Huffyメーカー21196804の使用説明書/サービス説明書
ページ先へ移動 of 29
1 10/04 P/N 211968 04 © COPYRIGHT 2004 by HUFFY SPORTS Inground System Owners Manual Customer Service Center • N53 W24700 South Corporate Circle • Sussex, WI 53089 • U.
2 P/N 211968 04 10/04 BEFORE YOU ST ART! T o ensure optimal playability of backboard system, a close tolerance fit between the elevator components and hardware is required. T est-fit large bolts into large holes of elevator tubes, backboard brackets, and triangle plates.
10/04 P/N 211968 04 3 For more information on assembly, placement, proper use, and maintenance, visit The American Basketball Council website at http://www.smarthoops.com. IMPORT ANT! Remove all content s from boxes. Be sure to check inside pole sections; hardware and additional p arts are p acked inside.
4 P/N 211968 04 10/04 SAFETY INSTRUCTIONS Most injuries are caused by misuse and/or not following instructions. Use caution when using this system. • If using a ladder during assembly , use extreme caution. • T wo (2) people are reccomended for this operation.
10/04 P/N 211968 04 5 #8 (9)* #10 (4) HARDW ARE IDENTIFIER (BOL TS & SCREWS) HARDW ARE IDENTIFIER (NUTS & W ASHERS) HARDW ARE IDENTIFIER (MET AL SP ACERS) #13 (2) #7 (2) #1 1 (4) #15 (1)* #20 (2) #24 (6) #21 (1) #31 (2) #27 (6) #42 (1) #46 (1) #45 (1) #47 (4) #9 (4) * You may have extra parts with this model.
6 P/N 211968 04 10/04 #44 (1) #41 (1) #43 (1) HARDW ARE IDENTIFIER (PLASTIC SP ACERS & CLIPS) HARDW ARE IDENTIFIER (OTHER) #23 (4) #22 (4) #12 (2) #39 (2) #33 (12)*.
10/04 P/N 211968 04 7 TOOLS REQUIRED FOR THIS SECTION HARDWARE USED IN THIS SECTION (not actual size) SECTION A: ASSEMBLE THE POLE Phillips-Head Screwdriver (2) 1/2” and (2) 9/16" Wrenches 9/16.
8 P/N 211968 04 10/04 1 TO P MIDDLE BOTT OM 2 3 1. Mark pole sections with tape (not supplied) at indicated dist ances from ends as shown. T ape (Not Supplied) 18" (42.7 cm) 6" (15.2 cm) 24" (61 cm) PLAYING SURFACE GROUND SURFACE 2. Ensure ground is level with playing surface, then dig pole hole.
10/04 P/N 211968 04 9 4. 1" (2.54 cm) SIDE VIEW Fill hole approximately 1/3 full with mixed concrete. FIG . A FLANGE Insert ground sleeve assembly and center in hole ( FIG . A ). Note : Leave 1" below flange exposed for drainage hill. 5. IMPORT ANT!: CONTINUE ON TO NEXT STEP .
10 P/N 211968 04 10/04 4 3 Fill hole completely with concrete. 6. 1" (2.54 cm) 5 1 " (2.54 cm) 7. T amp down concrete to release air pockets and build drainage hill. Level pole section in all directions several times while concrete is curing.
10/04 P/N 211968 04 11 Af ter concrete has cured, remove bottom pole section from ground sleeve (4). Place anti-skid t ape (36) around the bottom area of bottom pole (see note A). KEEP GROUND SLEEVE CAP ON BOTT OM POLE. 36 4 8. 5 Place top edge of anti-skid tape on mark made in step 7.
12 P/N 211968 04 10/04 1 5 9. S tack and bounce bottom (3) and middle (2) pole sections together . Bounce pole sections together until middle section no longer moves toward taped reference mark on bottom pole. 2 IMPORTANT 5 Keep on Bottom Pole 3 Wood Scrap (NOT SUPPLIED) 10.
10/04 P/N 211968 04 13 1 40 7 7 FRONT SIDE 11 . Install pole mount bracket (6) and bracket reinforcement (40) with carriage bolts (7) as shown. T ighten flange nuts (8) completely .
14 P/N 211968 04 10/04 12 6 12 13 13 11 9 10 10 12. 6 8 14 14 17 15 13. Attach sp acers (12, 13) to pole mount bracket (6) with bolts (9), washers (10), and nuts (1 1) as shown. Assemble lanyard (17) to locking pin (16) as shown. Attach covers (14) onto pole mount bracket (6) with carriage bolt (15) and nut (8) as shown.
10/04 P/N 211968 04 15 20 19 38 37 21 18 14. 20 15. 16 Insert handle assembly through pole mount assembly as shown. Lock pole assembly in place at the 10’ (3.05 m) mark with pin (16). Apply logo and height indicator labels (19) to adjustment rod (18) as shown.
16 P/N 211968 04 10/04 SECTION B: ASSEMBLE THE ELEV A T OR TUBES TO BACKBOARD 30 Upper Elevator tube 28 Identify elevator tubes (28 & 30). 9/16” 3/4” 1/2” (2) Wrenches 1/2", (2), 9/16&q.
10/04 P/N 211968 04 17 Attach backboard support bracket s (25) to the backboard frame using bolts (9), sp acers (31), and nuts (1 1) as shown. 1 . 25 31 31 9 11 9 11 2. 27 29 22 22 25 24 47 28 Attach lower elevator tubes (28) and springs (29) to backboard support bracket s (25) using spacers (22), bolt (27), and nut (24) as shown.
18 P/N 211968 04 10/04 22 24 28 28 30 27 25 30 3. 29 22 Attach upper elevator tubes (30) to backboard support bracket s (25) using spacers (22), bolt (27), and nut (24) as shown.
10/04 P/N 211968 04 19 SECTION C: A TT ACH THE BACKBOARD & ELEV A T OR ASSEMBL Y T O POLE SYSTEM 3/4” #27 #46 #24 #45 #23 #39 #44 #43 #33 TOOLS REQUIRED FOR THIS SECTION HARDW ARE USED IN THIS S.
20 P/N 211968 04 10/04 1. 1 24 30 30 23 23 23 23 24 28 28 2. Support pole on sawhorse. Attach backboard assembly to top pole section (1). Install handle assembly to long elevator tubes (28) using bolt (27), spacers (39), and nut (24) as shown. 27 27 27 28 28 24 39 39 USE CAUTION; ELEVATOR ASSEMBLY IS HEAVY.
10/04 P/N 211968 04 21 3. 43 46 45 41 42 Inst all Slam Jam Rim to Backboard 32 44 42 45 46 A B C D E A • Fit rim (32) securely into bracket (41) as shown (Allow "T"-bolt (42) to slip through center hole in rim (32). B • Install reinforcement bracket (43) onto “T” bolt (42) as shown.
22 P/N 211968 04 10/04 4. 24 27 30 30 29 Insert bolt (27) through left side of short elevator tube (30), then stretch spring or springs (29) onto bolt (27). Insert bolt (27) through right side of short elevator tube (30) and secure with nut (24). USE EYE PROTECTION WHEN INST ALLING SPRINGS.
10/04 P/N 211968 04 23 Place rebar with spacers into bottom pole section (3) as shown. . 6. Assemble rebar centering spacers (50) near top and bottom of rebar (49) as shown. 5. 49 Heavy-Duty Tape (Not Included) 50 49 50 50 49 3 Seal hole at the bottom of the bottom pole with heavy-duty tape (not included) to ret ain rebar and concrete inside.
24 P/N 211968 04 10/04 Fill pole with concrete to approximately 1” (2.54 cm) below bottom elevator hole as shown. IMPORT ANT!: W AIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP .
10/04 P/N 211968 04 25 9. Install clip s. Insert one “arm” of clip into ram as shown. T wist “body” of clip slightly so that second “arm” slides over the top of the first “arm” as shown. Push in direction indicated by arrows. Push second “arm” back and into ram as shown.
26 P/N 211968 04 10/04 T wist net until it snap s into position. Net must be centered through clip. NET INST ALLA TION 10. 32 33 34 Insert net into bottom of clip as shown.
10/04 P/N 211968 04 27 SECTION D: UPRIGHT , SECURE AND USE POLE SYSTEM Wedge Hammer None This is what your system will look like when you’ve finished this section: TOOLS REQUIRED FOR THIS SECTION HA.
28 P/N 211968 04 10/04 5 2. 1. Af ter concrete has cured, remove t ape, install pole cap (26), fit pole assembly into sleeve (4). Use wedge to gently tap cap of ground sleeve until tight. 4 PLA YING SURF ACE 26 USE CAUTION; ASSEMBLY IS HEAVY. TWO PEOPLE REQUIRED FOR THIS PROCEDURE.
10/04 P/N 211968 04 29 4. 16 B. A. C. 3. A. While holding handle, remove pin (16). B. Move elevator up or down to desired height. C. Replace pin (16) full length to lock system at desired height. Apply height adjustment label (35) to front of pole as shown.
デバイスHuffy 21196804の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Huffy 21196804をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはHuffy 21196804の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Huffy 21196804の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Huffy 21196804で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Huffy 21196804を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はHuffy 21196804の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Huffy 21196804に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちHuffy 21196804デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。