Nortec IndustriesメーカーMES-Uの使用説明書/サービス説明書
ページ先へ移動 of 14
MES-U Electrode Steam Humidifiers Installation, Operation, Maintenance, Spare Parts, and Exploded Views Guide IMPORTANT: Read and save this guide for future reference.
Table of Contents INSTALLATION 1 – RECEIVING EQUIPMENT ..............................1 – PRINCIPAL OF OPERATION ............................1 – WATER SUPPLY AND PLUMBING ..........................2 – WATER CONNECTION ..........................
INSTALLATION RECEIVING EQUIPMENT 1. Check packing slip to ensure ALL material has been received. 2. Inspect box for damage and note on shipping waybill accordingly. 3. After unpacking, inspect unit for damage and if damage is found, advise shipper as soon as possible.
WATER SUPPLY AND PLUMBING 1. The orifice in the fill valve is sized for an extended water pressure range of 30 to 85 psi. 2. For water pressure between 15 and 30 psi, notify the factory and the next larger size fill valve will be supplied. 3. For cases below 15 psi, notify the factory and a fill valve with an oversized orifice will be supplied.
out and the fill solenoid will again open until the cylinder is again full. This cycling of the red light and fill valve will continue until the unit’s full output capacity is reached after which the water level will automatically lower itself in the cylinder.
2. The old cylinder must be drained completely before removing. This is done by pushing the auto on/off/drain switch to the “ drain ” position. 3. When completely drained, push the auto on/off/drain switch to the “ off ” position. 4. Open the main disconnect during the entire cylinder change operation.
is normally caused by short cycling, a restricted drain, or back pressure. The foam, generated in these instances, is conductive and may lead to false full cylinder indication if the level of the foam approaches the top of the cylinder.
Red “Change Cylinder” light on - Water NOT at top of cylinder: Water foaming to top of cylinder causing false full cylinder indication. This also may be accompanied by arcing (flashing) inside cylinder. Refer to “ Terms Used ” regarding foaming.
-7- MES -U/MES-P HUMIDIFIER PHYSICAL DA T A MESU DIM 10/19/98 WEIGHTS (DR Y) DIMENSIONS NOTES: 1. FOR H EIGHT OF 5 LB P VC USE HEIGHT OF 10 LB MODEL. 2. PVC = PRIMARY VOL T AGE CONNECTION. 3. MODEL SHOWN: 163-91X5 (CONFIGURA TION #5) WITH CP (CLOSED PLUMBING) COVER REMOVED.
-8- MES-U INTERNAL AND FIELD WIRING WIRING DIAGRAM number 150-6240 REV . B (For PVC or L VC unit with remote or attached electrical) STEAM CYLINDER NOTE: SOLID LINES WIRING BY OTHERS HIGH VOL TA GE EL.
.
.
LIMITED WARRANTY NORTEC INDUSTRIES INCORPORATED and/or NORTEC AIR CONDITIONING INDUSTRIES LIMITED (hereinafter collectively referred to as THE COMPANY), warrant for a period of two years from date of .
Model # :_________________________ Serial # :_________________________ Cylinder # :_______________________ Cylinder Last Replaced: _________________________ MTH/DAY/YR _________________________ MTH/DAY/YR _________________________ MTH/DAY/YR NORTEC INDUSTRIES INC.
デバイスNortec Industries MES-Uの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Nortec Industries MES-Uをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはNortec Industries MES-Uの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Nortec Industries MES-Uの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Nortec Industries MES-Uで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Nortec Industries MES-Uを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はNortec Industries MES-Uの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Nortec Industries MES-Uに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちNortec Industries MES-Uデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。