StovaxメーカーPR0919の使用説明書/サービス説明書
ページ先へ移動 of 33
STUDIO B a l a n c e d F l u e Instructions for Use, Installation and Servicing For use in GB, IE (Great Britain and Eire) PR0919 Issue 5 (January 2008) IMPORTANT Do not attempt to burn rubbish in this appliance. This appliance must only be operated with the glass door secured firmly in position.
2 COVERING THE FOLLOWING MODEL: STUDIO 1 BALANCED FLUE: STUDIO 2 BALANCED FLUE: 8700BFCHEC 8701BFCHEC P8700BFCHEC P8701BFCHEC PAGE APPLIANCE COMMISSIONING CHECKLIST 3 USER INSTRUCTIONS 4 INSTALLATION .
3 FLUE CHECK PASS FAIL 1. Flue is correct for appliance 2. Flue flow test N/A 3. Spillage test N/A GAS CHECK 1. Gas soundness & let by test 2. Standing pressure test mb 3. Appliance working pressure (on High Setting) mb NB All other gas appliances must be operating on full 4.
4 USER INSTRUCTIONS 1. GENERAL 1.1 A competent person must carry out installation and servicing. 1.2 In all correspondence, please quote the appliance type and serial number, which can be found on the data badge located on a plate under the access panel, see Diagram 2, Installation.
5 USER INSTRUCTIONS DECREASINGTEMPERATURE • Pressthe DOWNarrow onceto decreaseflame height one stage • Pressand holdthe DOWNar.
6 USER INSTRUCTIONS • Pressthe ON-OFFbutton toturn theappliance off EMERGENCY SHUT OFF If the batteries fail during use of the fire, move the switch to theOFF (O.
7 USER INSTRUCTIONS 5. ARRANGEMENT OF FUEL BED 5.1 If you need to replace pebbles or refill the tray, make sure the pebbles are flattened so they are level with the rim of the tray. TAKE CARE NOT TO SPILL PEBBLES INTO THE PILOT AREA ONLY PEBBLES SUPPLIED BY GAZCO CAN BE USED IN THIS FIRE 6.
8 Model Gas CAT. Gas Type Working Pressure Aeration Injector Gas Rate m 3 /h Input kW (Gross) Country High Low Studio 1 BF 12H Natural G20 20mbar 16 x 23 400 0.600 6.3 3.0 GB, IE Studio 1 BF 13P Propane G31 37mbar 14 x 16 (1) 16 x 23 (1) 185 0.230 6.1 3.
9 INSTALLATION INSTRUCTIONS TECHNICAL SPECIFICATION This appliance has been certified for use in countries other than those stated. To install this appliance in these countries, it is essential to obtain the translated instructions and in some cases the appliance will require modification.
10 INSTALLATION INSTRUCTIONS TECHNICAL SPECIFICATION Steel Frame Dimensions Dimension Studio 1 Studio 2 A 1120 1350 B 675 675 C 646 846 D 320 320 E 177 177 F 237 237 G 25 25 Profil Frame Dimensions Dimension Studio 1 Studio 2 A 836 1036 B 510 510 C 740 940 D 414 414 E 48 48 F 48 48 G 12.
11 INSTALLATION INSTRUCTIONS SITE REQUIREMENTS Note: This appliance must only be installed with the flue supplied. You must adhere to the following: 1.
12 STUDIO 1 BF 1A AR1671 STUDIO 2 BF 1A AR1971 Start of bend to centre line of horizontal flue 170mm. Centre line of vertical flue to end of bend 220mm. 2.1 TOP FLUE UP & OUT KIT STUDIO 1 BF (8534/8534AN) Vertical from the top of the appliance then horizontally out.
13 INSTALLATION INSTRUCTIONS SITE REQUIREMENTS 1C AR1673 2.3 TOP FLUE VERTICAL KIT (8524/8524AN) Vertical from the top of the appliance (See Diagram 1C).
14 INSTALLATION INSTRUCTIONS SITE REQUIREMENTS/INSTALLATION 5. APPLIANCE LOCATION 5.1 Please note this appliance has been specifically designed for stud work applications. There are two methods of installation, see Installation Instructions 3.2 Frame, 3.
15 INSTALLATION INSTRUCTIONS INSTALLATION 2 AR1869 access panel 2 AR1888 3. STUD WORK INSTALLATION 3.1 Combustible parts of the stud work must be kept beyond theminimum dimensions shownin Diagram4.
16 INSTALLATION INSTRUCTIONS INSTALLATION • Fitthesupplied topsupportbar intothe studworkat the correct height, Diagram 7, because no combustible materi.
17 INSTALLATION INSTRUCTIONS INSTALLATION 13 AR1905 3.3 STUD WORK INSTALLATION METHOD 2 (EDGE) Forthis cool-wallEdge installation, theconvected heatof the fire is channelled into the chimney cavity and vented at the top.
18 INSTALLATION INSTRUCTIONS INSTALLATION Studio 1 BF 17 Studio 2 BF Studio 1 & 2 BF AR1671, AR1971, AR1673 TAKE CARE WHEN MARKING OUT FOR THE FLUE AS IT IS DIFFICULT TO MOVE AFTER INSTALLATION. IF A RESTRICTOR IS REQUIRED FIT THIS BETWEEN THE SMALL OUTLET SPIGOT AND THE AIR DUCT SEE DIAGRAM 18.
19 INSTALLATION INSTRUCTIONS INSTALLATION 4.6 Onlythe horizontalterminal section canbe reducedin size. To find the length: • Measurefrom theoutside.
20 INSTALLATION INSTRUCTIONS INSTALLATION • Offerthe frameto thefoot ofthe opening • Slidethe frameto theright tolocate theright hingepin 24 AR1865 5.
21 INSTALLATION INSTRUCTIONS INSTALLATION • Pressthe ON-OFFbutton tolight theappliance, (upto 30 seconds) • Pressthe UPbutton toincrease theflame height. • Pre ssthe DOW Nbutton to decreasethe flameheight.
22 INSTALLATION INSTRUCTIONS COMMISSIONING 7. COMMISSIONING 7.1 Complete the Commissioning Checklist at the front of this manual covering: • Fluechecks • Gaschecks • Pebblelayout -flame picture For working pressure test, use the access panel at the gas connection ensuring the burner is in position.
23 IGNITION FUNCTIONAL CHECK 1 PILOTWILL NOTLIGHT Ensurethere isno debrisaroundthe pilotassembly, (e.g. soot, etc.) which could short the spark, clean the area. Operatethe valve. Is there a spark? Consult User Instructions and retry.
24 PILOTWILL NOTSTAY LITORFIRE GOESOUT INUSE Ensurethere isno debrisaroundthe pilotassembly, (e.g. soot etc.) Check for fluff in the pilot aeration hole. See the Diagram in the Replacing Parts section.
3.2 To completely remove the glass front: • Removethe securingspring clipfrom thebottom-right of the window frame, Diagram 3 3 AR1862 3.
26 SERVICING INSTRUCTIONS REPLACING PARTS 4. GLASS WINDOW 4.1 Remove the two clips and brackets from either side of the frame, Diagram 5 5 AR1864 • Liftthe glassclear fromthe lockbracket atthe topof the frame and slide out 5.
27 9 AR1868 • Slidethe burnerto theright andout ofits location • Refitin reverseorder Whenrefilling the stonepebbles, fillto thelevel ofthe rim of the burner tray and flatten level.
28 SERVICING INSTRUCTIONS REPLACING PARTS 8. PILOT UNIT ASSEMBLY 8.1 The pilot assembly consists of four components which can be individually changed: 1. Pilot burner bracket 2. Pilot injector 3. Electrode 4. Thermocouple Before commencing work on the pilot the Main Control Assembly must be removed, see Section 7 above.
29 SERVICING INSTRUCTIONS REPLACING PARTS 10. GAS VALVE 10.1 To change the gas valve: • Removethe controlassembly, Section7 • Releasethe gasinlet pipe,D.
30 SERVICING INSTRUCTIONS REPLACING PARTS 13. MAIN INJECTOR 13.1 To change the main injector: • Undothe injectorfee pipe • Undothe locknut fromthe injector • Replacewith thecorrect sizeinjector 14.
31 SERVICING INSTRUCTIONS REPLACING PARTS 15. SHORT SPARES LIST STUDIO 1 BF STUDIO 2 BF COMPONENT NG LPG NG LPG PILOTINJECTOR PI0069 PI0070 PI0069 PI0070 MAININJECTOR IN0007 IN0040 IN0005 IN0.
32 SERVICE RECORDS 1ST SERVICE Date of Service:........................................................................... Next Service Due:....................................................................... Signed:................................
Gazco Limited, Osprey Road, Sowton Industrial Estate, Exeter, Devon, England EX2 7JG Tel: (01392) 261999 Fax: (01392) 444148 E-mail: info@gazco.com A member of the Stovax Group.
デバイスStovax PR0919の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Stovax PR0919をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはStovax PR0919の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Stovax PR0919の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Stovax PR0919で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Stovax PR0919を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はStovax PR0919の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Stovax PR0919に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちStovax PR0919デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。