CATALOG NO. 6200.51O Effective: 04-09-07 Replaces: 05-15-05 Models 2100-4001 P/N 240251 Rev. 16 INST ALLA TION AND OPERA TING INSTRUCTIONS RA YTHERM TM COMMMERCIAL SWIMMING POOL HEA TER Models P-926 t.
Content s SECTION 1: RECEIVING EQUIPMENT SECTION 2: GENERAL SPECIFICATIONS SECTION 3: INSTALLATION INSTRUCTIONS Code Requirements Base Installation Clearances Combustion Air Venting Connections Gas Su.
12" Minimu m 12" M inimum 4" Minimum HEA TER Sheet Metal 24 Gauge IMPORTANT NOTICE These instructions are intended for the use of qualified personnel only, specifically trained and experienced in the installation of this type of heating equipment and related system components.
4 Fig. #8245 CLEARANCES ALL HEATERS For clearances from combustible surfaces, see chart below. We require a minimal vertical clearance of three feet between the upper surface of the flue outlet to a non- combustible material.
5' MIN 2' MIN 10' OR LESS 2' MIN VENT CAP VENT PIPE DRAFT HOOD HEA TER For protection against rain or blockage by snow, the vent pipe must terminate with a vent cap which complies with the local codes or, in the absence of such codes, to the latest edition of the National Fuel Gas Code, ANSI Z223.
(a) Seal any unused openings in the common venting system. (b) Visually inspect the venting system for proper size and horizontal pitch and determine there is no blockage or restriction, leakage, corrosion and other deficiencies which could cause an unsafe condition.
GAS PRESSURE REGULATOR The gas pressure regulator is preset and sealed at 4 in. WC for natural gas, and 11 in. WC for propane gas. Between the gas valve and the burners is a 1/8" pipe plug. The pressure at this point, taken with a manometer, should be about 3.
When local codes permit the use of less than four feet high temperature piping or two elbows, provisions should be made to always shut the heater off a minimum of 15 minutes prior to pump shut down in order to carry away residual heat and prevent damage to the low temperature piping.
9 MODELS 1287/1336 - 1758/1826 Inlet/Outlet Header 2-1/2" Inlet 2-1/2" Outlet 1-1/2" Slip Ball Valve 2" Slip Ball Valve 3" Outlet Fig.
10 Raypak recommends the installation of an air bleed vent at a suitable location (usually the highest point) to remove air from the piping system. These units should be available at your local wholesale supplier.
Note: The drawings and instructions above show only one of several acceptable ways of installing the dry well into main system loop. The use of saddle clamps and “Weld O Lets” (shown in Fig. 10) are acceptable. Follow clamp manufacturer’s instructions.
4. If the heater inlet temperature remains less than 100°F and Valve "A" is fully open, leave Valve "A" fully open and throttle Valve "B" until the heater inlet temperature rises to within the range of 100°F-105°F. 5. The resultant heater outlet temperature should be in the range of 120-130°F.
Models 2100 thru 4001 13 PIPING CONFIGURATIONS FOR RAYTHERM COMMERCIAL POOL HEATERS Fig # 9268 Fig # 9269 BLENDED WATER TEMPERATURE (THERMOMETER AT HEATER INLET) HEATER OUTLET TEMPERATURE THERMOMETER .
14 EXTERNAL AUXILIARY BYPASS VALVE (Where Required) 926-1223 Models only An auxiliary bypass valve should be used when flow rates exceed 120 GPM (usually a high performance pump size larger than two HP will exceed this flow rate).
15 HIGH & LOW GAS PRESSURE SWITCHES Pressure switches sense either high or low gas pressure and automatically shut down burners if abnor- mal pressures exsist. Standard on Models 3001-4001. PRESSURE SWITCH GAS MANIFOLD Fig. #8236 ELECTRICAL WIRING CAUTION: Label all wires prior to disconnection when servicing controls.
16 WIRING DIAGRAM MODELS 926 - 1223.
17 WIRING DIAGRAM MODELS 1287-1826.
WIRING DIAGRAM MODELS 2100-2500 18.
WIRING DIAGRAM MODELS 3001-4001 19.
TEMPERATURE CONTROL The pool water temperature is controlled by the pool thermostat. The heater water temperature high limit is controlled by the manual reset high limit. PRESSURE SWITCH The pressure switch, or heater actuator, ensures that the heater operates only when the filter pump is in operation.
ADJUSTMENT KNOB Fig. # 8069.1 PRESSURE SWITCH ADJUSTMENT RANGE HEAT EXCHANGER HEIGHT 5' Max 5' Max Fig. # 8152.0 NOTE: If heater is installed outside of the limits shown, a flow switch must be used in place of the pressure switch when mounted and wired adjacent to the heater.
AFTER START-UP Pilot System Checkout Procedure 1. Turn on power to the ignition systems and turn gas supply off. 2. Check ignition module as follows: a. Set the thermostat above pool water temperature to turn heater on. b. Watch for continuous spark at the pilot burner.
SERVICING PROCEDURES TUBE CLEANING PROCEDURE (TYPICAL) Establish a regular inspection schedule, the fre- quency depending on the local water condition and severity of service. Do not let the tubes clog up solidly. Clean out deposits over 1/16" in thickness.
5. Remove heat exchanger corner brackets. 6. Remove combustion chamber clips at the four corners of the heat exchanger. 7. Lift heat exchanger straight up using caution not to damage refractory. HEAT EXCHANGER REASSEMBLY 1. Heat exchanger header O-rings should be replaced with new ones.
CONTROL WELL REPLACEMENT Remove top, sensing bulb and clip. Collapse well tube at the open end and with a chisel, push through into the header, and remove the well through header. Insert a new well and roll into place. If a roller is not available, solder the well in place with silver solder.
MODELS 926-1223 UNITHERM GOVERNOR INLET/OUTLET HEADER OUTLET INLET Fig. #8224.0 GASKET UNITHERM GOVERNOR WITH POWER ELEMENT MODELS 1287-1826 (Models prior to Jan. '95) DOUBLE EXTERNAL U.G. MODELS 2100-4001 (Models prior to Jan. '95) EXTERNAL U.
SECTION 5 / TROUBLESHOOTING GUIDE IMPORTANT NOTICE These instructions are primarily intended for the use of qualified personnel specifically trained and experienced in the installation of this type of heating equipment and related system components. Installation and service personnel may be required by some states to be licensed.
Outer jacket very hot (paint blistered) *Broken refractory caused by shipping damage or improper combustion………………………….. Excessive sooting of heat exchanger…………………………... Calculate temperature in °F/hr……... Filter not running long enough…….
WARNING HIGH VOLTAGE For qualified Technicians ONLY NOTE: Some heaters may be equipped with an ignition module that shuts off pilot gas if pilot fails to light. To reset, interrupt power to heater. NOTE: Before troubleshooting, familiarize yourself with the start-up and checkout procedure.
SECTION 6 / REPLACEMENT PARTS LIST NOTE: To supply the correct part it is important that you state the model number, serial number and type of gas when applicable.
MODELS: 926/962, 1083/1125, 1178/1223, 1287/1336, 1414/1468, 1571/1631, 1758/1826 31 2-C.
32.
33.
MODELS: 2100, 2500, 3001, 3500, 4001 34.
35.
36.
37 LIMITED W ARRANTY RA YTHERM TYPE P SIZES 0926-4001 SCOPE: Raypak, Inc. (“Raypak”) warrants to the original owner that all parts of this heater which are actually manufactured by Raypak will be free from failure under normal use and service for the specified warranty periods and subject to the conditions set forth in this W arranty .
Raypak, Inc. , 2151 Eastman Avenue, Oxnard, CA 913030 (805) 278-5300 FAX (800) 872-9725 Raypak Canada LTD , 2805 Slough Street, Mississauga, Ontario, Canada L4T 1G2 (905) 677-7999 FAX (905) 677-8036 Litho in U.
デバイスRaypak P-926, P-1826, P-2100, P-4001の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Raypak P-926, P-1826, P-2100, P-4001をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはRaypak P-926, P-1826, P-2100, P-4001の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Raypak P-926, P-1826, P-2100, P-4001の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Raypak P-926, P-1826, P-2100, P-4001で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Raypak P-926, P-1826, P-2100, P-4001を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はRaypak P-926, P-1826, P-2100, P-4001の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Raypak P-926, P-1826, P-2100, P-4001に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちRaypak P-926, P-1826, P-2100, P-4001デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。