Roberts GordenメーカーBH15の使用説明書/サービス説明書
ページ先へ移動 of 25
WARNING Installation must be done by a contractor qualified in the installation and service of gas-fired heating equipment. Improper installation, adjustment, alteration, service or maintenance can result in death, injury or property damage.
© 2001 All rights reserved. No part of this work covered by the copyrights herein may be reproduced or copied in any form or by any means - graphic, electronic, or mechanical, including photocopying, recording, taping or information storage and retrieval systems - without the written permission of Roberts-Gordon.
TABLE OF FIGURES F i gu r e 1: Deleted F i gu r e 2: L i near Ho r i z o n t a l M oun t s . . . . .. . . . .. . . . . 4 F i gu r e 3: L i near, O ne S i d e Re f l ec t o r . . . .. . . . .. . . . . 4 F i gu r e 4: L i near, T w o S i de Re f l ec t o r s .
SECTION 1: H EATER S AFET Y 1 SECTION 1: HEATE R SAFETY Y o ur Safe ty is Im p or ta n t to Us ! This symbol is used throughou t t he manual to notify you of p ossible fire, electr ical or bur n hazards. Pleas e pay special attention wh en reading an d followi ng the war nin gs in these sect ions.
SECTION 3 : C RI TICAL C ONS IDERA TIONS 3 SECTION 3 : CRITICAL CONSIDERATIONS 3.1 Minimum Required Clearances to Combustib les Clearances are the required di st ances that combustible objects must be kept awa y from the heater to p re vent serious f ire haz ards.
BLACKHEAT® I NSTA LLATI ON O PERATION AND S ERVICE M ANUA L 4 3 . 2 C le a ran c e D a t a - NOTE: 1. A ll dimensions are fr o m the T ube surf ace. 2. Clearance s B , C and D can be reduced by 50% after 7 m of t ubing downstream from the burner . 3.
SECTION 3 : C RI TICAL C ONS IDERA TIONS 5 NOTE: 1. All dimens ions are from the T ube surf ace. 2. Clearances B, C and D can be red uc ed by 50 % afte r 7 m of tubing d ownstream from the b ur n er .
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 6 3. 3 Clea rance Dat a -U T u be NOTE: 1. A ll dimensions are fr o m the T ube surf ace. 2. Clearance s B , C and D can be reduced by 50% after 7 m of t ubing downstream from the burner .
SECTION 3 : C RI TICAL C ONS IDERA TIONS 7 NOTE: 1. All dimens ions are from the T ube surf ace. 2. Clearances B, C and D can be red uc ed by 50 % afte r 7 m of tubing d ownstream from the b ur n er .
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 8 SECTION 4: SPECIFICATIONS 4.1 Ma terial Specif ications 4.1.1 C ombustion a nd T ubes First 3 m eters ALUMI-THERM ® steel tubing. Remai ning tu be 1 00 mm d ia. 16 gau ge h eat treate d alum inised mild steel.
SECTION 4: Specifications ------------- ------------- ---------- ------------- ---------- ------------- ------------- ---------- ------------- ------------- ---------- ---------- ------------- ---------- ------------- -- 4.
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 10 4.9 Bu r ner Specificat ions Figure 16: BLACKHE AT ® Lin ear and U-T u be Fan Damper Swirler* Plan View Reflector 171 mm End View I.
SECTION 5: M AJO R C OMPO NEN T D ESCRIPT I ONS 11 SECTION 5: M AJOR COMP ONENT DESCRIPTIONS Bu rne r (shown wi th T u be Gasket) Must be installed wi th the flame obser vation window facing do wn. Reflector (A l umini um or Stainles s Steel) Alter nate overlap as shown on ov e r view .
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 12 SECTION 6: G ENERAL SUSPENSION DETAILS Ste p 6.1 Suspen sion D etails WARNING Suspension Hazard Hang heater with general purpose welded link steel chain, 4 mm or larger in diameter, with working load of 340 Kg.
SECT I ON 7: L I N E A R H E A T ER I N S T A LL A T I ON 13 S E CTI O N 7 : LIN E AR H E AT E R IN S TALLATI O N The figures in this sec tion provi de a general ov er view of c o m p onent p l a c e m ent i n a B L A C K H E A T ® L i n e ar s ys t e m .
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 14 Figure 17: BLACKHE AT ® Lin ear Ge nera l Ass embly Ove r view Fan Tube Reflector Reflector End Cap Reflector Support Burner Coupli.
SECT I ON 7: L I N E A R H E A T ER I N S T A LL A T I ON 15 F i gure 1 8 : B L A C K H E A T ® L i n e ar L a y o ut O v e r v ie w s -[BH55 Not Available] Model Reflect or Overlap (appro x.) a b c d e f g B H 1 5 700 mm 365 m m 50 mm 50 mm 2290 mm 3050 mm 366 mm 291 mm B H 2 0 .
SECT I ON 7: L I N E A R H E A T ER I N S T A LL A T I ON 19 Step 7.3 B urner T ube Install ation Step 7.4 Coup lin g an d T ube Asse mb ly End View Weld Seam Bow Shackle Burner Tube Hanger NOTE: Tubing requires a downward slope of 13 mm per 6 m away from burner.
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 20 Ste p 7.4. 1 Couplin g a nd T ub e Ass em bly (Co ntinue d) Ste p 7.4. 2 Couplin g a nd T ub e Ass em bly (Co ntinue d) WARNING Tighten slidebar as shown below. Tubes will fall down if slidebar is incorrect.
SECT I ON 7: L I N E A R H E A T ER I N S T A LL A T I ON 21 Step 7.5 T ube C lamp P a ckag e Insta lla tion Step 7.6 Re fl ector Instal lation Flat W asher Nut (T orque 13.
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 22 Ste p 7.6. 1 Refle cto r Insta lla tion (C o ntinu ed ) Figure 21: Reflecto r Over l ap De ta il U-Clip (2 clips per alternate overl.
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 24 SECTION 8: U-T UBE HEATE R INSTALLATION The figures in this s ection provide a ge neral overview of compone nt placement in a BLA CKHEA T ® U-T ube syste m. The l ocatio n of some co mponents such as supp or ts and coup lings is cr ucial f or proper installation.
SECTION 8 : U-T UBE H EATER I NS TALLA TI ON 25 Figure 22: BL ACK HEAT ® B H15U T A ss embly O ver v iew 20cm Maximum Coupling 180° U-T ube 457 mm Center to Center U-Clips Reflector End Caps Burner .
BLACKHEAT ® I NSTA LLATI ON O PER ATION AND S ERVI CE M AN UA L 26 Figure 23: BLACKHE AT ® U- T ub e La y out Ove rvie ws Mod el Re fl e cto r Ov erl ap (appro x. ) a b c d e f g B H 1 5 1780 mm 850 mm 50 mm 50 mm 2290 mm 3050 mm 366 mm 291 mm B H 2 0 .
SECTION 8 : U-T UBE H EATER I NS TALLA TI ON 27 Step 8.2 C r itic al Ha ng er P lace m en t Step 8.3 Bu r n er T u be and F a n T u be In sta llatio n 229 cm ± 25cm See Assembly Drawing First Tube and Reflector Hanger Bow Shackle T ube and Reflector Hanger Suspension Chain Optional Hanging Configuration W ashers Bolt (T orque: 13.
デバイスRoberts Gorden BH15の購入後に(又は購入する前であっても)重要なポイントは、説明書をよく読むことです。その単純な理由はいくつかあります:
Roberts Gorden BH15をまだ購入していないなら、この製品の基本情報を理解する良い機会です。まずは上にある説明書の最初のページをご覧ください。そこにはRoberts Gorden BH15の技術情報の概要が記載されているはずです。デバイスがあなたのニーズを満たすかどうかは、ここで確認しましょう。Roberts Gorden BH15の取扱説明書の次のページをよく読むことにより、製品の全機能やその取り扱いに関する情報を知ることができます。Roberts Gorden BH15で得られた情報は、きっとあなたの購入の決断を手助けしてくれることでしょう。
Roberts Gorden BH15を既にお持ちだが、まだ読んでいない場合は、上記の理由によりそれを行うべきです。そうすることにより機能を適切に使用しているか、又はRoberts Gorden BH15の不適切な取り扱いによりその寿命を短くする危険を犯していないかどうかを知ることができます。
ですが、ユーザガイドが果たす重要な役割の一つは、Roberts Gorden BH15に関する問題の解決を支援することです。そこにはほとんどの場合、トラブルシューティング、すなわちRoberts Gorden BH15デバイスで最もよく起こりうる故障・不良とそれらの対処法についてのアドバイスを見つけることができるはずです。たとえ問題を解決できなかった場合でも、説明書にはカスタマー・サービスセンター又は最寄りのサービスセンターへの問い合わせ先等、次の対処法についての指示があるはずです。