z.C. Cabinet (without hood panell. Singi. H •• der A Single Header must be used as part of front Iraming, vertical 2" .... ·s must be turned flat. WARNING! Install the hearth protector only as specified.
CAUTION! Refer to chimney manufacturers instructions for assembly and disassembly of chimney parts. Be sure to follow chimney instructions for proper clearances to combusti- bles and proper air spacing required. ffi--- Chimney Cap 0--.--1- Storm Collar ---:f-- Roof Flashing -+ Chimney Pipe ,.
Install pipe to cabinet by pushing down over the ~tarter section of pipe on the ZC Cabinet. NOTE: To ease installation of the first section of pipe to the Cabinet use a pipe crimping tool and crimp the bottom of the inside chimney liner. Install pipe to cabinet by pushing down over the starter section of pipe on the ZC Cabinet.
INSTALLING FIRESTOP RADIATION SHIELD: Nail the firestop Radia- tion Shield to' the bottom of the framed ceiling opening using at least two 8-penny nails per side.
Electrical procedures: The ZC-80 Cabinet is not pre-wired; an electrician must wire the Cabinet into the home wiring. system using No. 14 AWG (with ground wiring) as minimum in accordance with local wiring codes. (See Figure 9) 1. Remove receptacle cover.
FINISHING Finishing can now be completed using the desired material in accordance with local building and fire codes. CAUTION: Do not cover any opening on the Cabinet; heat must be allowed to escape from the openings designed into the unit. A grilled trim panel is provided with the trim package to cover this area.
INSTALLING THE MODEL 80 BUCK STOVE Install unit as follows: A. Carefully reinspect chimney connections, vent outputs and cabinet air intakes after finishing is completed. B. Thoroughly clean all masonry mud and debris from cabinet and surrounding environment.
H. Install the trim kit attaching it to the Cabinet or finished framing by using 1" screws to secure the trim panels in place. I. Remove cover plate from Cabinet exposing receptacle. Roll up pOHer cord so it will fit inside of cover box. Plug in pOHer cord in receptacle.
デバイスNew Buck Corporation 80ZCの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
New Buck Corporation 80ZCをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはNew Buck Corporation 80ZCの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。New Buck Corporation 80ZCの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。New Buck Corporation 80ZCで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
New Buck Corporation 80ZCを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はNew Buck Corporation 80ZCの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、New Buck Corporation 80ZCに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちNew Buck Corporation 80ZCデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。