Vulcan-HartメーカーC24EO5の使用説明書/サービス説明書
ページ先へ移動 of 24
This Manual is prepared for the use of tr ained Vulcan Service Technicians and should n ot be used by those not properly qualified. This manual is not intended to be all encompassing.
C24EO SERIES STEAMERS TABLE OF CONTENTS G E N E R A L ................................................................................ 3 Installation, Operation and Cleaning ........................................................ 3 Introduction .....
C24EO SERIES STEAMERS - GENERAL GENERAL INSTALLATION, OPERATION AND CLEANING Refer to the Installation & Operation Manual for specific instructions. INTRODUCTION Features ! Requires no water or drain line connections (manual fill & manual drain).
C24EO SERIES STEAMERS - GENERAL TOOLS Standard ! Standard set of hand tools ! Clear silicone sealant ! VOM with an AC current tester (any quality VOM with a sensitivity of at least 20,000 ohms per volt can be used) ! Temperature meter & thermocouple Special ! Thermal Transfer Compound, Dow Corning 340 Part No.
C24EO SERIES STEAMERS - REMOVAL AND REPLACEMENT OF PARTS REMOVAL AND REPLACEMENT OF PARTS COVERS AND PANELS Side Panels 1. Remove screws from bottom of panel. 2. Slide panel down to clear top cover. 3. Reverse procedure to install. Top Cover 1. Remove SIDE PANELS.
C24EO SERIES STEAMERS - REMOVAL AND REPLACEMENT OF PARTS 2. Disconnect lead wires to component being replaced. 3. Remove component. 4. Reverse procedure to install replacement component and check steamer for proper operation. NOTE: If replacing temperature control, see TEMPERATURE CONTROL CALIBRATION in SERVICE PROCEDURES AND ADJUSTMENTS.
C24EO SERIES STEAMERS - REMOVAL AND REPLACEMENT OF PARTS HIGH LIMIT THERMOSTAT Do not sharply bend and kink, or clamp down on the capillary tube or damage may occur. 1. Remove right SIDE PANEL. 2. Disconnect lead wires from high limit. 3. Remove thermostat from mounting bracket.
C24EO SERIES STEAMERS - REMOVAL AND REPLACEMENT OF PARTS C. Install thermostat hand tight. Do not over tighten . TEMPERATURE PROBE 1. Remove right SIDE PANEL and REAR PANEL. 2. Disconnect probe leads from the temperature control. 3. Remove temperature probe from steam vent pipe.
C24EO SERIES STEAMERS - REMOVAL AND REPLACEMENT OF PARTS 5. Partially remove heating element assembly by pulling assembly towards you. 6. Remove high limit thermostat bulb and bracket.
C24EO SERIES STEAMERS - REMOVAL AND REPLACEMENT OF PARTS DOOR Removal 1. Close door. 2. Remove left SIDE PANEL. 3. Remove nuts from upper hinge located inside front panel. 4. Open door slightly, and while holding door, pull upper hinge away from front panel.
C24EO SERIES STEAMERS - REMOVAL AND REPLACEMENT OF PARTS Handle Installation 1. Apply Lubriplate 630AA around slots of outer door housing where step spacers contact housing. 2. Install door handle into outer door housing such that hinge side of door housing is to the left and arrow on handle is pointed upward.
C24EO SERIES STEAMERS - REMOVAL AND REPLACEMENT OF PARTS Assembly 1. Apply Lubriplate 630AA to sides of sliding bracket. 2. Insert spring pin into bottom of sliding bracket. A. Place spring over spring pin. 3. Assemble sliding bracket into stationary bracket.
C24EO SERIES STEAMER - SERVICE PROCEDURES AND ADJUSTMENTS SERVICE PROCEDURES AND ADJUSTMENTS DOOR LATCH ADJUSTMENT Opening a Jammed Door Should the steamer door jam and cannot be opened, DO NOT FORCE OR PRY the door as damage will occur. 1. Lift up on bottom of door at the handle end to disengage latch.
C24EO SERIES STEAMER - SERVICE PROCEDURES AND ADJUSTMENTS HEATING ELEMENT TEST The heating element assembly contains elements molded into a cast aluminum block. 3 pan units have 6 elements and 5 pan units have 3 elements. See wiring diagrams. 1. Turn cooking mode switch to constant.
C24EO SERIES STEAMER - SERVICE PROCEDURES AND ADJUSTMENTS TEMPERATURE CONTROL CALIBRATION To set the temperature control for optimum steamer operation, the elevation above sea level for the service location must first be determined. The steamer was preset at the factory to sea level.
C24EO SERIES STEAMER - ELECTRICAL OPERATION ELECTRICAL OPERATION COMPONENT FUNCTION B u z z e r ................................ Creates audible signal when timed cook cycle is complete and when a low water condition exists. L i m i t i n g C o n t a c t o r ( 1 C O N ) .
C24EO SERIES STEAMER - ELECTRICAL OPERATION COMPONENT LOCATION CONTROL PANEL COMPONENTS FRONT PANEL COMPONENTS F25386 (June 2010) Page 17 of 24.
C24EO SERIES STEAMER - ELECTRICAL OPERATION SEQUENCE OF OPERATION Schematic diagram AI2851 will be used to explain the electrical sequence of operation. Timed Cooking Mode 1. Conditions. A. Steamer connected to correct voltage and is properly grounded.
C24EO SERIES STEAMER - ELECTRICAL OPERATION 8. Turn cook timer off. A. Timer contacts 11 & 14 open, buzzer is de- energized. B. Steamer reverts to hold temperature and continues to cycle until a cook time is dialed on timer, power switch is turned to off, or the door is opened.
C24EO SERIES STEAMER - ELECTRICAL OPERATION SCHEMATIC DIAGRAM F25386 (June 2010) Page 20 of 24.
C24EO SERIES STEAMER - ELECTRICAL OPERATION WIRING DIAGRAMS - HEATING ELEMENTS C24EO3 - 208V/240V F25386 (June 2010) Page 21 of 24.
C24EO SERIES STEAMER - ELECTRICAL OPERATION C24EO5 - 208V/240V F25386 (June 2010) Page 22 of 24.
C24EO SERIES STEAMER - ELECTRICAL OPERATION C24EO5 - 480V F25386 (June 2010) Page 23 of 24.
C24EO SERIES STEAMER - TROUBLESHOOTING TROUBLESHOOTING SYMPTOM POSSIBLE CAUSES Compartment leaks water around door. 1. Steamer not level. 2. Steamer overfilled. Steam leaks around door. 1. Worn gasket. 2. Damaged gasket. 3. Steam vent pipe blocked. 4.
デバイスVulcan-Hart C24EO5の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Vulcan-Hart C24EO5をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはVulcan-Hart C24EO5の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Vulcan-Hart C24EO5の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Vulcan-Hart C24EO5で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Vulcan-Hart C24EO5を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はVulcan-Hart C24EO5の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Vulcan-Hart C24EO5に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちVulcan-Hart C24EO5デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。