StovaxメーカーCeramica Manhattan Wood Stoveの使用説明書/サービス説明書
ページ先へ移動 of 27
C e r a m i c a M a n h a t t a n B al a nc e d F lu e With upgradeable control valve I ns t r uc t io n s f or Us e , I ns t a ll a ti o n a nd Se r v ic i ng Fo r use in GB , IE (G rea t Bri ta in and Ei re ) PR0848 Issue 2 (February 2007) I M P O R T A N T Do not attempt to burn rubbish in this fire.
2 CONTENTS COVERING THE FOLLOWING MODELS CEREMICA MANHATTAN - 8537 A/B/C LUC & P8537 A/B/C LUC PAGE APPLIANCE COMMISIONING CHECKLIST 3 USER INSTRUCTIONS 4 INSTALLATION INSTRUCTIONS 8 Technical Spe.
3 FLUE CHECK PASS FAIL 1. Flue is correct for appliance 2. Flue flow test N/A 3. Spillage test N/A GAS CHECK 1. Gas soundness & let by test 2. Standing pressure test mb 3. Appliance working pressure (on High Setting) mb NB All other gas appliances must be operating on full MTM fires only.
2.4 Ensure that the right hand control knob is pointing to off ( ). 2.5 Press in the right hand control knob and rotate it anticlockwise until a click is heard (keep pressing in) and the knob is pointing to pilot ( ). The pilot should now light. If the pilot has not lit, repeat the procedure until it does.
7.2 Place log B on the left hand side of the burner with the location bar on the underside of the log fully located in the long slot of the burner. Make sure the log is as far to the left as possible.
6 7.4 Place log D across from the rear log A to log B on the left- hand side. There are cut-outs in both logs for location. See diagram 5. 7.5 There are two ash panels which lay across the front of the burner skin. Place the panel with the flat edge facing the left side of the firebox.
7 INSTALLATION INSTRUCTIONS TECHNICAL SPECIFICATION COVERING THE FOLLOWING MODELS: CERAMICA MANHATTAN - 8537LUC & P8537LUC Model Gas Gas Working Aeration Injector Gas Rate Input kW (Gross) Country CAT. Type Pressure m 3 /h High Low 8537LUC I 2H Natural 20 mbar Ø 1 x 14.
8 INSTALLATION INSTRUCTIONS SITE REQUIREMENTS 1. FLUE AND CHIMNEY REQUIREMENTS NOTE: This appliance can only be installed in conjunction with the flue supplied. 1.1 The flue must be sited in accordance with BS5440: Part 1 (latest editon). See diagram 1.
9 1.2 REAR FLUE 8526 Terminal dimensions: 395 x 200 x 200 mm (H x W x D) Cut to length as required on site. Guard Supplied. 1.3 TOP EXIT Two types of top exit flue terminal are available, horizontal and vertical.
10 1.5 TOP FLUE UP & OUT WITH ADDITIONAL BEND Any additional bend may be used on the horizontal section (either 45° or 90°) but the overall horizontal flue run will be reduced. Refer to diagram 4. 1.6 TOP FLUE VERTICAL KIT (8524/8524AN) - ALL APPLIANCES Vertical from the top of the appliance.
4.4 The above dimensions provide adequate clearance at the side and rear of the fire so that the controls can be reached. 5. TIMBER FRAMED BUILDINGS 5.1 It will be necessary to provide additional clearance when the fire passes through a wall containing any combustible materials as so to prevent a fire hazard.
12 IMPORTANT: ENSURE THAT THE APPLIANCE IS CORRECTLY ADJUSTED FOR THE GAS TYPE AND CATEGORY APPLICABLE IN THE COUNTRY OF USE. REFER TO DATABADGE AND TECHNICAL SPECIFICATIONS OF THIS BOOKLET. FOR DETAILS OF CHANGING BETWEEN GAS TYPES REFER TO SECTION 10, REPLACING PARTS.
13 3.1.5 To set the flue length, measure the total wall thickness, then add 65mm. This total flue length will give the minimum clearance of 50mm between the rear of the stove and the wall. To cut the flue to length using a hacksaw, first insert the square cardboard fitment into the flue.
14 INSTALLATION INSTRUCTIONS INSTALLATION 3.1.7f Remove the cast iron door using the tool provided and carefully place to one side. Gently position the front ceramic panel so that the side panels locate inside the returns on the front panel.
15 INSTALLATION INSTRUCTIONS INSTALLATION 3.2 TOP EXIT 3.2.1 There are two types of top exit flues available, one with a vertical terminal, the other with a horizontal terminal. Minimum and maximum flue lengths are shown in Diagram 3 under Site Requirements, 1.
16 INSTALLATION INSTRUCTIONS INSTALLATION 3.2.6 To determine the length of the terminal flue section measure from the outside of the wall to the stop on the 90° elbow. Horizontal flue sections may fitted between the elbow and the terminal section. See diagram 12.
5. FUELBED ARRANGEMENTS Remove the cast iron door using the tool provided. The main ceramic components are inside the firebox. NOTE: THE CAST IRON DOOR IS HEAVY, TAKE EXTREME CARE WHEN HANDLING TO AVOID DAMAGING THE OUTER CASING. The fuel bed consists of 5 logs and 2 ash panels.
18 INSTALLATION INSTRUCTIONS INSTALLATION 5.4 Place the second ash panel to the right of the first, with the pointed end of the panel fitting into the V shape. This panel should locate on the screw holes of the burner skin. Ensure that both logs are horizontal to the burner ports.
1. COMMISSIONING 1.1 Having run the gas supply to the stove, PURGE THE SUPPLY PIPE, this is essential to expel any debris that may block the gas controls. Connect the gas supply to the 8mm compression elbow at the RH rear corner of the stove, see diagram 1.
20 1. SERVICING REQUIREMENTS This appliance must be serviced at least once a year by a competent person. All tests must be serviced by best practice as described by the current CORGI recommendations.
21 SERVICING INSTRUCTIONS SERVICING / FAULT FINDING CHARTS NO SPARK IGNITION FUNCTIONAL CHECK 2 Ensure there is no debris around the pilot assembly, (e.g. coal, soot etc.) which could short the spark, clear the area. From Ignition Fault Finding Chart Part 1.
22 SERVICING INSTRUCTIONS REPLACING PARTS 1. GENERAL 1.1 All principal components can be replaced without removing the stove from its installation, although it is essential that the gas supply to the appliance is turned off at the isolation device before proceeding further.
23 SERVICING INSTRUCTIONS REPLACING PARTS 3.4 To remove the pilot injector, undo the compression nut on the pilot feed pipe and withdraw the injector which will be hooked onto the olive. When replacing an injector always make sure it is hooked onto the olive before inserting it into the pilot burner.
24 SERVICING INSTRUCTIONS REPLACING PARTS 4.3 To release the right hand side of the control cover insert the narrow blade screwdriver into the slot shown in diagram 9.
25 SERVICING INSTRUCTIONS REPLACING PARTS 8.4 Holding the injector with a spanner, undo the feed pipe. NOTE: THE ORIENTATION OF THE INJECTOR. 8.5 Reassemble in reverse order, turn on the gas supply and check for any leaks. 9. PRIMARY AERATION PLATE 9.
26 SERVICE RECORDS 1ST SERVICE Date of Service:........................................................................... Next Service Due:....................................................................... Signed:................................
Gazco Limited, Osprey Road, Sowton Industrial Estate, Exeter, Devon, England EX2 7JG Tel: (01392) 261999 Fax: (01392) 444148 E-mail: info@gazco.com A member of the Stovax Group.
デバイスStovax Ceramica Manhattan Wood Stoveの購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Stovax Ceramica Manhattan Wood Stoveをまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはStovax Ceramica Manhattan Wood Stoveの技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Stovax Ceramica Manhattan Wood Stoveの取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Stovax Ceramica Manhattan Wood Stoveで得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Stovax Ceramica Manhattan Wood Stoveを既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はStovax Ceramica Manhattan Wood Stoveの不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Stovax Ceramica Manhattan Wood Stoveに関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちStovax Ceramica Manhattan Wood Stoveデバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。