EnviroメーカーC-10794の使用説明書/サービス説明書
ページ先へ移動 of 45
SHERWOOD INDUSTRIES IS AN ENVIRONMENT ALL Y RESPONSIBLE COMP ANY . THIS MANUAL IS PRINTED ON RECYCLED P APER. BY: SHERWOOD INDUSTRIES LTD O WNER ’S MANU AL PLEA SE KEEP THESE INSTRUCTIONS FOR FUTURE.
2 FOR SAFE INST ALLA TION AND OPERA TION OF Y OUR “ENVIR O” HEA TER, PLEASE CAREFULL Y READ THE FOLLO WING INFORMA TION: • All ENVIRO gas-red appliances must be installed in accor dance with their instructions. Carefully read all the instructions in this manual rst.
T able of Contents 3 Safety Precautions.................................................................................. ...................2 T able of Contents..........................................................................................
4 DIRECT VENT ONLY: This type is identied by the sux DV . This appliance draws all of its air f or combustion from outside the dwelling, through a specially designed v ent pipe system.
5 Specific a tions WARNING: Operation of this heater when not connected to a properly installed and maintained venting system can result in carbon monoxide (CO) poisoning and possible death. D IMENSIONS : 16 5 / 8 " (42.2cm) 25 " (65.3cm) 25 " (65.
6 Oper a ting Instructions For Your Safety, Read Safety Precautions And Lighting Instructions Before Operating WARNING: IF YOU DO NOT FOLLOW THESE INSTRUCTIONS EXACTLY A FIRE OR EXPLOSION MAY RESULT, CAUSING PROPERTY DAMAGE, PERSONAL INJURY OF LOSS OF LIFE.
7 2. Start the pilot by pr essing the gas control knob and turning it to PILO T . While holding the gas control knob in, press the piezo ignitor sever al times until the pilot light starts. Hold the gas control knob in for 30 seconds. Check that the pilot has fully engulfed the thermocouple assembly (see Figure 4).
8 Electronic ignition module Maintenance And Ser vice R OUTINE M AINTENANCE : At least once a year , run through the following procedures to ensure the system is clean and working properly . Check the burner to see if all the ports ar e clear and clean.
Figure 7: Handles for Removing Door. Figure 8: Removing of Door. Maintenance And Ser vice R EPLACING THE G LASS : The glass in the replace is a high temperatur e ceramic. If the glass is damaged in any way , a factory replacement is required (see P ARTS L IST - C OMPONENTS ).
Maintenance And Ser vice TO BE INST ALLED BY A QU ALIFIED SERVICE A GENCY ONL Y F UEL C ONVERSION : Warning: This conversion kit shall be installed by a qualied service agency in accordance with the manufacturer’s instructions and all applicable codes and requirements of the authority having jurisdiction.
Step 8. Install the new pilot injector supplied with this conversion kit. Simply screw the new injector inside the pilot hood and reinstall the hood by placing the hood on the assembly , line up the key wa y , and snap into place. Step 9. Remo ve the main burner orice with a inch deep socket.
12 1 In accordance with the current CSA B149, Natur al Gas and Propane Installation Code. 2 In accordance with the current ANSI Z223.1 NFP A 54, National Fuel Gas Code. * These numbers are only estimates. Clearance in accordance with installation codes and the r equirements of the gas supplier .
13 Initial Inst alla tion QUALIFIED INST ALLERS ONL Y V ENT P ARTS : This replace have been tested and certied for use with SIMPSON DURA VENT T YPE GS PIPE FOR GAS ST OVES.
V e n t R e s t r i c t o r P o s i t i o n s 5 4 3 2 1 0’ (0 m) 0’ (0 m) 5’ (1.52 m) 5’ (1.52 m) 10’ (3.05 m) 10’ (3.05 m) 15’ (4.57 m) 15’ (4.
15 Initial Inst alla tion QUALIFIED INST ALLERS ONL Y P LANNING Y OUR I NSTALLATION : When planning your installation, it will be necessary to select the proper length of vent pipe for your particular requirements. It is important to note when passing through a wall, the maximum allowable wall thickness is 10 inches (25.
Initial Inst alla tion QUALIFIED INST ALLERS ONL Y H ORIZONTAL I NSTALLATION : STEP 1. Set the appliance in the desired location. Check to determine if wall studs or roof rafters are in the way when the venting system is attached. If this is the case, you may want to adjust the location of the appliance.
17 and attach to the exterior wall with the four screws pro vided. Before at taching the vent termination to the exterior wall, run a bead of non-hardening mastic around the edges, so as to make a seal between the termination and the wall.
18 NOTES: (1) The four (4) wood screws provided should be replaced with the appropriate fasteners for stucco, brick, concrete, or other types of siding. (2) F or buildings with vinyl siding, a vinyl siding standof f , should be installed between the vent cap and the exterior wall (see Figure 19).
STEP 3. T o install the Round Support B ox/W all Thimble in a at ceiling, cut a 10” square hole in the ceiling, centered in the hole drilled in Step 2. Frame the hole as shown in Figure 23. STEP 4 . Assemble the desired lengths of black pipe and elbows necessary to reach from the appliance adapter up through the Round Support Box.
down to the r oof level, as shown in Figur e 24. Tighten the clamp ar ound the pipe section. Use a level to make sure the pipe is truly vertical. With roong nails, secure the support straps to the roof . Seal the nails holes heads with non-hardening mastic.
21 (2) Any occupied areas above the rst oor , including closets and storage spaces, which the vertical vent passes through, must be enclosed. The enclosure may be fr amed and sheet rocked with standard building materials.
Figure 28: Cathedral Ceiling Support Box Leveling. Figure 29: Cathedral Ceiling Support Box Installation. STEP 6. Complete the cathedral ceiling installation by following the same procedures outlined in Steps 4 through 9 for I NITIAL I NSTALLATION - V ERTICAL I NSTALLATION .
23 3. Set the appliance in the desired location. T emporarily place a 24” (61 cm) section with the non- crimped end on the unit 4. Install the 90° elbow onto the vertical pipe on the stove pointing in the direction that the vent will exit the structure.
Figure 32: Assembly of Venting Kit. 20. Align all str aight sections of pipe, slipping all joints together and installing with thr ee (3) sheet metal screws evenly spaced.
25 Initial Inst alla tion QUALIFIED INST ALLERS ONL Y V ENTING INTO A C LASS ‘A’ C HIMNEY : This model is also certied and tested to vent into CL ASS ‘ A ’ wood stove chimneys. Place the freestanding direct vent appliance in the desired location.
Firebox T op Flue Collar Adapter Undo four " screws that hold flue collar elbow to unit. Figure 34: Step 3 of Converting Top Vented into Rear Vented.
27 Initial Inst alla tion QUALIFIED INST ALLERS ONL Y I NSTALLATION OF T OP V ENTED ; H ORIZONTAL T ERMINATION : Siding Exterior wall Drywall V ent pipe Inside finished collar W all thimble T ermination Figure 37: Installation for Top Vented; Horizontal Termination.
28 Initial Inst alla tion QUALIFIED INST ALLERS ONL Y F REESTANDING D RAFTHOOD A DAPTOR : This Dr afthood Adaptor is a complete assembly and is ready to t onto your Westport in a vertical vent application only . With the Dr afthood Adaptor correctly installed and wired to the gas control v alve.
29 Initial Inst alla tion GENERAL VENTING INFORMATION: Canadian Installations The venting system must be installed in accordance with the current CSA B149 installation code and/or local codes having jurisdiction. U.S.A. Installations The venting system must be installed in accordance with the current National Fuel Gas Code, ANSI Z223.
30 Initial Inst alla tion 4. After a minimum of 10 minutes operation, test the chimney draft with a smoke match at the top row of the pattern to conrm that there is adequate draft or ‘pull’ at the openings around the body of the Drafthood Adaptor , as shown in Figure 42.
31 Initial Inst alla tion QUALIFIED INST ALLERS ONL Y G AS L INE C ONNECTION AND T ESTING : WARNING: Only persons licensed to work with gas piping may make the necessary gas connections to this appliance.
32 Figure 45: Gas Control Valve and Optional Thermostat Wiring. Initial Inst alla tion QUALIFIED INST ALLERS ONL Y E LECTRICAL R EQUIREMENTS F OR G AS V ALVE AND O PTIONAL B LOWER : The ENVIRO WESTPOR T will operate without electrical power .
Fan assembly V alve cover Control panel (Fan control location) Screw hole Figure 47: Optional Blower (Fan) Installation. Second ar y Inst alla tion I NSTALLATION OF O PTIONAL B LOWER : 1. Remove the pre-assembled blower from the packaging. Inspect the blower for damage.
34 1. Carefully remove logs from box. Check to ensure there is no damage. It is very important to install all logs in their proper position to insure safe, optimum operating conditions. 2. Place the log set into the rebox. Locate each log by seating it down onto the burner tra y support pins.
Second ar y Inst alla tion CAUTION: NEVER OPERATE THIS APPLIANCE WITH THE GLASS DOOR REMOVED. Important note: When the unit is turned on for the rst time, It should be turned onto high without the fan on for the rst four (4) hours. This will cure the paint, logs, gasket material and the other products used in the manufacturing process.
36 Figure 57: Top brick panel in place, screws shown. Figure 58: Back brick panel in place. Figure 59: Side brick panels in place. Figure 56: Brick panel bracket, slots shown. 1. Remove the two (2) screws from the rear of the bafe, use a ” socket or a at head screwdriver .
T rouble Shooting Problem Possible Cause Solution Spark will not light the pilot after repeatedly pressing the spark ignitor Defective piezo ignitor . • Check connections to ignitor . • If ignitor connections are good but no spark, replace ignitor .
Reference Number Part Description Part Number 1 T op V ent Insert Piece - P ainted EGWP-503 1 T op V ent Insert Piece - Antique White EGWP-503AW 1 T op V ent Insert Piece - Diamond Black EGWP-503DB 1 .
39 Reference Number Part Description Part Number 6 Cast Leg (Each) - Painted EGWP-508 6 Cast Leg (Each) - Antique White 50-375 6 Cast Leg (Each) - Diamond Black 50-376 6 Cast Leg (Each) - Inferno R ed.
P ar ts Diagr am - Cast WESTPORT - Castings January 2005 40.
41 P ar ts List - Components Reference Number Part Description Part Number 9 120° Ceramic F an T emperature Sensor EC-001 10 S.I.T . Nova V alve NG (50% T urn Down) EC-006 10 S.
P ar ts List - Components Reference Number Part Description Part Number 17 Rating Plate (Label) 30-049 18 Gas V alve Cov er 30-050 Flue Connection 30-051 19 Inner Door Handles (2 per set) 30-052 20 V enturi Adjustment Rod 30-053 21 Firebox 30-054 22 Burner 30-055 23 45° Elbow & Gasket 50-040 24 F an Kit 180 C.
43 P ar ts Diagr am - Components WESTPORT - Components J.
W arr anty Sherwood Industries Ltd. offers a Limited Lifetime Warr anty on this gas product. This limited lifetime warr anty covers the appliance for a period of seven years from the date of installation.
45 Inst alla tion Da t a Sheet The following information must be recorded by the installer f or warr anty purposes and f uture refer ence. NAME OF OWNER: _________________________________________ ADDR.
デバイスEnviro C-10794の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Enviro C-10794をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはEnviro C-10794の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Enviro C-10794の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Enviro C-10794で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Enviro C-10794を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はEnviro C-10794の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Enviro C-10794に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちEnviro C-10794デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。