

INSTALLATION OF PRE-WIRED CALCULITE FRAME-IN-KllS INSTRUCTION SHE~ FOR ITEMS G41O, E61O, F71O IS:E610 R0291 Page 1 of 2
INSTRUCTION SHEET NO.
READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE INSTALLING FIXTURE.
This fixture is intended for installation in accordance with the National Electrical Code and local regulations. To assure full compliance with local codes and regulations, check with your local electrical inspector before installation. To prevent electrical shock, turn off electricity at fuse box before proceeding. Retain these Instructions for maintenance referencw
‘a-.”-:
RETAINING
SPRING
,l#G T ti:EmoR
HOUSING
A. FRAME-IN B. CLOSE.IN C. SNAP-IN b. PUSH-IN
A. FRAME-IN AND WIRE-IN (FIG. 1) 1, Install FRAME-IN SECTION using ADJUSTABLE MOUNTING BRACKET (see below). Wire to supply leads. White fixture lead to neutral supply lead. Black fixture lead to hot (120V.) supply lead. Bare fixture wire to supply ground. Use wirenuts (local hardware items). Place all electrical connections in the J-BOX. Attach J-BOX COVER onto J-BOX.
a. For Flangeless Trim FRAME b. For Overlapping Trim FRAME
Plaster Ceiling.
[-3 FIG. 9 :? ; Plaster or Dry Ceiling. FIG. 8 .J
Set MOUNTING FRAME so the Set MOUNTING FRAME so the bottom edge bottom edge is flush with finished ceiling, as shown. is flush with, no higher than %“ above finished ceiling, as shown.


SEE SEPARATE
Close in ceiling required. REFLECTOR TRIM D. PUSH-IN (FIG. 4) INSTRUCTION SHEETS U.S. Pat. No. 4,039,822
“—-—
ユーザーまたはスタッフが通常1日以内に回答します。あなたの質問が次の人の助けにもなります。
最初の質問を投稿しましょう。他のユーザーや当チームが回答します。